Sahas Iconic

Completed

Nalwadi, Wardha 442001 |Promoter: SAHAS LAND AND INFRA DEVELOPERS PRIVATEl LIMITED

Residential / Group HousingRERAP50400001086
26 Jul 2017Registered with MahaRERA
31 Dec 2019Promised completion
1Building
12Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
3 BHK12 units in all
Land area for this project
683 sq m (7,350 sq ft)
Permissible built-up area
819 sq m (8,818 sq ft)
Sanctioned built-up area
819 sq m (8,818 sq ft)
Address
Plot No 30 and 32 Survey No 39 Mouza No 73 Mouza Nalwadi, NALWADI, NALWADIPIN 442001
Designated bank account
State Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 20.75297, 78.62428
Sahas Iconic is at latitude 20.75297, longitude 78.62428.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2019

The latest completion date on record passed 6 years and 10 months ago.

Registered
26 Jul 2017
Promised
31 Dec 2019

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5040000108626 Jul 201731 Dec 2019—SAHAS LAND AND INFRA DEVELOPERS PRIVATEl LIMITEDProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Sahas Iconic612

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

12 units registered

3 BHK · 12 units
TypeCarpet areaUnits
3 BHK51.05 sq m · 549 sq ft4
3 BHK51.3 sq m · 552 sq ft4
3 BHK56.86 sq m · 612 sq ft4

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Sahas Iconic

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyBorewell & Water connection Maharashtra Pradhikara100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Septic Tank100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingRain Water Harvesting100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationElectric Meter Room100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

18 documents held by Deedo, 27 filings listed on MahaRERA's project page

Title

Encumbrance

Form b

Form 1

Form 2

Allotment letters

Registration certificate

Form 5s

Completion

Form 4

Form 2a

Others

Layout plan

Document library

  • Copy of the legal title reportLegal Title Report.pdf · uploaded 21 Jul 2017View
  • Details of encumbrancesencumbrance.pdf · uploaded 21 Jul 2017View
  • Proforma of Allotment letterALLOTMENT LETTER.pdf · uploaded 21 Jul 2017View
  • Declaration in FORM BForm B.pdf · uploaded 21 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECTS CERTIFICATE.pdf · uploaded 21 Jul 2017View
  • Commencement Certificates / NA Order for plotted developmentBuilding Permit.pdf · uploaded 21 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate.pdf · uploaded 21 Jul 2017View
  • Building Plan Approval (IOD)Building Permit.pdf · uploaded 21 Jul 2017View
  • OtherAmalgamation.pdf · uploaded 21 Jul 2017View
  • Copy of Layout Approval (in case of layout)Building Permit.pdf · uploaded 21 Jul 2017View
  • Proforma of Allotment letterAgreement to sale.pdf · uploaded 28 Oct 2017View
  • Proforma of Allotment letterALLOTMENT LETTER_Updated.pdf · uploaded 28 Oct 2017View
  • Certificates of CA (Form 5)Form-5 Sahas Iconic 17-18 Signed.pdf · uploaded 29 Sep 2018View
  • Certificates of CA (Form 5)Form-5 Sahas Iconic 18-19 PD.pdf · uploaded 30 Sep 2019View
  • Architect’s Certificate on Completion of Project (Form 4)Form 4.pdf · uploaded 28 Jan 2020View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCompletion_Cert_Gram_Panchayat.pdf · uploaded 28 Jan 2020View
  • Architect’s Certificate on Completion of Project (Form 4)Form 4.pdf · uploaded 28 Jan 2020View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf · uploaded 25 May 2022View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A.pdf · uploaded 25 May 2022View
  • Status of Formation of Legal Entity (Society/Co Op etc.)Sahas Iconic.pdf · uploaded 26 May 2022View
  • Status of ConveyanceSahas Iconic.pdf · uploaded 26 May 2022View

Promoter documents

  • Legal Title reportLegal Title Report.pdf · uploaded 21 Jul 2017View
  • Declaration Form BForm B.pdf · uploaded 21 Jul 2017View

Technical documents

  • Building Plan ApprovalBuilding Permit.pdfView
  • Layout ApprovalBuilding Permit.pdfView

Other legal documents

  • OtherAmalgamation.pdfView

Proforma allotment letter

  • Proforma allotment letterALLOTMENT LETTER_Updated.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nalwadi, Wardha taluka

Survey, CTS, gat or plot numbers

303232 Survey No 39 Mouza No 73 Mouza NalwadiPlot No 30

As published on MahaRERA's project page

Plot No 30 and 32 Survey No 39 Mouza No 73 Mouza Nalwadi

Boundaries

North
25 ft Layout Road
South
25 ft Layout Road
East
Plot No 31
West
Plot No 33 and 29

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSwapnil Khedikar—
EngineerDinesh Lakade—
OtherQuality Constructions—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology