BLD_007035Not yet due2 floors

Building B · Akola Trade market

Akola (M Corp.) · RERA P50100033140

2Sanctioned habitable floorsregistration certificate
31 Dec 2027Promised completion

Floors

2 sanctioned habitable floors, as registered. MahaRERA doesn't publish flat-by-flat records, so floors are shown without flats.

As registered

RERA registration
P50100033140 · registered 9 Feb 2022
Promised completion
31 Dec 2027
Sanctioned habitable floors
2

Unit inventory

Apartments and other units by type, from MahaRERA's project page.

TypeCarpet areaUnitsBooked
Shop14.6 m² (157 sq.ft)1not published
Shop22.5 m² (242 sq.ft)1not published
Shop23.4 m² (252 sq.ft)1not published
Shop25.5 m² (274 sq.ft)4not published
Shop31.5 m² (339 sq.ft)1not published
Shop32.5 m² (350 sq.ft)1not published
Shop33.2 m² (357 sq.ft)2not published
Shop34.4 m² (370 sq.ft)39not published
Shop36.6 m² (394 sq.ft)4not published
Shop41.3 m² (445 sq.ft)7not published
Shop41.9 m² (451 sq.ft)2not published
Shop46.6 m² (502 sq.ft)12not published
Shop49.7 m² (535 sq.ft)1not published
Shop53.2 m² (573 sq.ft)2not published
Shop53.4 m² (575 sq.ft)1not published
Shop55.9 m² (602 sq.ft)11not published
Shop60.1 m² (647 sq.ft)1not published
Shop60.4 m² (650 sq.ft)1not published
Shop61.8 m² (665 sq.ft)2not published
Shop63.8 m² (687 sq.ft)3not published
Shop66.4 m² (715 sq.ft)1not published
Shop70.5 m² (759 sq.ft)2not published
Shop71.5 m² (770 sq.ft)1not published
Shop74.1 m² (798 sq.ft)1not published
Shop76.5 m² (823 sq.ft)6not published
Shop79.2 m² (853 sq.ft)2not published
Shop79.6 m² (857 sq.ft)9not published
Shop80.5 m² (866 sq.ft)10not published
Shop87.8 m² (945 sq.ft)2not published
Shop102.5 m² (1,103 sq.ft)1not published
Shop106.6 m² (1,147 sq.ft)1not published
Total133

Parking

Spaces as declared on MahaRERA's project page.

TypeTwo-wheelerFour-wheelerVisitorTotal
Closed/Covered0000
Open Space0001

Construction progress

Work completed on this building, as the promoter reported it to MahaRERA (Form 1).

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure50%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
  • Sanitary Fittings within the flats / premises5%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks5%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.5%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Data through9 Oct 2026SourcesMahaRERA registration certificate · MahaRERA project pageFloors and units are as registered; a promoter can revise them in later filings.Methodology