Akkalkot, Akola 444002 |Promoter: B G Steel And Infra

14 Jun 2019Registered with MahaRERA
30 May 2024Promised completion
6Buildings
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Commercial
Status on MahaRERA
Active
Buildings
6
Land area for this project
11,100 sq m (1,19,479 sq ft)
Permissible built-up area
15,687 sq m (1,68,857 sq ft)
Sanctioned built-up area
15,687 sq m (1,68,857 sq ft)
Recreational open space
1,113 sq m (11,980 sq ft)
Planning authority
Akola Municipal Corporation
Address
Survey 2/1, Mouje Akkalkot, Mini Byepass, Washim Road, Mouje Akkalkot, AkolaPIN 444002
Designated bank account
State Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 20.69370, 76.98565
Bill-Mart is at latitude 20.69370, longitude 76.98565.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 May 2024

The latest completion date on record passed 2 years and 5 months ago.

Registered
14 Jun 2019
Promised
30 May 2024

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5010002123914 Jun 201930 May 2024—B G Steel And InfraProject page

6 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Bill-Mart5—
Section AA A4—
Section AA B4—
Section AA C4—
Section AA D4—
Section AA E5—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space0000201

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Bill-Mart

  • Excavation97%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure90%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
  • Sanitary Fittings within the flats / premises87%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks89%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.88%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.65%

Section AA / A

  • ExcavationNot applicable
  • Basement (if any)Not applicable
  • Podiums (if any)Not applicable
  • PlinthNot applicable
  • Stilt FloorNot applicable
  • Slabs of Super StructureNot applicable
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
  • Sanitary Fittings within the flats / premisesNot applicable
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Section AA / B

  • ExcavationNot applicable
  • Basement (if any)Not applicable
  • Podiums (if any)Not applicable
  • PlinthNot applicable
  • Stilt FloorNot applicable
  • Slabs of Super StructureNot applicable
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
  • Sanitary Fittings within the flats / premisesNot applicable
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Section AA / C

  • ExcavationNot applicable
  • Basement (if any)Not applicable
  • Podiums (if any)Not applicable
  • PlinthNot applicable
  • Stilt FloorNot applicable
  • Slabs of Super StructureNot applicable
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
  • Sanitary Fittings within the flats / premisesNot applicable
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Section AA / D

  • ExcavationNot applicable
  • Basement (if any)Not applicable
  • Podiums (if any)Not applicable
  • PlinthNot applicable
  • Stilt FloorNot applicable
  • Slabs of Super StructureNot applicable
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
  • Sanitary Fittings within the flats / premisesNot applicable
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Section AA / E

  • ExcavationNot applicable
  • Basement (if any)Not applicable
  • Podiums (if any)Not applicable
  • PlinthNot applicable
  • Stilt FloorNot applicable
  • Slabs of Super StructureNot applicable
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
  • Sanitary Fittings within the flats / premisesNot applicable
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Common areas and amenities

  • Internal Roads & FootpathsAs per Approval Passages94%
  • Water SupplyAs per Approval70%
  • Sewerage (Chamber, Lines, Septic Tank , STP)As per Approval50%
  • Storm Water DrainsAs per Approval50%
  • Landscaping & Tree PlantingAs per Approval85%
  • Street LightingAs per Approval50%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterAs per Approval30%
  • Solid Waste Management And DisposalAs per Approval30%
  • Water conservation /Rain water harvestingAs per Approval50%
  • Energy managemcntAs per Approval25%
  • Fire protection and fire safety requirementsAs per Approval40%
  • Electrical meter room, sub-station, receiving stationSererate DP Provided20%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

66 documents held by Deedo, 101 filings listed on MahaRERA's project page

Title

Commencement certificates

Form 1s

Form 2s

Encumbrances

Allotment letters

Form bs

Form 2as

Form 5s

Others

Completion

Registration certificate

Layout plans

Building plans

Document library

  • Copy of the legal title reportSearch Report_fINAL.pdf · uploaded 24 May 2019View
  • Commencement Certificates / NA Order for plotted developmentCommencement cerft_Finalpdf.pdf · uploaded 25 May 2019View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect certificate Final.pdf · uploaded 7 Jun 2019View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate Pande.pdf · uploaded 7 Jun 2019View
  • Details of encumbrancesEncumbrances Final.pdf · uploaded 9 Jun 2019View
  • Declaration in FORM BForm B final.pdf · uploaded 9 Jun 2019View
  • Proforma of Allotment letterproforma_allotment_letter.pdf · uploaded 9 Jun 2019View
  • Proforma of Allotment letterRERA_Agreement_for_Sale_Format - Copy.pdf · uploaded 9 Jun 2019View
  • Building Plan Approval (IOD)Building plan.pdf · uploaded 10 Jun 2019View
  • Copy of Layout Approval (in case of layout)layout final.pdf · uploaded 10 Jun 2019View
  • Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 29 Jun 2019View
  • Building Plan Approval (IOD)Billmart 2-4_compressed.pdf · uploaded 20 Jul 2019View
  • Building Plan Approval (IOD)Billmart 3-4_compressed_compressed.pdf · uploaded 20 Jul 2019View
  • Building Plan Approval (IOD)Billmart 4-4_compressed.pdf · uploaded 20 Jul 2019View
  • Details of encumbrancesEncumbrance.pdf · uploaded 7 Sep 2020View
  • Declaration in FORM BForm B.pdf · uploaded 7 Sep 2020View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)001.pdf · uploaded 10 Sep 2020View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)19-20.pdf · uploaded 22 Jun 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)20-21.pdf · uploaded 22 Jun 2021View
  • Declaration about Commencement CertificateDeclaration 22.pdf · uploaded 12 Jun 2022Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A as on 31-3-21.pdf · uploaded 12 Jun 2022View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate 22_compressed.pdf · uploaded 12 Jun 2022View
  • Disclosure of sold/ booked inventorySold-Booked inventory 22.pdf · uploaded 12 Jun 2022View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate.pdf · uploaded 19 Dec 2022View
  • Disclosure of sold/ booked inventoryDisclosure of Sold inventry.pdf · uploaded 19 Dec 2022View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 - Engineer Certificate.pdf · uploaded 19 Dec 2022View
  • Other – TechnicalPlinth Certificate.pdf · uploaded 19 Dec 2022View
  • Other – LegalMunicipal Corporation Receipt.pdf · uploaded 19 Dec 2022View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 21-22.pdf · uploaded 22 Feb 2023View
  • Commencement Certificates / NA Order for plotted developmentDeem permission inform letter.pdf · uploaded 27 Apr 2023View
  • Commencement Certificates / NA Order for plotted developmentDeem permission notice_compressed.pdf · uploaded 27 Apr 2023View
  • Commencement Certificates / NA Order for plotted developmentApplication to issue commencement certificate.pdf · uploaded 8 May 2023View
  • Disclosure of sold/ booked inventoryRera Sold Unsold 31-03-2023.pdf · uploaded 8 May 2023View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Rera Architect certificate 31-03-2023.pdf · uploaded 8 May 2023View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Rera Form 2 31-03-2023.pdf · uploaded 8 May 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Rera Form 2A 31-03-2022.pdf · uploaded 9 May 2023View
  • Commencement Certificates / NA Order for plotted developmentDeem Permission Court Order_compressed.pdf · uploaded 15 May 2023View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOccupancy Certificate.pdf · uploaded 17 May 2023View
  • Commencement Certificates / NA Order for plotted developmentRevision Commencement Certificate.pdf · uploaded 9 Aug 2023View
  • Building Plan Approval (IOD)Revision sanction Plan.pdf · uploaded 9 Aug 2023View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Rera Architect certificate July 2023.pdf · uploaded 9 Aug 2023View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Rera Engineer Certificate July 2023.pdf · uploaded 9 Aug 2023View
  • Disclosure of sold/ booked inventoryRera sold unsold inventory July 2023.pdf · uploaded 9 Aug 2023View
  • Copy of Layout Approval (in case of layout)BILL MART Tentative Layout APPROVED LETTER.pdf · uploaded 9 Aug 2023View
  • Proforma of Agreement for sale2 Proforma of Allotment letter.pdf · uploaded 9 Aug 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)2A 21-22.pdf · uploaded 28 Aug 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)22-23.pdf · uploaded 28 Aug 2023View
  • Commencement Certificates / NA Order for plotted development11zon_JPG-to-PDF.pdf · uploaded 29 Aug 2023View
  • Building Plan Approval (IOD)11zon_JPG-to-PDF.pdf · uploaded 29 Aug 2023View
  • Disclosure of sold/ booked inventoryBillmart Sold_unsold October .pdf · uploaded 15 Nov 2023View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Architect's Certificate.pdf · uploaded 17 Jan 2024View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 engineer.pdf · uploaded 17 Jan 2024View
  • Disclosure of sold/ booked inventoryRera Sold Unsold Inventory.pdf · uploaded 17 Jan 2024View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 Audit Report 22-23.pdf · uploaded 4 Mar 2024View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 Architect.pdf · uploaded 7 Jun 2024View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 engineer.pdf · uploaded 7 Jun 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Quality Assurance Certificate Form 2A.pdf · uploaded 7 Jun 2024View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 Audit Report 23-24.pdf · uploaded 7 Jun 2024Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate sept 2024.pdf · uploaded 23 Oct 2024View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate sept 2024.pdf · uploaded 23 Oct 2024View
  • Disclosure of sold/ booked inventoryRERA sold unsold Inventory.pdf · uploaded 23 Oct 2024View
  • Disclosure of sold/ booked inventoryRera Sold Unsold Inventory sept 2024.pdf · uploaded 23 Oct 2024View
  • Disclosure of sold/ booked inventoryRera Sold Unsold Inventory.pdf · uploaded 24 Oct 2024View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 2024-25 Q3.pdf · uploaded 21 Jan 2025View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 2024-25 Q3.pdf · uploaded 21 Jan 2025View
  • Disclosure of sold/ booked inventorySold Unsold 2024-25 Q2.pdf · uploaded 21 Jan 2025View
  • Disclosure of sold/ booked inventorySold Unsold 2024-25 Q3.pdf · uploaded 21 Jan 2025View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Architect.pdf · uploaded 24 Apr 2025View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Engineer.pdf · uploaded 24 Apr 2025View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)From 2A Quality Assuarance Certificate-Not Uploade.pdf · uploaded 24 Apr 2025View
  • Form 1Form 1 Architect.pdf · uploaded 27 Jun 2025View
  • Form 2Form 2 Engineer.pdf · uploaded 27 Jun 2025View
  • Disclosure of Sold and Booked InventoryRera Sold Unsold Inventory.pdf · uploaded 27 Jun 2025View
  • Form 1Form 1 2024-25 Q3.pdf · uploaded 27 Jun 2025View
  • Form 2Form 2 2024-25 Q3.pdf · uploaded 27 Jun 2025View
  • Disclosure of Sold and Booked InventorySold Unsold 2024-25 Q3.pdf · uploaded 27 Jun 2025View
  • Withdrawal Update Form 1Architect Certificate June-25.pdf · uploaded 24 Oct 2025Source
  • Withdrawal Update Form 2Form 2 Engineer June-25.pdf · uploaded 24 Oct 2025Source
  • Withdrawal Update Form 1Form 1 Architect.pdf · uploaded 24 Oct 2025View
  • Withdrawal Update Form 2Form 2 Engineer.pdf · uploaded 24 Oct 2025View
  • Withdrawal Update Form 1Form 1 Architect.pdf · uploaded 29 Jan 2026View
  • Withdrawal Update Form 2Form 2 Engineer.pdf · uploaded 29 Jan 2026View
  • Withdrawal Update Form 1FORM 1 2025-26 Q4.pdf · uploaded 2 May 2026Source
  • Withdrawal Update Form 2Form 2 2025-26 Q4.pdf · uploaded 2 May 2026View
  • Withdrawal Update Form 1Form 1 Architect.pdf · uploaded 25 Jul 2026View
  • Withdrawal Update Form 2Form 2 Engineer.pdf · uploaded 25 Jul 2026View

Promoter documents

  • Legal Title reportSearch Report_fINAL.pdf · uploaded 24 May 2019View
  • Declaration Form BForm B final.pdf · uploaded 9 Jun 2019View
  • Declaration Form BForm B.pdf · uploaded 7 Sep 2020View

Technical documents

  • Building Plan ApprovalRevision sanction Plan.pdfView
  • Layout ApprovalBILL MART Tentative Layout APPROVED LETTER.pdfView
  • Building Plan Approval11zon_JPG-to-PDF.pdfView
  • Building Plan ApprovalBillmart 2-4_compressed.pdfView
  • Building Plan ApprovalBillmart 3-4_compressed_compressed.pdfView
  • Building Plan ApprovalBillmart 4-4_compressed.pdfView
  • Building Plan ApprovalBuilding plan.pdfView
  • Layout Approvallayout final.pdfView
  • Commencement CertificateRevision Commencement Certificate.pdfView
  • Building Plan ApprovalRevision sanction Plan.pdfView

Other legal documents

  • Other – LegalMunicipal Corporation Receipt.pdfView

Proforma allotment letter

  • Proforma allotment letterRERA_Agreement_for_Sale_Format - Copy.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Akkalkot, Akola taluka

Survey, CTS, gat or plot numbers

2/1Survey 2/1

As published on MahaRERA's project page

Survey 2/1

Boundaries

North
Plots Of Bhagirath Wadi
South
Mini Bypass Akola- Balapur Road
East
Remaining Field Of Shantilal Ramgopal Bhati
West
Layout Of Kulsum Park

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSantosh Thole And Associates—
Chartered accountantSNGP & Company—
EngineerMakrand S Pande—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology