Skip to content
Deedo home
Menu

Shree Mahalaxmi Nagari

Completed

Sawangi (Meghe) (Ct), Wardha 442001 |Promoter: Gorakhnath P Choudhari & 4 Other

22 Nov 2021Registered with MahaRERA
31 Dec 2024Promised completion
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Plotted
Status on MahaRERA
Completed
Land area for this project
9,255 sq m (99,617 sq ft)
Permissible built-up area
0 sq m (0 sq ft)
Sanctioned built-up area
0 sq m (0 sq ft)
Recreational open space
1,560 sq m (16,793 sq ft)
Address
273/1 and 273/2, Sawangi MeghePIN 442001
Designated bank account
Canara Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 20.71307, 78.57193
Shree Mahalaxmi Nagari is at latitude 20.71307, longitude 78.57193.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2024

The latest completion date on record passed 1 year and 10 months ago.

Registered
22 Nov 2021
Promised
31 Dec 2024

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5040003190822 Nov 202131 Dec 2024—Gorakhnath P Choudhari & 4 OtherProject page

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Building

  • ExcavationNot applicable
  • Basement (if any)Not applicable
  • Podiums (if any)Not applicable
  • PlinthNot applicable
  • Stilt FloorNot applicable
  • Slabs of Super StructureNot applicable
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
  • Sanitary Fittings within the flats / premisesNot applicable
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Common areas and amenities

  • Internal Roads & FootpathsCement Road100%
  • Water SupplyBorewell100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Nali100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingTree Plantation100%
  • Street LightingAs Per Sanction100%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingNot applicable
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationAs Per Sanction100%
  • Aggregate area of recreational Open SpaceCompound Wall Wall100%
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

24 documents held by Deedo, 30 filings listed on MahaRERA's project page

Commencement certificates

Form b

Allotment letters

Title

Form 1s

Form 2s

Others

Registration certificate

Form 2as

Form 5s

Completion

Form 4

Layout plan

Document library

  • Copy of the legal title report4 सर्च रिपोर्ट लेआऊट.pdf · uploaded 9 Nov 2021View
  • Details of encumbrances5 Encumbrance.pdf · uploaded 9 Nov 2021Source
  • Declaration about Commencement Certificate12 Circular 32.pdf · uploaded 9 Nov 2021View
  • Declaration in FORM B6 Form B.pdf · uploaded 9 Nov 2021View
  • Proforma of Allotment letter9 ATS.pdf · uploaded 9 Nov 2021View
  • Proforma of Allotment letter8 Allotment Letter.pdf · uploaded 9 Nov 2021View
  • Building Plan Approval / NA Order for plotted development7 NA.pdf · uploaded 11 Nov 2021View
  • Copy of Layout Approval (in case of layout)10 MAP_opt.pdf · uploaded 11 Nov 2021View
  • Commencement Certificates / NA Order for plotted development7 NA.pdf · uploaded 11 Nov 2021View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)1 Form 1.pdf · uploaded 11 Nov 2021View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)2 Form 2.pdf · uploaded 11 Nov 2021View
  • Disclosure of sold/ booked inventory11 Anexture 29.pdf · uploaded 11 Nov 2021View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 31-03-2022.pdf · uploaded 17 Feb 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 26-04-2022.pdf · uploaded 17 Feb 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 31-03-2022.pdf · uploaded 17 Feb 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 26-04-2022.pdf · uploaded 17 Feb 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A 31-03-2022.pdf · uploaded 17 Feb 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A 26-04-2022.pdf · uploaded 17 Feb 2023View
  • Disclosure of sold/ booked inventoryAnnexure 29 31-03-2022.pdf · uploaded 17 Feb 2023View
  • Disclosure of sold/ booked inventoryAnnexure 29 26-04-2022.pdf · uploaded 17 Feb 2023View
  • Architect’s Certificate on Completion of Project (Form 4)Form 4 Layout.pdf · uploaded 17 Feb 2023View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOC.pdf · uploaded 17 Feb 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Gorakhnath_Choudhari_31-03-22.pdf · uploaded 17 Feb 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Gorakhnath_Choudhari_26-04-22.pdf · uploaded 17 Feb 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Gorakhnath_Choudhari_26-04-22.pdf · uploaded 16 Sep 2023View

Promoter documents

  • Legal Title report4 सर्च रिपोर्ट लेआऊट.pdf · uploaded 9 Nov 2021View
  • Declaration Form B6 Form B.pdf · uploaded 9 Nov 2021View

Technical documents

  • NA Order for Plotted Development7 NA.pdfView
  • Layout Approval10 MAP_opt.pdfView

Proforma allotment letter

  • Proforma allotment letter9 ATS.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Sawangi (Meghe) (CT), Wardha taluka

Survey, CTS, gat or plot numbers

273/1273/2

As published on MahaRERA's project page

273/1 and 273/2

Boundaries

North
Survey No 271
South
Survey No442
East
Survey No 277
West
Survey No274 and 275

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAkhilesh Kumar Deshmukh—
Chartered accountantCA Abhinav Welekar—
EngineerAkhileshkumar Deshmukh—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology