Sai Suman Tower
Certificate SignedTisgaon, Thane 421306 |Promoter: M/S. RBG Constructions & Developers Pvt. Ltd.
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Buildings
- 1
- Unit types
- 1BHK, 2BHK, 3BHK, Office space, Shop, Society office, TENANT 1BHK, TENANT 2BHK, Tenant office, Tenant shop117 units in all
- Address
- S.No.13, H.No.1/1, 1/3, 1/4 AND 2, S.No.13, H.No.1/1, 1/3, 1/4 and 2, Village TisgaonPIN 421306
- Designated bank account
- 21
- Developed in phases
- No
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 2 years and 4 months
The latest completion date on record passed 2 years and 1 month ago.
- Registered
- 1 Nov 2018
- Promised
- 30 May 2022
- Revised
- 30 Sep 2024
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700018433 | 1 Nov 2018 | 30 May 2022 | 30 Sep 2024 | M/S. RBG Constructions & Developers Pvt. Ltd. | Project page |
1 building
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Sai Suman Tower | 18 | 117 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
117 of 117 units booked (100%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1BHK | 27.93 sq m · 301 sq ft | 1 | 1 |
| 1BHK | 28.5 sq m · 307 sq ft | 1 | 1 |
| 1BHK | 33.73 sq m · 363 sq ft | 6 | 6 |
| 1BHK | 33.78 sq m · 364 sq ft | 5 | 5 |
| 1BHK | 36.71 sq m · 395 sq ft | 1 | 1 |
| 1BHK | 37.12 sq m · 400 sq ft | 6 | 6 |
| 1BHK | 37.41 sq m · 403 sq ft | 4 | 4 |
| 1BHK | 37.42 sq m · 403 sq ft | 1 | 1 |
Show all 67 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1BHK | 37.76 sq m · 406 sq ft | 1 | 1 |
| 1BHK | 38.17 sq m · 411 sq ft | 4 | 4 |
| 1BHK | 38.46 sq m · 414 sq ft | 6 | 6 |
| 1BHK | 39.63 sq m · 427 sq ft | 1 | 1 |
| 1BHK | 46.81 sq m · 504 sq ft | 1 | 1 |
| 1BHK | 47.95 sq m · 516 sq ft | 1 | 1 |
| 2BHK | 41.64 sq m · 448 sq ft | 1 | 1 |
| 2BHK | 42.18 sq m · 454 sq ft | 4 | 4 |
| 2BHK | 42.22 sq m · 454 sq ft | 4 | 4 |
| 2BHK | 42.23 sq m · 455 sq ft | 1 | 1 |
| 2BHK | 44.06 sq m · 474 sq ft | 1 | 1 |
| 2BHK | 50.38 sq m · 542 sq ft | 1 | 1 |
| 2BHK | 54.51 sq m · 587 sq ft | 3 | 3 |
| 2BHK | 55.15 sq m · 594 sq ft | 2 | 2 |
| 2BHK | 66.9 sq m · 720 sq ft | 3 | 3 |
| 2BHK | 67.54 sq m · 727 sq ft | 3 | 3 |
| 3BHK | 122.91 sq m · 1,323 sq ft | 1 | 1 |
| Office space | 9.62 sq m · 104 sq ft | 1 | 1 |
| Office space | 16.22 sq m · 175 sq ft | 1 | 1 |
| Office space | 17.76 sq m · 191 sq ft | 2 | 2 |
| Office space | 18.45 sq m · 199 sq ft | 6 | 6 |
| Office space | 18.61 sq m · 200 sq ft | 1 | 1 |
| Office space | 20.95 sq m · 226 sq ft | 1 | 1 |
| Office space | 25.37 sq m · 273 sq ft | 1 | 1 |
| Office space | 33.12 sq m · 357 sq ft | 1 | 1 |
| Office space | 35.36 sq m · 381 sq ft | 2 | 2 |
| Office space | 68.88 sq m · 741 sq ft | 1 | 1 |
| Office space | 69.28 sq m · 746 sq ft | 1 | 1 |
| Office space | 87.6 sq m · 943 sq ft | 1 | 1 |
| Office space | 116.39 sq m · 1,253 sq ft | 1 | 1 |
| Shop | 9.17 sq m · 99 sq ft | 1 | 1 |
| Shop | 108.27 sq m · 1,165 sq ft | 1 | 1 |
| Society office | 10.31 sq m · 111 sq ft | 1 | 1 |
| TENANT 1BHK | 33.21 sq m · 357 sq ft | 2 | 2 |
| TENANT 1BHK | 33.73 sq m · 363 sq ft | 1 | 1 |
| TENANT 1BHK | 33.78 sq m · 364 sq ft | 1 | 1 |
| TENANT 1BHK | 37.41 sq m · 403 sq ft | 1 | 1 |
| TENANT 1BHK | 38.17 sq m · 411 sq ft | 3 | 3 |
| TENANT 1BHK | 38.46 sq m · 414 sq ft | 1 | 1 |
| TENANT 1BHK | 38.58 sq m · 415 sq ft | 2 | 2 |
| TENANT 1BHK | 67.54 sq m · 727 sq ft | 1 | 1 |
| TENANT 2BHK | 42.18 sq m · 454 sq ft | 2 | 2 |
| TENANT 2BHK | 42.22 sq m · 454 sq ft | 1 | 1 |
| TENANT 2BHK | 50.92 sq m · 548 sq ft | 1 | 1 |
| TENANT 2BHK | 51.09 sq m · 550 sq ft | 1 | 1 |
| TENANT 2BHK | 54.87 sq m · 591 sq ft | 1 | 1 |
| Tenant office | 9.21 sq m · 99 sq ft | 1 | 1 |
| Tenant shop | 6.6 sq m · 71 sq ft | 1 | 1 |
| Tenant shop | 13.68 sq m · 147 sq ft | 1 | 1 |
| Tenant shop | 16.41 sq m · 177 sq ft | 1 | 1 |
| Tenant shop | 16.62 sq m · 179 sq ft | 1 | 1 |
| Tenant shop | 17.88 sq m · 192 sq ft | 1 | 1 |
| Tenant shop | 18.09 sq m · 195 sq ft | 1 | 1 |
| Tenant shop | 18.19 sq m · 196 sq ft | 1 | 1 |
| Tenant shop | 19.41 sq m · 209 sq ft | 1 | 1 |
| Tenant shop | 19.78 sq m · 213 sq ft | 1 | 1 |
| Tenant shop | 20.53 sq m · 221 sq ft | 1 | 1 |
| Tenant shop | 22.97 sq m · 247 sq ft | 1 | 1 |
| Tenant shop | 39.69 sq m · 427 sq ft | 1 | 1 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
2 documents held by Deedo, 127 filings listed on MahaRERA's project page
Legal
Show all 129 documentsShow fewer documents
Migrated
- 1 Building Plan Approval (IOD)Amended CC-28-09-18.pdf · uploaded 24 Oct 2018Source
- 1 Commencement Certificates / NA Order for plotted developmentAmended CC-28-09-18.pdf · uploaded 24 Oct 2018Source
- 1 Declaration in FORM BForm 'B' Affidavit cum Declaration.pdf · uploaded 24 Oct 2018Source
- 1 Proforma of Allotment letterSale Agreement Draft.pdf · uploaded 24 Oct 2018Source
- 1 Copy of Layout Approval (in case of layout)Amended CC.pdf · uploaded 26 Oct 2018Source
- 2 Proforma of Allotment letterAllotment Letter.pdf · uploaded 26 Oct 2018Source
- 1 Certificates of CA (Form 3)Form 3 - CA Certificate.pdf · uploaded 27 Oct 2018Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Progress Report.pdf · uploaded 15 Oct 2020Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Progress Report.pdf · uploaded 15 Oct 2020Source
- 2 Commencement Certificates / NA Order for plotted developmentCC_compressed.pdf · uploaded 16 Oct 2020Source
- 2 Building Plan Approval (IOD)MYSCAN_0012.pdf · uploaded 17 Oct 2020Source
- 3 Building Plan Approval (IOD)MYSCAN_0013.pdf · uploaded 17 Oct 2020Source
- 4 Building Plan Approval (IOD)MYSCAN_0014.pdf · uploaded 17 Oct 2020Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate_compressed.pdf · uploaded 17 Oct 2020Source
- 1 OtherBank Details.pdf · uploaded 28 Nov 2020Source
- 5 Building Plan Approval (IOD)Floor Plan.pdf · uploaded 21 Apr 2022Source
- 3 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 21 Apr 2022Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg Certificate.pdf · uploaded 16 May 2022Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg Certificate.pdf · uploaded 16 May 2022Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg Certificate.pdf · uploaded 16 May 2022Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate.pdf · uploaded 16 May 2022Source
- 2 Certificates of CA (Form 3)CA Certificate.pdf · uploaded 16 May 2022Source
- 3 Certificates of CA (Form 3)CA Certificate.pdf · uploaded 16 May 2022Source
- 4 Certificates of CA (Form 3)CA Certificate.pdf · uploaded 16 May 2022Source
- 5 Certificates of CA (Form 3)CA Certificate.pdf · uploaded 16 May 2022Source
- 1 Declaration about Commencement CertificateDeclaration about Commencement Certificate.pdf · uploaded 19 May 2022Source
- 1 CERSAI detailsCersai Details.pdf · uploaded 19 May 2022Source
- 1 Disclosure of sold/ booked inventoryDisclosure of sold Booked Inventory.pdf · uploaded 19 May 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A Eng Certificate.pdf · uploaded 25 May 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A Eng Certificate.pdf · uploaded 25 May 2022Source
- 2 CERSAI detailsCersai.pdf · uploaded 25 May 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form 5.pdf · uploaded 25 May 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5.pdf · uploaded 25 May 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5.pdf · uploaded 25 May 2022Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)FORM 5.pdf · uploaded 26 May 2022Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)FORM 5.pdf · uploaded 26 May 2022Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)FORM 5.pdf · uploaded 26 May 2022Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate.pdf · uploaded 1 Jul 2022Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate.pdf · uploaded 1 Jul 2022Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate.pdf · uploaded 1 Jul 2022Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineers Certificate.pdf · uploaded 1 Jul 2022Source
- 6 Certificates of CA (Form 3)Form 3 CA Certificate.pdf · uploaded 1 Jul 2022Source
- 4 Commencement Certificates / NA Order for plotted developmentCC G 18.pdf · uploaded 2 Jul 2022Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE.pdf · uploaded 16 Dec 2022Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate.pdf · uploaded 16 Dec 2022Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineers Certificate.pdf · uploaded 16 Dec 2022Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate.pdf · uploaded 16 Dec 2022Source
- 7 Certificates of CA (Form 3)CA Certificate.pdf · uploaded 16 Dec 2022Source
- 8 Certificates of CA (Form 3)CA Certificate.pdf · uploaded 16 Dec 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form -5 2021-2022.pdf · uploaded 16 Dec 2022Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architech Certificate.pdf · uploaded 6 Feb 2023Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate.pdf · uploaded 6 Feb 2023Source
- 9 Certificates of CA (Form 3)CA Certificate.pdf · uploaded 6 Feb 2023Source
- 2 Declaration about Commencement CertificateDeclaration about Commencement Certificate Format-D.pdf · uploaded 8 Apr 2023Source
- 2 Disclosure of sold/ booked inventoryDisclosure of Sold Booked inventory.pdf · uploaded 8 Apr 2023Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Annexure I.pdf · uploaded 8 Apr 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A Eng Certificate.pdf · uploaded 11 Apr 2023Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECTS CERTIFICATE 31-12-2022.pdf · uploaded 25 Jul 2023Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate.pdf · uploaded 21 Aug 2023Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate.pdf · uploaded 21 Aug 2023Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineers Certificate.pdf · uploaded 21 Aug 2023Source
- 10 Certificates of CA (Form 3)Form 3 CA Certificate.pdf · uploaded 21 Aug 2023Source
- 11 Certificates of CA (Form 3)CA Certificate.pdf · uploaded 21 Aug 2023Source
- 12 Certificates of CA (Form 3)Form 3 CA Certificate.pdf · uploaded 3 Oct 2023Source
- 13 Certificates of CA (Form 3)Form 3 CA Certificate.pdf · uploaded 16 Nov 2023Source
- 2 Declaration in FORM BFORM B.pdf · uploaded 9 Dec 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A.pdf · uploaded 9 Dec 2023Source
- 3 Disclosure of sold/ booked inventoryDisclosure of sold Booked Inventory.pdf · uploaded 9 Dec 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5.pdf · uploaded 9 Dec 2023Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 3 Jan 2024Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 3 Jan 2024Source
- 14 Certificates of CA (Form 3)Form 3.pdf · uploaded 3 Jan 2024Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 4 Jan 2024Source
- 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 4 Jan 2024Source
- 15 Certificates of CA (Form 3)Form 3.pdf · uploaded 5 Mar 2024Source
- 16 Certificates of CA (Form 3)Form 3.pdf · uploaded 5 Mar 2024Source
- 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate.pdf · uploaded 19 Jun 2024Source
- 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate.pdf · uploaded 19 Jun 2024Source
- 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate.pdf · uploaded 19 Jun 2024Source
- 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate.pdf · uploaded 19 Jun 2024Source
- 17 Certificates of CA (Form 3)Form 3 CA Certificate.pdf · uploaded 19 Jun 2024Source
- 18 Certificates of CA (Form 3)Form 3 CA Certificate.pdf · uploaded 19 Jun 2024Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOC G PLUS 2.pdf · uploaded 6 Jul 2024Source
- 2 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOccupancy Certificate.pdf · uploaded 6 Jul 2024Source
- 1 Architect’s Certificate on Completion of Project (Form 4)FORM 4.pdf · uploaded 21 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 29 Jan 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 29 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 29 Jan 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 29 Jan 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A.pdf · uploaded 29 Jan 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5.pdf · uploaded 6 Feb 2025Source
- 2 Copy of Layout Approval (in case of layout)Page 2.pdf · uploaded 10 Feb 2025Source
- 3 Copy of Layout Approval (in case of layout)Page 3.pdf · uploaded 10 Feb 2025Source
- 4 Copy of Layout Approval (in case of layout)Page 4.pdf · uploaded 10 Feb 2025Source
- 1 Copy of Layout Approval (in case of layout)Page 1.pdf · uploaded 10 Feb 2025Source
- 2 Certificates of CA (Form 3)Form 3.pdf · uploaded 10 Feb 2025Source
- 1 Certificates of CA (Form 3)Form 3 April to june.pdf · uploaded 10 Feb 2025Source
- 1 Building Plan Approval (IOD)Page 1.pdf · uploaded 10 Feb 2025Source
- 2 Building Plan Approval (IOD)Page 2.pdf · uploaded 10 Feb 2025Source
- 3 Building Plan Approval (IOD)Page 3.pdf · uploaded 10 Feb 2025Source
- 4 Building Plan Approval (IOD)Page 4.pdf · uploaded 10 Feb 2025Source
Technical
- DocumentAmended CC-28-09-18.pdf · uploaded 24 Oct 2018Source
- DocumentAmended CC.pdf · uploaded 26 Oct 2018Source
- DocumentMYSCAN_0012.pdf · uploaded 17 Oct 2020Source
- DocumentMYSCAN_0013.pdf · uploaded 17 Oct 2020Source
- DocumentMYSCAN_0014.pdf · uploaded 17 Oct 2020Source
- DocumentFloor Plan.pdf · uploaded 21 Apr 2022Source
- DocumentPage 1.pdf · uploaded 10 Feb 2025Source
- DocumentPage 2.pdf · uploaded 10 Feb 2025Source
- DocumentPage 3.pdf · uploaded 10 Feb 2025Source
- DocumentPage 4.pdf · uploaded 10 Feb 2025Source
- DocumentPage 1.pdf · uploaded 10 Feb 2025Source
- DocumentPage 2.pdf · uploaded 10 Feb 2025Source
- DocumentPage 3.pdf · uploaded 10 Feb 2025Source
- DocumentPage 4.pdf · uploaded 10 Feb 2025Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Tisgaon, Kalyan taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Shri Eknath Gaikwad Building
- South
- 24MT Road
- East
- Survey No 38
- West
- 15MT Road
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Sthapatya Nirmaan | — |
Source: MahaRERA project page. Contact details are not shown.