Lotus Park

Active

Akola (M Corp.), Akola 444104 |Promoter: Pankaj Rameshchandra Kothari

Residential / Group HousingRERAP50100047492
2 Nov 2022Registered with MahaRERA
31 Dec 2026Promised completion
10Buildings
1MahaRERA listings and orders

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Active
Buildings
10
Land area for this project
6,238 sq m (67,145 sq ft)
Permissible built-up area
19,995 sq m (2,15,229 sq ft)
Sanctioned built-up area
19,995 sq m (2,15,229 sq ft)
Planning authority
Akola Municipal Corporation
Address
Survey No. 4/1-A, Plot No. 01, Opposite Tukaram Bidkar School, ShivaniPIN 444104
Designated bank account
Akola Janata Commercial Cooperative Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 20.68789, 77.05348
Lotus Park is at latitude 20.68789, longitude 77.05348.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2026

Registered
2 Nov 2022
Promised
31 Dec 2026

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P501000474922 Nov 202231 Dec 2026—Pankaj Rameshchandra KothariProject page

10 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
A18—
A28—
A38—
B18—
B28—
C12—
C22—
C32—
C42—
C52—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
A1Closed/Covered1003200132
A1Open Space00000
A2Closed/Covered1244000164
A2Open Space00000
A3Closed/Covered1402500165
A3Open Space00000
B1Closed/Covered70220092
B1Open Space00000
B2Closed/Covered50150065
B2Open Space00000
C1Closed/Covered00000
C1Open Space1890027
C2Closed/Covered00000
C2Open Space1890027
C3Closed/Covered00000
C3Open Space42006
C4Closed/Covered00000
C4Open Space20100030
C5Closed/Covered00000
C5Open Space24120036

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

A1

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure60%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

A2

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure50%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

A3

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises90%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B1

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B2

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

C1

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth90%
  • Stilt Floor50%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

C2

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

C3

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

C4

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

C5

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsFootpaths0%
  • Water SupplyWater Supply0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Septic tank0%
  • Storm Water DrainsStorm Water Drains0%
  • Landscaping & Tree PlantingTree Plantation0%
  • Street LightingStreet Lighting0%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingRain Water Harvesting0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsFire Extinguisher0%
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

43 documents held by Deedo, 55 filings listed on MahaRERA's project page

Commencement certificates

Form b

Encumbrances

Others

Allotment letters

Title

Registration certificate

Form 5s

Form 1s

Form 2s

Form 2as

Layout plan

Building plan

Document library

  • Copy of Layout Approval (in case of layout)Lotus Park NOC Shivni AKola.pdf · uploaded 8 Aug 2022View
  • Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 8 Aug 2022View
  • Declaration in FORM BFORM B.pdf · uploaded 8 Aug 2022View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameSeprate bank Account.pdf · uploaded 8 Aug 2022View
  • a Details of encumbrances concerned to FinanceFinance Encumberance.pdf · uploaded 24 Aug 2022View
  • b Details of encumbrances concerned to LegalLegal Encumberance.pdf · uploaded 24 Aug 2022View
  • Declaration about Commencement CertificateDeclaration about Commencementg Certificate.pdf · uploaded 24 Aug 2022View
  • CERSAI detailsDeclaration abour security interest along with CERSAI report.pdf · uploaded 24 Aug 2022View
  • Proforma of Allotment letterAgreement to Sale.pdf · uploaded 24 Aug 2022View
  • Proforma of Agreement for saleAgreement to Sale.pdf · uploaded 24 Aug 2022View
  • Deviation Report with respect to model copy of AgreementDeviation with Agreement to sale.pdf · uploaded 24 Aug 2022View
  • Copy of the legal title reportLegal search report.pdf · uploaded 3 Oct 2022View
  • Building Plan Approval / NA Order for plotted developmentSanction Map.pdf · uploaded 3 Oct 2022View
  • Proforma of Agreement for saleALLOTMENT LEITER -LP.pdf · uploaded 3 Oct 2022View
  • Proforma of Allotment letterALLOTMENT LEITER -LP.pdf · uploaded 3 Oct 2022View
  • Deviation Report with respect to Allotment letterDEVIATION REPORT.pdf · uploaded 3 Oct 2022View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)LP FROM 5.pdf · uploaded 20 Oct 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 21122 TO 311222.pdf · uploaded 25 Apr 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 1123 TO 31323.pdf · uploaded 25 Apr 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 010423 TO 300623.pdf · uploaded 25 Apr 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 010723 TO 300923.pdf · uploaded 25 Apr 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 11023 TO 311223.pdf · uploaded 25 Apr 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 010124 TO 310324.pdf · uploaded 25 Apr 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 02-11-22 to 31-12-22.pdf · uploaded 25 Apr 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 01-01-23 to 31-03-23.pdf · uploaded 25 Apr 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 01-04-23 to 30-06-23.pdf · uploaded 25 Apr 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 01-07-23 to 30-09-23.pdf · uploaded 25 Apr 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 01-10-23 to 31-12-23.pdf · uploaded 25 Apr 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 01-01-24 to 31-03-24.pdf · uploaded 25 Apr 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A 2024.pdf · uploaded 25 Apr 2024View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 23-24.pdf · uploaded 30 Oct 2024View
  • Form 1Form 1 310325.pdf · uploaded 8 Oct 2025View
  • Form 2Form 2 310325.pdf · uploaded 8 Oct 2025View
  • Disclosure of Sold and Booked InventorySold unsold 310325.pdf · uploaded 8 Oct 2025View
  • Form 2A (FY 2023-2024)LP 31-03-2023.pdf · uploaded 8 Oct 2025View
  • Form 2A (FY 2022-2023)LP 31-03-2024.pdf · uploaded 8 Oct 2025View
  • Form 2A (FY 2024-2025)LP 31-03-2025.pdf · uploaded 8 Oct 2025View
  • Withdrawal Update Form 1Form 1 300625.pdf · uploaded 8 Oct 2025View
  • Withdrawal Update Form 2Form 2 300625.pdf · uploaded 8 Oct 2025View
  • Withdrawal Update Form 1Form 1 300625.pdf · uploaded 27 Dec 2025View
  • Withdrawal Update Form 2Form 2 300625.pdf · uploaded 27 Dec 2025View
  • Withdrawal Update Form 1uploaded 27 Dec 2025Source
  • Withdrawal Update Form 2uploaded 27 Dec 2025Source
  • Form 5 (FY 2024-2025)From 5 LP.pdf · uploaded 10 Jan 2026View
  • Withdrawal Update Form 1Form 1.pdf · uploaded 7 Feb 2026View
  • Withdrawal Update Form 2Form 2.pdf · uploaded 7 Feb 2026Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 2 May 2026View
  • Withdrawal Update Form 2Form 2.pdf · uploaded 2 May 2026Source
  • Withdrawal Update Form 1Form 1 300626.pdf · uploaded 18 Jul 2026View
  • Withdrawal Update Form 2Form 2 300626.pdf · uploaded 18 Jul 2026View

Promoter documents

  • Declaration Form BFORM B.pdf · uploaded 8 Aug 2022View
  • Legal Title reportLegal search report.pdf · uploaded 3 Oct 2022View

Technical documents

  • Building Plan ApprovalSanction Map.pdfView
  • Layout ApprovalLotus Park NOC Shivni AKola.pdfView

Proforma allotment letter

  • Proforma allotment letterALLOTMENT LEITER -LP.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

What MahaRERA has published about this project. A listing records what the authority published; it is not a judgment of the project.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Akola (M Corp.), Akola taluka

Survey, CTS, gat or plot numbers

01Plot No. 01Survey No. 4/1A

As published on MahaRERA's project page

Survey No. 4/1-A, Plot No. 01

Boundaries

North
MIDC Phase I
South
Government Road and House ofJagtap
East
MSEB Power Station
West
Land of Wasudeo Murumkar

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectKamlesh Kriplani—
ArchitectNandan Mahalle—
Chartered accountantAgrawal Bajoria Padiya & Associates—
Chartered accountantP.c.bhandari & Co.—
EngineerPradeep Agrawal—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project page · MahaRERA regulatory lists and ordersData through is when MahaRERA's project page was last read.Methodology