Skip to content
Deedo home
Menu

Shivneri Fort

Completed

Sawangi (Meghe) (Ct), Wardha 442001 |Promoter: Vmb Homes

Residential / Group HousingRERAP50400000911
25 Jul 2017Registered with MahaRERA
31 Dec 2017Promised completion
1Building
1,827Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
Residential1,827 units in all
Land area for this project
280 sq m (3,014 sq ft)
Permissible built-up area
336 sq m (3,617 sq ft)
Sanctioned built-up area
329 sq m (3,537 sq ft)
Address
PLOT NO.18, Survey no. 149/2PIN 442001
Designated bank account
Yes Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 20.71888, 78.56975
Shivneri Fort is at latitude 20.71888, longitude 78.56975.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2017

The latest completion date on record passed 8 years and 10 months ago.

Registered
25 Jul 2017
Promised
31 Dec 2017

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5040000091125 Jul 201731 Dec 2017—Vmb HomesProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Shivneri Fort71827

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

1,827 units registered

Residential · 1,827 units
TypeCarpet areaUnits
Residential23.48 sq m · 253 sq ft102
Residential23.48 sq m · 253 sq ft302
Residential23.48 sq m · 253 sq ft202
Residential27.75 sq m · 299 sq ft103
Residential27.75 sq m · 299 sq ft203
Residential27.75 sq m · 299 sq ft303
Residential39.98 sq m · 430 sq ft201
Residential39.98 sq m · 430 sq ft301
Residential39.98 sq m · 430 sq ft101
Residential273.65 sq m · 2,946 sq ft9

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Shivneri Fort

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyBorewell with Sump100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)sewerage system has done100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingrain water management done100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsfire protection equipment installed100%
  • Electrical meter room, sub-station, receiving stationelectric meter cabin fitted in building100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

18 documents held by Deedo, 23 filings listed on MahaRERA's project page

Title

Encumbrance

Commencement certificate

Form b

Form 1

Form 2

Registration certificate

Form 2a

Form 5

Form 4

Others

Layout plan

Building plan

Allotment letter

Document library

  • Building Plan Approval (IOD)Sanctioned building Map.pdf · uploaded 11 Jul 2017View
  • Details of encumbrancesSHIVNERI SEARCH REPORT.pdf · uploaded 11 Jul 2017View
  • Copy of the legal title reportTITLE DOCUMENTS.pdf · uploaded 11 Jul 2017View
  • Proforma of Allotment letterAGREEMENT TO SALE AND ALLOTMENT.pdf · uploaded 11 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate Form 1.pdf · uploaded 15 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate Form 2.pdf · uploaded 15 Jul 2017View
  • Commencement Certificates / NA Order for plotted developmentCommencement.pdf · uploaded 15 Jul 2017View
  • Declaration in FORM BDeclaration in Form B.pdf · uploaded 15 Jul 2017View
  • Copy of Layout Approval (in case of layout)Layout Map.pdf · uploaded 15 Jul 2017View
  • OtherShivneri Power of Attorney.pdf · uploaded 15 Jul 2017View
  • OtherShivneri Professionals Certificates.pdf · uploaded 15 Jul 2017View
  • Certificates of CA (Form 5)CA Certificate Form 5.pdf · uploaded 11 Jul 2019View
  • Certificates of Architect (Form 4)Architect Certificate Form 4.pdf · uploaded 11 Jul 2019View
  • Form 2AArchitect Certificate Form 2A.pdf · uploaded 11 Jul 2019View
  • OtherOC of SHIVNERI FORT.pdf · uploaded 11 Jul 2019View

Promoter documents

  • Legal Title reportTITLE DOCUMENTS.pdf · uploaded 11 Jul 2017View
  • Declaration Form BDeclaration in Form B.pdf · uploaded 15 Jul 2017View

Technical documents

  • Building Plan ApprovalSanctioned building Map.pdfView
  • Layout ApprovalLayout Map.pdfView

Other legal documents

  • OtherShivneri Power of Attorney.pdfView
  • OtherShivneri Professionals Certificates.pdfView
  • OtherOC of SHIVNERI FORT.pdfView

Proforma allotment letter

  • Proforma allotment letterAGREEMENT TO SALE AND ALLOTMENT.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Sawangi (Meghe) (CT), Wardha taluka

Survey, CTS, gat or plot numbers

149/218PLOT NO.18PLOT NO.18Survey no. 149/2

As published on MahaRERA's project page

PLOT NO.18, Survey no. 149/2

Boundaries

North
Plot No 19
South
Plot No 17
East
Plot No 11
West
Layout Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectMilind Shivaji Kedar—
EngineerDinesh Lakade—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology