BLD_007036Not yet due6 floors

Building C · Akola Trade market

Akola (M Corp.) · RERA P50100033140

6Sanctioned habitable floorsregistration certificate
31 Dec 2027Promised completion

Floors

6 sanctioned habitable floors, as registered. MahaRERA doesn't publish flat-by-flat records, so floors are shown without flats.

As registered

RERA registration
P50100033140 · registered 9 Feb 2022
Promised completion
31 Dec 2027
Sanctioned habitable floors
6

Unit inventory

Apartments and other units by type, from MahaRERA's project page.

TypeCarpet areaUnitsBooked
Hall142 m² (1,528 sq.ft)3not published
Hall149 m² (1,604 sq.ft)3not published
Shop21.5 m² (231 sq.ft)1not published
Shop22.5 m² (242 sq.ft)1not published
Shop30 m² (323 sq.ft)1not published
Shop38.4 m² (413 sq.ft)1not published
Shop42 m² (452 sq.ft)1not published
Shop44 m² (474 sq.ft)1not published
Shop80 m² (861 sq.ft)1not published
Total13

Parking

Spaces as declared on MahaRERA's project page.

TypeTwo-wheelerFour-wheelerVisitorTotal
Closed/Covered0001
Open Space0001

Construction progress

Work completed on this building, as the promoter reported it to MahaRERA (Form 1).

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Data through9 Oct 2026SourcesMahaRERA registration certificate · MahaRERA project pageFloors and units are as registered; a promoter can revise them in later filings.Methodology