Skip to content
Deedo home
Menu

Maharaja Dhiraj

Completed

Akola (M Corp.), Akola 444005 |Promoter: Santosh Ghanshyamdas Mohta

Residential / Group HousingRERAP50100021791
29 Jul 2019Registered with MahaRERA
30 Dec 2021Promised completion
1Building
16Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
2BHK16 units in all
Land area for this project
600 sq m (6,458 sq ft)
Permissible built-up area
1,018 sq m (10,960 sq ft)
Sanctioned built-up area
1,018 sq m (10,960 sq ft)
Address
2 and 3/1 survey number 37/3, Jyoti Nagar, Kela LayoutPIN 444005
Designated bank account
Hdfc Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 20.43170, 77.01106
Maharaja Dhiraj is at latitude 20.43170, longitude 77.01106.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Dec 2021

The latest completion date on record passed 4 years and 10 months ago.

Registered
29 Jul 2019
Promised
30 Dec 2021

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5010002179129 Jul 201930 Dec 2021—Santosh Ghanshyamdas MohtaProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Maharaja Dhiraj516

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

16 units registered

2BHK · 16 units
TypeCarpet areaUnits
2BHK69.86 sq m · 752 sq ft12
2BHK71.99 sq m · 775 sq ft4

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space000024

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Maharaja Dhiraj

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyWater Connection from Corporation0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Common Septic Tank for All Flats0%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingRain Water Harvesting0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

9 documents held by Deedo, 14 filings listed on MahaRERA's project page

Commencement certificate

Title

Form b

Completion

Form 4

Registration certificate

Other

Layout plan

Allotment letter

Document library

  • Proforma of Allotment letterMaharaja Dhiraj _Agreement -1.pdf · uploaded 29 Mar 2019View
  • Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 29 Mar 2019View
  • Building Plan Approval (IOD)Building Plan.pdf · uploaded 29 Mar 2019View
  • Copy of the legal title reportSearch Report-compressed.pdf · uploaded 6 Apr 2019View
  • Details of encumbrancesNo Encumberance Certificate.pdf · uploaded 11 Apr 2019Source
  • Declaration in FORM BForm B (Notarized).pdf · uploaded 11 Apr 2019View
  • Copy of Layout Approval (in case of layout)Layout Map.pdf · uploaded 17 May 2019View
  • Architect’s Certificate on Completion of Project (Form 4)Form 4.pdf · uploaded 4 Aug 2020View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOccupation Certificate.pdf · uploaded 4 Aug 2020View

Promoter documents

  • Legal Title reportSearch Report-compressed.pdf · uploaded 6 Apr 2019View
  • Declaration Form BForm B (Notarized).pdf · uploaded 11 Apr 2019View

Technical documents

  • Building Plan ApprovalBuilding Plan.pdfView
  • Layout ApprovalLayout Map.pdfView

Proforma allotment letter

  • Proforma allotment letterMaharaja Dhiraj _Agreement -1.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Akola (M Corp.), Akola taluka

Survey, CTS, gat or plot numbers

23/1 survey number 37/337/3

As published on MahaRERA's project page

2 and 3/1 survey number 37/3

Boundaries

North
Property of Shri Tayade
South
Plot number 4
East
Service Lane
West
Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectRajesh Sharma—
Chartered accountantShah Baheti & Chandak—
EngineerMr P R Pathrikar—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology