Ayodhya City-Residential Layout Plan in Survey No-107/2

Active

Umari (Meghe), Wardha 442001 |Promoter: Mahesh Shankarrao Gulhane

15 Dec 2022Registered with MahaRERA
31 Mar 2024Promised completion
31 Mar 2027Revised completionPushed back 3 years
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Plotted
Status on MahaRERA
Active
Land area for this project
10,051 sq m (1,08,185 sq ft)
Permissible built-up area
0 sq m (0 sq ft)
Sanctioned built-up area
0 sq m (0 sq ft)
Recreational open space
1,438 sq m (15,479 sq ft)
Planning authority
Sub Divisional Office Wardha
Address
Survey No-107/2PIN 442001
Designated bank account
Au Small Finance Bank Limited
Developed in phases
No
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 20.74696, 78.56474
Ayodhya City-Residential Layout Plan in Survey No-107/2 is at latitude 20.74696, longitude 78.56474.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 3 years

Registered
15 Dec 2022
Promised
31 Mar 2024
Revised
31 Mar 2027

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5040004819015 Dec 202231 Mar 202431 Mar 2027Mahesh Shankarrao GulhaneProject page

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Building

  • ExcavationNot applicable
  • Basement (if any)Not applicable
  • Podiums (if any)Not applicable
  • PlinthNot applicable
  • Stilt FloorNot applicable
  • Slabs of Super StructureNot applicable
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
  • Sanitary Fittings within the flats / premisesNot applicable
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Common areas and amenities

  • Internal Roads & FootpathsW.B.M0%
  • Water SupplyBorewell0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Not applicable
  • Storm Water DrainsKacchi Nali0%
  • Landscaping & Tree PlantingTree Plantation0%
  • Street LightingAsper Sanction0%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingRain Water Harvesting0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationD.P0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

22 documents held by Deedo, 103 filings listed on MahaRERA's project page

Title

Encumbrances

Commencement certificates

Form bs

Others

Registration certificate

Form 1s

Extension certificate

Form 2s

Layout plan

Document library

  • Copy of the legal title report4_Search-107.pdf · uploaded 19 Nov 2022View
  • a Details of encumbrances concerned to Finance5A_Financial Encumbrance.pdf · uploaded 19 Nov 2022View
  • a Details of encumbrances concerned to Finance5B_Legal Encumbrance.pdf · uploaded 19 Nov 2022View
  • b Details of encumbrances concerned to Legal5A_Financial Encumbrance.pdf · uploaded 19 Nov 2022View
  • b Details of encumbrances concerned to Legal5B_Legal Encumbrance.pdf · uploaded 19 Nov 2022View
  • Copy of Layout Approval (in case of layout)10_MAP.pdf · uploaded 19 Nov 2022View
  • Building Plan Approval / NA Order for plotted development7_NA.pdf · uploaded 19 Nov 2022View
  • Commencement Certificates / NA Order for plotted development7_NA.pdf · uploaded 19 Nov 2022View
  • Declaration about Commencement Certificate12_Circular 32.pdf · uploaded 19 Nov 2022View
  • Declaration in FORM B6_Form B.pdf · uploaded 19 Nov 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)1_Form 1.pdf · uploaded 19 Nov 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)2_Form2.pdf · uploaded 19 Nov 2022Source
  • Disclosure of sold/ booked inventory11_Annexure 29.pdf · uploaded 19 Nov 2022Source
  • Deviation Report with respect to model copy of Agreement13_Deviation for Model Agreement.pdf · uploaded 19 Nov 2022View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the same14_Declaration for Bank.pdf · uploaded 22 Nov 2022Source
  • Deviation Report with respect to Allotment letter15_Deviation for Allotment Letter.pdf · uploaded 22 Nov 2022Source
  • Proforma of Allotment letter8_Allotment Letter.pdf · uploaded 22 Nov 2022Source
  • CERSAI detailsCERSAI_Search_Report_200252849225_For_Asset_Based_Search_22_11_2022_13_35_13_746.pdf · uploaded 22 Nov 2022Source
  • Proforma of Agreement for sale9_ATS Final.pdf · uploaded 22 Nov 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)1_Form 1.pdf · uploaded 20 Oct 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)2_Form2.pdf · uploaded 20 Oct 2023Source
  • Disclosure of sold/ booked inventory11_Annexure 29.pdf · uploaded 20 Oct 2023Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM-1 31-03-2023.pdf · uploaded 30 Mar 2024Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM-1 30-06-23.pdf · uploaded 30 Mar 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM-1 20-09-23.pdf · uploaded 30 Mar 2024Source
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM-1 31-12-23.pdf · uploaded 30 Mar 2024Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM-1 31-12-23.pdf · uploaded 30 Mar 2024Source
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)form-2 31-03-2023.pdf · uploaded 30 Mar 2024Source
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)form -2 30-06-23.pdf · uploaded 30 Mar 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)form -2 30-06-23.pdf · uploaded 30 Mar 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)form-2 30-09-2023.pdf · uploaded 30 Mar 2024Source
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)form-2 31-12-23.pdf · uploaded 30 Mar 2024Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM-2A 31-03-2023.pdf · uploaded 30 Mar 2024Source
  • Disclosure of sold/ booked inventoryDISCOLSURE OF SOLD 31-03-23.pdf · uploaded 30 Mar 2024Source
  • Disclosure of sold/ booked inventoryDISCOLSURE OF SOLD 30-06-2023.pdf · uploaded 30 Mar 2024View
  • Disclosure of sold/ booked inventoryDIISCOLSURE OF SOLD 30-09-2023.pdf · uploaded 30 Mar 2024Source
  • Disclosure of sold/ booked inventoryDISCOLSURE OF SOLD 31-12-2023.pdf · uploaded 30 Mar 2024Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM-5 22-03-24.pdf · uploaded 30 Mar 2024Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1Ayodhya.pdf · uploaded 19 Jun 2024Source
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form -2Ayodhya.pdf · uploaded 19 Jun 2024Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form -2A Ayodhya.pdf · uploaded 19 Jun 2024Source
  • Disclosure of sold/ booked inventorySold booked Ayodhya.pdf · uploaded 19 Jun 2024Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form-5 Ayodhya.pdf · uploaded 19 Jun 2024Source
  • Declaration in FORM BForm_B.pdf · uploaded 26 Jun 2024View
  • Form 2form -2 30-06-23.pdf · uploaded 16 May 2025View
  • Form 1FORM-1 30-06-23.pdf · uploaded 16 May 2025View
  • Disclosure of Sold and Booked InventoryDISCOLSURE OF SOLD 30-06-2023.pdf · uploaded 16 May 2025View
  • Form 1Form 3 30-06-2023 signed.pdf · uploaded 16 May 2025View
  • Form 2form -2 30-06-23.pdf · uploaded 16 May 2025View
  • Disclosure of Sold and Booked InventoryDISCOLSURE OF SOLD 30-06-2023.pdf · uploaded 16 May 2025View
  • Form 1Form 3 30-06-2023 signed.pdf · uploaded 16 May 2025View
  • Form 2form -2 30-06-23.pdf · uploaded 16 May 2025View
  • Disclosure of Sold and Booked InventoryDISCOLSURE OF SOLD 30-06-2023.pdf · uploaded 16 May 2025View
  • Form 1FORM-1 30-06-23.pdf · uploaded 16 May 2025View
  • Form 2DISCOLSURE OF SOLD 30-06-2023.pdf · uploaded 16 May 2025View
  • Disclosure of Sold and Booked Inventoryform -2 30-06-23.pdf · uploaded 16 May 2025View
  • Withdrawal Update Form 1Form 1 31-03-2024.pdf · uploaded 3 Jul 2025Source
  • Withdrawal Update Form 2Form 2 31-03-2024.pdf · uploaded 3 Jul 2025View
  • Form 1Form-1 30-06-2024.pdf · uploaded 12 Jul 2025Source
  • Form 2Form-2 30-06-2024.pdf · uploaded 12 Jul 2025Source
  • Disclosure of Sold and Booked InventoryAnnexure-29 30-06-2024.pdf · uploaded 12 Jul 2025Source
  • Form 1Form-1 30-09-2024.pdf · uploaded 12 Jul 2025Source
  • Form 2Form-2 30-09-2024.pdf · uploaded 12 Jul 2025Source
  • Disclosure of Sold and Booked InventoryAnnexure-29 30-09-2024.pdf · uploaded 12 Jul 2025Source
  • Form 1Form-1 31-12-2024.pdf · uploaded 12 Jul 2025Source
  • Form 2Form-2 31-12-2024.pdf · uploaded 12 Jul 2025Source
  • Disclosure of Sold and Booked InventoryAnnexure-29 31-12-2024.pdf · uploaded 12 Jul 2025Source
  • Form 1Form-1 31-03-2025.pdf · uploaded 12 Jul 2025Source
  • Form 2Form-2 31-03-2025.pdf · uploaded 12 Jul 2025Source
  • Disclosure of Sold and Booked InventoryAnnexure-29 31-03-2025.pdf · uploaded 12 Jul 2025Source
  • Form 5 (FY 2022-2023)FORM-5 31-03-2023 Sign.pdf · uploaded 12 Jul 2025Source
  • Form 5 (FY 2023-2024)Form-5 Ayodhya City 31-03-2024 Sign.pdf · uploaded 12 Jul 2025Source
  • Form 5 (FY 2024-2025)Form-5 Ayodhya City 31-03-2025 Sign.pdf · uploaded 12 Jul 2025Source
  • Withdrawal Update Form 1Form-1 31-03-2025.pdf · uploaded 25 Jul 2025Source
  • Withdrawal Update Form 2Form-2 31-03-2025.pdf · uploaded 25 Jul 2025Source
  • Withdrawal Update Form 1Form-1 31-03-2025.pdf · uploaded 31 Jul 2025Source
  • Withdrawal Update Form 2Form-2 31-03-2025.pdf · uploaded 31 Jul 2025Source
  • Form 2A (FY 2023-2024)M. G Form2A 31-03-24.pdf · uploaded 6 Aug 2025Source
  • Form 2A (FY 2022-2023)M. G Form 2A 31-03-23.pdf · uploaded 6 Aug 2025Source
  • Form 2A (FY 2024-2025)M. G Form-2A 31-03-25.pdf · uploaded 6 Aug 2025Source
  • Withdrawal Update Form 1Form-1 30-06-2025.pdf · uploaded 6 Aug 2025Source
  • Withdrawal Update Form 2Form-2 30-06-2025.pdf · uploaded 6 Aug 2025Source
  • Withdrawal Update Form 1Form-1 30-09-2025.pdf · uploaded 6 Nov 2025View
  • Withdrawal Update Form 2Form-2 30-09-2025.pdf · uploaded 6 Nov 2025Source
  • Form 1FORM-1 31-03-2023.pdf · uploaded 15 Nov 2025Source
  • Form 2form-2 31-03-2023.pdf · uploaded 15 Nov 2025Source
  • Disclosure of Sold and Booked InventoryDISCOLSURE OF SOLD 31-03-23.pdf · uploaded 15 Nov 2025Source
  • Form 1Self Declaration 31-12-2022.pdf · uploaded 15 Nov 2025Source
  • Form 2Self Declaration 31-12-2022.pdf · uploaded 15 Nov 2025Source
  • Disclosure of Sold and Booked InventorySelf Declaration 31-12-2022.pdf · uploaded 15 Nov 2025Source
  • Withdrawal Update Form 1Form-1 31-12-2025.pdf · uploaded 2 Feb 2026View
  • Withdrawal Update Form 2Form-2 31-12-2025.pdf · uploaded 2 Feb 2026Source
  • Withdrawal Update Form 1Form-1.pdf · uploaded 18 Apr 2026View
  • Withdrawal Update Form 2Form-2.pdf · uploaded 18 Apr 2026Source
  • Form 2A (FY 2025-2026)Form-2A 31-03-26 Sing.pdf · uploaded 19 Jun 2026Source
  • Withdrawal Update Form 1Annexure A form 1.pdf · uploaded 15 Jul 2026View
  • Withdrawal Update Form 2Annexure -B form-2.pdf · uploaded 15 Jul 2026Source

Promoter documents

  • Legal Title report4_Search-107.pdf · uploaded 19 Nov 2022View
  • Declaration Form B6_Form B.pdf · uploaded 19 Nov 2022View
  • Declaration Form BForm_B.pdf · uploaded 26 Jun 2024View

Technical documents

  • Layout Approval10_MAP.pdfView
  • NA Order for Plotted Development7_NA.pdfView

Proforma allotment letter

  • Proforma allotment letter8_Allotment Letter.pdfSource

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Umari (Meghe), Wardha taluka

Survey, CTS, gat or plot numbers

Survey No107/2

As published on MahaRERA's project page

Survey No-107/2

Boundaries

North
Survey No 106
South
Stream
East
Survey No 107 1
West
Survey No 108

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectNitin M Zade—
Chartered accountantAPJ & Associates—
Chartered accountantAPJ & Associates—
Chartered accountantCA Abhinav Welekar—
Chartered accountantPravin Dhiran & Co—
EngineerNitin M zade—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology