Skip to content
Deedo home
Menu

Saumya Nagari

Completed

Bhiwapur (534083), Wardha 442001 |Promoter: Ashish Sharadkumar Tiwari

10 Sep 2022Registered with MahaRERA
31 Dec 2023Promised completion
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Plotted
Status on MahaRERA
Completed
Land area for this project
8,886 sq m (95,648 sq ft)
Permissible built-up area
8,886 sq m (95,648 sq ft)
Sanctioned built-up area
0 sq m (0 sq ft)
Recreational open space
1,557 sq m (16,758 sq ft)
Address
Survey No. 19/2, Survey No 19/2 Mauja Bhiwapur, Survey No 19/2 Mauja BhiwapurPIN 442001
Designated bank account
Au Small Finance Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Saumya Nagari is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2023

The latest completion date on record passed 2 years and 10 months ago.

Registered
10 Sep 2022
Promised
31 Dec 2023

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5040004680810 Sep 202231 Dec 2023—Ashish Sharadkumar TiwariProject page

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Building

  • ExcavationNot applicable
  • Basement (if any)Not applicable
  • Podiums (if any)Not applicable
  • PlinthNot applicable
  • Stilt FloorNot applicable
  • Slabs of Super StructureNot applicable
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
  • Sanitary Fittings within the flats / premisesNot applicable
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Common areas and amenities

  • Internal Roads & FootpathsWBM ROAD WITH SUB BASE OF MURUM100%
  • Water SupplyBOREWELL100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Not applicable
  • Storm Water DrainsEXCAVATED AND LINED DRAINAGE TO BE PROVIDED100%
  • Landscaping & Tree PlantingTREE PLANTATION ALONG ROAD SIDE AND IN OPEN SPACE100%
  • Street LightingCONCRETE POLES OVERHEAD CABLES AND STREET LIGHTS100%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingNot applicable
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationTRANSFORMER TO BE PROVIDED100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable
  • ENTRANCE GATEENTRANCE GATE IN PANELLING TO BE PROVIDED100%
  • CORNER POOL AND BENCHESCORNER POOL IN BRICK MASONARY100%
  • COMPOUND WALL TO OPEN SPACE AMENITY SPACEPRECAST PILLARS AND WIRE MESH COMPOUND WALL100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

6 documents held by Deedo, 26 filings listed on MahaRERA's project page

Others

Registration certificate

Allotment letter

Layout plan

Commencement certificate

Document library

  • Copy of the legal title reportFORMAT A_SEARCH_PART 1.pdf · uploaded 27 Aug 2022Source
  • Copy of the legal title reportFORMAT A_SEARCH_PART 2.pdf · uploaded 27 Aug 2022Source
  • a Details of encumbrances concerned to FinanceDECLARATION_ENCUMBRANCE.pdf · uploaded 27 Aug 2022Source
  • b Details of encumbrances concerned to LegalDECLARATION_ENCUMBRANCE.pdf · uploaded 27 Aug 2022Source
  • Copy of Layout Approval (in case of layout)LAYOUT SANCTION MAP.pdf · uploaded 27 Aug 2022View
  • Building Plan Approval / NA Order for plotted developmentNA ORDER.pdf · uploaded 27 Aug 2022View
  • Commencement Certificates / NA Order for plotted developmentNA ORDER.pdf · uploaded 27 Aug 2022View
  • Declaration about Commencement CertificateFORMAT D_COMMENCEMENT.pdf · uploaded 27 Aug 2022Source
  • Disclosure of sold/ booked inventoryBOOK SOLD.pdf · uploaded 27 Aug 2022Source
  • CERSAI detailsCERSAI_DECLARATION.pdf · uploaded 27 Aug 2022Source
  • Proforma of Allotment letterAGREEMENT TO SALE_PROFARMA.pdf · uploaded 27 Aug 2022Source
  • Proforma of Allotment letterALLOTMENT LETTER_PROFARMA.pdf · uploaded 27 Aug 2022View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDECLARATION_SEPRATE BANK ACCOUNT.pdf · uploaded 27 Aug 2022Source
  • Deviation Report with respect to Allotment letterDEVIATION DECLARATION_ALLOTMENT LETTER.pdf · uploaded 27 Aug 2022Source
  • Deviation Report with respect to model copy of AgreementDEVIATION DECLARATION_AGREEMENT TO SALE.pdf · uploaded 27 Aug 2022View
  • CERSAI detailsCERSAI_Search_Report_200245713543_For_Asset_Based_Search_27_08_2022_16_55_25_237.pdf · uploaded 27 Aug 2022Source
  • Declaration in FORM BFORM B.pdf · uploaded 27 Aug 2022Source
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCOMPLETION LOCAL AUTHORITY.pdf · uploaded 10 Mar 2023Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Quality assurance certificate _ Saumya Nagari.pdf · uploaded 10 Mar 2023Source
  • Architect’s Certificate on Completion of Project (Form 4)Form 4_ Saumya Nagari.pdf · uploaded 21 Sep 2023Source

Promoter documents

  • Legal Title reportFORMAT A_SEARCH_PART 1.pdf · uploaded 27 Aug 2022Source
  • Legal Title reportFORMAT A_SEARCH_PART 2.pdf · uploaded 27 Aug 2022Source
  • Declaration Form BFORM B.pdf · uploaded 27 Aug 2022Source

Technical documents

  • Layout ApprovalLAYOUT SANCTION MAP.pdfView
  • NA Order for Plotted DevelopmentNA ORDER.pdfView

Proforma allotment letter

  • Proforma allotment letterALLOTMENT LETTER_PROFARMA.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Bhiwapur (534083), Wardha taluka

Survey, CTS, gat or plot numbers

19/2SURVEY NO. 19/2

As published on MahaRERA's project page

SURVEY NO. 19/2

Boundaries

North
Agri Land No 20
South
Pawnar Shiv
East
Agri Land Survey No 18
West
Agri Land Survey No 19-1 And 33

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectRohit A Rathi—
Chartered accountantDarshan Wakhariya—
EngineerSanjay Kakde—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology