Mathura Nagari- Residential Layout Plan In Survey No 27

Completed

Pavnar, Wardha 442111 |Promoter: Gurukrupa Land Developers

17 Jan 2023Registered with MahaRERA
31 Mar 2024Promised completion
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Plotted
Status on MahaRERA
Completed
Land area for this project
7,047 sq m (75,857 sq ft)
Permissible built-up area
0 sq m (0 sq ft)
Sanctioned built-up area
0 sq m (0 sq ft)
Recreational open space
1,157 sq m (12,456 sq ft)
Address
Survey No 27PIN 442111
Designated bank account
Axis Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 20.77766, 78.66592
Mathura Nagari- Residential Layout Plan In Survey No 27 is at latitude 20.77766, longitude 78.66592.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Mar 2024

The latest completion date on record passed 2 years and 7 months ago.

Registered
17 Jan 2023
Promised
31 Mar 2024

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5040004875917 Jan 202331 Mar 2024—Gurukrupa Land DevelopersProject page

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Building

  • ExcavationNot applicable
  • Basement (if any)Not applicable
  • Podiums (if any)Not applicable
  • PlinthNot applicable
  • Stilt FloorNot applicable
  • Slabs of Super StructureNot applicable
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
  • Sanitary Fittings within the flats / premisesNot applicable
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Common areas and amenities

  • Internal Roads & FootpathsW B M100%
  • Water SupplyBorewell100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Not applicable
  • Storm Water DrainsKacchi Nali100%
  • Landscaping & Tree PlantingTree Plantation100%
  • Street LightingAs per Sanction100%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingRain Water Harvesting100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationD P100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable
  • OthersPreecat Wall100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

12 documents held by Deedo, 33 filings listed on MahaRERA's project page

Others

Encumbrance

Allotment letters

Form b

Title

Registration certificate

Form 5

Completion

Form 4

Document library

  • a Details of encumbrances concerned to Finance5B_Legal Encumbrance.pdf · uploaded 23 Dec 2022Source
  • b Details of encumbrances concerned to Legal5B_Legal Encumbrance.pdf · uploaded 23 Dec 2022Source
  • Copy of Layout Approval (in case of layout)10_MAP.pdf · uploaded 23 Dec 2022Source
  • Building Plan Approval / NA Order for plotted development7_NA Letter.pdf · uploaded 23 Dec 2022Source
  • Commencement Certificates / NA Order for plotted development7_NA Letter.pdf · uploaded 23 Dec 2022Source
  • Declaration in FORM B6_Form B.pdf · uploaded 23 Dec 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)1_Form 1.pdf · uploaded 23 Dec 2022Source
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)2_Form 2.pdf · uploaded 23 Dec 2022Source
  • Proforma of Allotment letter8_Allotment Letter.pdf · uploaded 23 Dec 2022View
  • Disclosure of sold/ booked inventory11_Annexure 29.pdf · uploaded 23 Dec 2022Source
  • Proforma of Agreement for sale9_ATS.pdf · uploaded 23 Dec 2022View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the same14_Declaration for Bank Ac.pdf · uploaded 23 Dec 2022View
  • Deviation Report with respect to model copy of Agreement13_Deviation for Model Agreement.pdf · uploaded 23 Dec 2022View
  • Deviation Report with respect to Allotment letter15_Dexiation for Allotment Letter.pdf · uploaded 23 Dec 2022View
  • CERSAI details16_CERSAI_Search_Report_200255720273_For_Asset_Based_Search_23_12_2022_19_18_25_023.pdf · uploaded 26 Dec 2022Source
  • Declaration about Commencement Certificate12_Circular 32.pdf · uploaded 27 Dec 2022Source
  • Copy of the legal title reportSr 27 New Search.pdf · uploaded 5 Jan 2023View
  • Disclosure of Interest in Other Real Estate Organizations18_Pramod Shrirao Disclosure.pdf · uploaded 6 Jan 2023Source
  • Disclosure of Interest in Other Real Estate Organizations19_Anil Gulhane Disclosure.pdf · uploaded 6 Jan 2023Source
  • a Details of encumbrances concerned to FinanceNew Financial Encumbrance.pdf · uploaded 9 Jan 2023Source
  • b Details of encumbrances concerned to LegalNew Financial Encumbrance.pdf · uploaded 9 Jan 2023Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 MN.pdf · uploaded 23 Aug 2023Source
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 MN.pdf · uploaded 23 Aug 2023Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A MN.pdf · uploaded 23 Aug 2023Source
  • Disclosure of sold/ booked inventoryAnnexure 29 MN.pdf · uploaded 23 Aug 2023Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 Mathura Nagari.pdf · uploaded 23 Aug 2023View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentMathura Nagari-Completion.pdf · uploaded 23 Aug 2023View
  • Architect’s Certificate on Completion of Project (Form 4)Form-4 Mathura Nagari.pdf · uploaded 23 Aug 2023View

Promoter documents

  • Declaration Form B6_Form B.pdf · uploaded 23 Dec 2022View
  • Legal Title reportSr 27 New Search.pdf · uploaded 5 Jan 2023View

Technical documents

  • Layout Approval10_MAP.pdfSource
  • NA Order for Plotted Development7_NA Letter.pdfSource

Proforma allotment letter

  • Proforma allotment letter8_Allotment Letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Pavnar, Wardha taluka

Survey, CTS, gat or plot numbers

27Survey No 27

As published on MahaRERA's project page

Survey No 27

Boundaries

North
Survey No 28
South
Survey No 26
East
Survey No 29
West
Survey No 25

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectNitin M Zade—
Chartered accountantCA Abhinav Welekar—
EngineerNitin M Zade—

Source: MahaRERA project page. Contact details are not shown.