BLD_006992Completed5 floors

Landmark Tower · Landmark

Akola (M Corp.) · RERA P50100023563

5Sanctioned habitable floorsregistration certificate
30 Mar 2024Promised completion

Floors

5 sanctioned habitable floors, as registered. MahaRERA doesn't publish flat-by-flat records, so floors are shown without flats.

As registered

RERA registration
P50100023563 · registered 19 Dec 2019
Promised completion
30 Mar 2024
Sanctioned habitable floors
5

Unit inventory

Apartments and other units by type, from MahaRERA's project page.

TypeCarpet areaUnitsBooked
1BHK73.3 m² (789 sq.ft)1not published
1BHK73.3 m² (789 sq.ft)1not published
1BHK79.8 m² (859 sq.ft)1not published
1BHK79.8 m² (859 sq.ft)1not published
1BHK83.6 m² (900 sq.ft)1not published
1BHK83.6 m² (900 sq.ft)1not published
1BHK102.6 m² (1,104 sq.ft)1not published
1BHK102.6 m² (1,104 sq.ft)1not published
Shop21.2 m² (228 sq.ft)1not published
Shop22 m² (237 sq.ft)1not published
Shop22.1 m² (238 sq.ft)1not published
Shop22.5 m² (242 sq.ft)1not published
Shop22.9 m² (246 sq.ft)1not published
Shop23.4 m² (252 sq.ft)1not published
Shop27.9 m² (300 sq.ft)1not published
Shop28.5 m² (307 sq.ft)1not published
Shop33.1 m² (357 sq.ft)1not published
Shop33.7 m² (363 sq.ft)1not published
Shop33.7 m² (363 sq.ft)1not published
Shop35.5 m² (382 sq.ft)1not published
Shop45.5 m² (490 sq.ft)1not published
Shop45.9 m² (494 sq.ft)1not published
Shop46.5 m² (501 sq.ft)1not published
Shop46.7 m² (502 sq.ft)1not published
Shop47.2 m² (508 sq.ft)1not published
Shop63.5 m² (683 sq.ft)1not published
Shop66.5 m² (716 sq.ft)1not published
Total27

Parking

Spaces as declared on MahaRERA's project page.

TypeTwo-wheelerFour-wheelerVisitorTotal
Closed/Covered0000
Open Space000122

Construction progress

Work completed on this building, as the promoter reported it to MahaRERA (Form 1).

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Data through9 Oct 2026SourcesMahaRERA registration certificate · MahaRERA project pageFloors and units are as registered; a promoter can revise them in later filings.Methodology