Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Active
Buildings
25
Unit types
Row house, Row House25 units in all
Land area for this project
2,431 sq m (26,162 sq ft)
Permissible built-up area
2,527 sq m (27,206 sq ft)
Sanctioned built-up area
2,527 sq m (27,206 sq ft)
Recreational open space
0 sq m (0 sq ft)
Planning authority
उपविभागीय अधिकारी अकोला
Address
Plot No.43A to 56B of S No. 30/2, Mouje Chandur, Akola 444004., Akola, AkolaPIN 444004
Designated bank account
State Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Nisarg Garden Wing R is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2026

Registered
29 Nov 2024
Promised
31 Dec 2026

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5010007821129 Nov 202431 Dec 2026—Dilipkumar Devichand ChaudhariProject page

25 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
R-121
R-1021
R-1121
R-1221
R-221
R-2721
R-2821
R-2921
R-321
R-3021
R-3121
R-3221
R-3321
R-3421
R-3521
R-3621
R-3721
R-3821
R-3921
R-421
R-521
R-621
R-721
R-821
R-921

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

25 units registered

Row house · 1 unitRow House · 24 units
BuildingTypeCarpet areaUnits
R-1Row house115.23 sq m · 1,240 sq ft1
R-10Row House78.98 sq m · 850 sq ft1
R-11Row House78.98 sq m · 850 sq ft1
R-12Row House141.9 sq m · 1,527 sq ft1
R-2Row House78.98 sq m · 850 sq ft1
R-27Row House104.28 sq m · 1,122 sq ft1
R-28Row House79.97 sq m · 861 sq ft1
R-29Row House81.27 sq m · 875 sq ft1
R-3Row House78.98 sq m · 850 sq ft1
R-30Row House83.57 sq m · 900 sq ft1
R-31Row House83.57 sq m · 900 sq ft1
R-32Row House85.17 sq m · 917 sq ft1
R-33Row House130.63 sq m · 1,406 sq ft1
R-34Row House134.3 sq m · 1,446 sq ft1
R-35Row House89.48 sq m · 963 sq ft1
R-36Row House90.78 sq m · 977 sq ft1
R-37Row House91.08 sq m · 980 sq ft1
R-38Row House92.39 sq m · 994 sq ft1
R-39Row House148.43 sq m · 1,598 sq ft1
R-4Row House78.98 sq m · 850 sq ft1
R-5Row House78.98 sq m · 850 sq ft1
R-6Row House123.17 sq m · 1,326 sq ft1
R-7Row House123.17 sq m · 1,326 sq ft1
R-8Row House78.98 sq m · 850 sq ft1
R-9Row House78.98 sq m · 850 sq ft1

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
R-1Closed/Covered00000
R-1Open Space00000
R-10Closed/Covered00000
R-10Open Space00000
R-11Closed/Covered00000
R-11Open Space00000
R-12Closed/Covered00000
R-12Open Space00000
R-2Closed/Covered00000
R-2Open Space00000
R-27Closed/Covered00000
R-27Open Space00000
R-28Closed/Covered00000
R-28Open Space00000
R-29Closed/Covered00000
R-29Open Space00000
R-3Closed/Covered00000
R-3Open Space00000
R-30Closed/Covered00000
R-30Open Space00000
R-31Closed/Covered00000
R-31Open Space00000
R-32Closed/Covered00000
R-32Open Space00000
R-33Closed/Covered00000
R-33Open Space00000
R-34Closed/Covered00000
R-34Open Space00000
R-35Closed/Covered00000
R-35Open Space00000
R-36Closed/Covered00000
R-36Open Space00000
R-37Closed/Covered00000
R-37Open Space00000
R-38Closed/Covered00000
R-38Open Space00000
R-39Closed/Covered00000
R-39Open Space00000
R-4Closed/Covered00000
R-4Open Space00000
R-5Closed/Covered00000
R-5Open Space00000
R-6Closed/Covered00000
R-6Open Space00000
R-7Closed/Covered00000
R-7Open Space00000
R-8Closed/Covered00000
R-8Open Space00000
R-9Closed/Covered00000
R-9Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

R-1

  • Excavation50%
  • Basement (if any)50%
  • Podiums (if any)0%
  • Plinth50%
  • Stilt Floor0%
  • Slabs of Super Structure50%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises40%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

R-10

  • Excavation50%
  • Basement (if any)50%
  • Podiums (if any)0%
  • Plinth50%
  • Stilt Floor0%
  • Slabs of Super Structure50%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises40%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

R-11

  • Excavation50%
  • Basement (if any)50%
  • Podiums (if any)0%
  • Plinth50%
  • Stilt Floor0%
  • Slabs of Super Structure50%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises40%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

R-12

  • Excavation50%
  • Basement (if any)50%
  • Podiums (if any)0%
  • Plinth50%
  • Stilt Floor0%
  • Slabs of Super Structure50%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises40%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

R-2

  • Excavation50%
  • Basement (if any)50%
  • Podiums (if any)0%
  • Plinth50%
  • Stilt Floor0%
  • Slabs of Super Structure50%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises40%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

R-27

  • Excavation50%
  • Basement (if any)50%
  • Podiums (if any)0%
  • Plinth50%
  • Stilt Floor0%
  • Slabs of Super Structure50%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises40%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

R-28

  • Excavation50%
  • Basement (if any)50%
  • Podiums (if any)0%
  • Plinth50%
  • Stilt Floor0%
  • Slabs of Super Structure50%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises40%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

R-29

  • Excavation50%
  • Basement (if any)50%
  • Podiums (if any)0%
  • Plinth50%
  • Stilt Floor0%
  • Slabs of Super Structure50%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises40%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

R-3

  • Excavation50%
  • Basement (if any)50%
  • Podiums (if any)0%
  • Plinth50%
  • Stilt Floor0%
  • Slabs of Super Structure50%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises40%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

R-30

  • Excavation50%
  • Basement (if any)50%
  • Podiums (if any)0%
  • Plinth50%
  • Stilt Floor0%
  • Slabs of Super Structure50%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises40%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

R-31

  • Excavation50%
  • Basement (if any)50%
  • Podiums (if any)0%
  • Plinth50%
  • Stilt Floor0%
  • Slabs of Super Structure50%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises40%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

R-32

  • Excavation50%
  • Basement (if any)50%
  • Podiums (if any)0%
  • Plinth50%
  • Stilt Floor0%
  • Slabs of Super Structure50%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises40%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

R-33

  • Excavation50%
  • Basement (if any)50%
  • Podiums (if any)0%
  • Plinth50%
  • Stilt Floor0%
  • Slabs of Super Structure50%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises40%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

R-34

  • Excavation50%
  • Basement (if any)50%
  • Podiums (if any)0%
  • Plinth50%
  • Stilt Floor0%
  • Slabs of Super Structure50%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises40%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

R-35

  • Excavation50%
  • Basement (if any)50%
  • Podiums (if any)0%
  • Plinth50%
  • Stilt Floor0%
  • Slabs of Super Structure50%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
  • Sanitary Fittings within the flats / premises50%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

R-36

  • Excavation50%
  • Basement (if any)50%
  • Podiums (if any)0%
  • Plinth50%
  • Stilt Floor0%
  • Slabs of Super Structure50%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises40%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

R-37

  • Excavation50%
  • Basement (if any)50%
  • Podiums (if any)0%
  • Plinth50%
  • Stilt Floor0%
  • Slabs of Super Structure50%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises40%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

R-38

  • Excavation50%
  • Basement (if any)50%
  • Podiums (if any)0%
  • Plinth50%
  • Stilt Floor0%
  • Slabs of Super Structure50%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises40%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

R-39

  • Excavation50%
  • Basement (if any)50%
  • Podiums (if any)0%
  • Plinth50%
  • Stilt Floor0%
  • Slabs of Super Structure50%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises40%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

R-4

  • Excavation50%
  • Basement (if any)50%
  • Podiums (if any)0%
  • Plinth50%
  • Stilt Floor0%
  • Slabs of Super Structure50%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises40%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

R-5

  • Excavation50%
  • Basement (if any)50%
  • Podiums (if any)0%
  • Plinth50%
  • Stilt Floor0%
  • Slabs of Super Structure50%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises40%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

R-6

  • Excavation50%
  • Basement (if any)50%
  • Podiums (if any)0%
  • Plinth50%
  • Stilt Floor0%
  • Slabs of Super Structure50%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises40%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

R-7

  • Excavation50%
  • Basement (if any)50%
  • Podiums (if any)0%
  • Plinth50%
  • Stilt Floor0%
  • Slabs of Super Structure50%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises40%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

R-8

  • Excavation50%
  • Basement (if any)50%
  • Podiums (if any)0%
  • Plinth50%
  • Stilt Floor0%
  • Slabs of Super Structure50%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises40%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

R-9

  • Excavation50%
  • Basement (if any)50%
  • Podiums (if any)0%
  • Plinth50%
  • Stilt Floor0%
  • Slabs of Super Structure50%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises40%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyNot applicable
  • Sewerage (Chamber, Lines, Septic Tank , STP)Not applicable
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingNot applicable
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

38 documents held by Deedo, 58 filings listed on MahaRERA's project page

Title

Encumbrances

Form b

Form 1s

Form 2s

Commencement certificates

Others

Allotment letters

Registration certificate

Form 2as

Layout plan

Document library

  • Copy of the legal title reportTittle Report.pdf · uploaded 16 Oct 2024View
  • a Details of encumbrances concerned to FinanceNo Encumbrance Financial.pdf · uploaded 16 Oct 2024View
  • b Details of encumbrances concerned to LegalNo Encumbrance Financial.pdf · uploaded 16 Oct 2024View
  • a Details of encumbrances concerned to FinanceNo Encumbrance Legal.pdf · uploaded 16 Oct 2024View
  • b Details of encumbrances concerned to LegalNo Encumbrance Legal.pdf · uploaded 16 Oct 2024View
  • Copy of Layout Approval (in case of layout)Plan_11zon (3).pdf · uploaded 16 Oct 2024View
  • Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 16 Oct 2024View
  • Building Plan Approval / NA Order for plotted developmentPlan_11zon (3).pdf · uploaded 16 Oct 2024View
  • Declaration about Commencement CertificateDCC Multipul buildings.pdf · uploaded 16 Oct 2024View
  • Declaration in FORM BForm b.pdf · uploaded 16 Oct 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect.pdf · uploaded 16 Oct 2024View
  • Disclosure of Interest in Other Real Estate OrganizationsInterest in Other Projects - Promoter Letterhead.pdf · uploaded 16 Oct 2024View
  • Declaration about all RERA Designated Bank Accounts (Format A)Format A - Promoter Letterhead.pdf · uploaded 16 Oct 2024View
  • Deviation Report with respect to Allotment letterDeviation Allotment Flat Own Land.pdf · uploaded 16 Oct 2024View
  • Deviation Report with respect to model copy of AgreementDeviation ATS Apartment Own Land.pdf · uploaded 16 Oct 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 (3).pdf · uploaded 16 Oct 2024View
  • Other – Legalचांदुर_30_2_R_Satbara.pdf · uploaded 16 Oct 2024View
  • Other – Legalsale deed nisarg garden wing r.pdf · uploaded 16 Oct 2024View
  • Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Bank Account Details.pdf · uploaded 16 Oct 2024View
  • Proforma of Allotment letterAllotment Letter Flat Own Land.pdf · uploaded 16 Oct 2024View
  • CERSAI detailsCersai report.pdf · uploaded 16 Oct 2024View
  • CERSAI detailsCERSAI Declaration.pdf · uploaded 16 Oct 2024View
  • Other – TechnicalDeclaration of Non Registration Layout Project.pdf · uploaded 17 Oct 2024View
  • Commencement Certificates / NA Order for plotted developmentPlinth Intimation (1).pdf · uploaded 17 Oct 2024View
  • Disclosure for secured/unsecured finance availed for the project1 Disclosure for secured_unsecured finance availed for the project (1).pdf · uploaded 21 Oct 2024View
  • Commencement Certificates / NA Order for plotted developmentrera (3).pdf · uploaded 24 Oct 2024View
  • Commencement Certificates / NA Order for plotted developmentilovepdf_merged (61).pdf · uploaded 24 Oct 2024View
  • Other – LegalDoc No 27 Plot no 48 to 51 (1)_compressed (2).pdf · uploaded 29 Oct 2024View
  • Proforma of Agreement for sale1 Proforma of Agreement for sale (4) (1).pdf · uploaded 29 Oct 2024View
  • Commencement Certificates / NA Order for plotted developmentNisarg Email.pdf · uploaded 18 Nov 2024View
  • Form 1Form 1 - Architect.pdf · uploaded 20 Jan 2026View
  • Form 2Form 2 - Engineer.pdf · uploaded 20 Jan 2026View
  • Disclosure of Sold and Booked InventoryInventory Disclosure.pdf · uploaded 20 Jan 2026View
  • Form 1Form 1 - Architect.pdf · uploaded 20 Jan 2026View
  • Form 2Form 2 - Engineer.pdf · uploaded 20 Jan 2026View
  • Disclosure of Sold and Booked InventoryInventory Disclosure - Promoter Letterhead.pdf · uploaded 20 Jan 2026View
  • Form 1Form 1 - Architect.pdf · uploaded 20 Jan 2026View
  • Form 2Form 2 - Engineer.pdf · uploaded 20 Jan 2026View
  • Disclosure of Sold and Booked InventoryInventory Disclosure - Promoter Letterhead.pdf · uploaded 20 Jan 2026View
  • Form 1Form 1 - Architect.pdf · uploaded 20 Jan 2026View
  • Form 2Form 2 - Engineer.pdf · uploaded 20 Jan 2026View
  • Disclosure of Sold and Booked InventoryInventory Disclosure - Promoter Letterhead.pdf · uploaded 20 Jan 2026View
  • Form 1Form 1 - Architect.pdf · uploaded 20 Jan 2026View
  • Form 2Form 2 - Engineer.pdf · uploaded 20 Jan 2026View
  • Disclosure of Sold and Booked InventoryInventory Disclosure - Promoter Letterhead.pdf · uploaded 20 Jan 2026View
  • Form 1Form 1.pdf · uploaded 18 Apr 2026View
  • Form 2Form 2.pdf · uploaded 18 Apr 2026View
  • Disclosure of Sold and Booked Inventoryinventory.pdf · uploaded 18 Apr 2026View
  • Form 2A (FY 2024-2025)Form 2A 2425.pdf · uploaded 10 Aug 2026View
  • Form 2A (FY 2025-2026)Form 2A 2526.pdf · uploaded 10 Aug 2026View

Promoter documents

  • Legal Title reportTittle Report.pdf · uploaded 16 Oct 2024View
  • Declaration Form BForm b.pdf · uploaded 16 Oct 2024View

Technical documents

  • Building Plan ApprovalPlan_11zon (3).pdfView
  • Layout ApprovalPlan_11zon (3).pdfView

Other legal documents

  • Other – LegalDoc No 27 Plot no 48 to 51 (1)_compressed (2).pdfView
  • Other – Legalsale deed nisarg garden wing r.pdfView
  • Other – Legalचांदुर_30_2_R_Satbara.pdfView

Proforma allotment letter

  • Proforma allotment letterAllotment Letter Flat Own Land.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Akola (M Corp.), Akola taluka

Survey, CTS, gat or plot numbers

Plot No.43A to 56B of S No. 30/2

As published on MahaRERA's project page

Plot No.43A to 56B of S No. 30/2, Mouje Chandur, Akola 444004.

Boundaries

North
Road
South
Plot
East
Road
West
Plot

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectShyam Thakur—
Chartered accountantV N Kambale & Co CA Vaibhav Kambale—
EngineerMangalkumar Chaudhari—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology