BLD_007050Completed5 floors
Anandam · Anandam
Akola (M Corp.) · RERA P50100045938
5Sanctioned habitable floorsregistration certificate
28 Feb 2024Revised completionpromised 31 Dec 2023
Floors
5 sanctioned habitable floors, as registered. MahaRERA doesn't publish flat-by-flat records, so floors are shown without flats.
As registered
- RERA registration
- P50100045938 · registered 15 Jun 2022
- Promised completion
- 31 Dec 2023
- Revised completion
- 28 Feb 2024
- Sanctioned habitable floors
- 5
Unit inventory
Apartments and other units by type, from MahaRERA's project page.
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 2BHK | 73.3 m² (789 sq.ft) | 4 | not published |
| 2BHK | 73.6 m² (792 sq.ft) | 4 | not published |
| 3BHK | 100.2 m² (1,079 sq.ft) | 4 | not published |
| 3BHK | 100.5 m² (1,082 sq.ft) | 4 | not published |
| Shop | 17.4 m² (187 sq.ft) | 2 | not published |
| Shop | 19.4 m² (209 sq.ft) | 2 | not published |
| Total | 20 |
Parking
Spaces as declared on MahaRERA's project page.
| Type | Two-wheeler | Four-wheeler | Visitor | Total |
|---|---|---|---|---|
| Closed/Covered | 0 | 0 | 0 | 44 |
| Open Space | 0 | 0 | 0 | 0 |
Construction progress
Work completed on this building, as the promoter reported it to MahaRERA (Form 1).
- Excavation100%
- Basement (if any)100%
- Podiums (if any)0%
- Plinth100%
- Stilt Floor0%
- Slabs of Super Structure100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
- Sanitary Fittings within the flats / premises100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Data through9 Oct 2026SourcesMahaRERA registration certificate · MahaRERA project pageFloors and units are as registered; a promoter can revise them in later filings.Methodology