Balram Complex
Certificate SignedTisgaon, Thane 421301 |Promoter: Universal Builders
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Buildings
- 2
- Unit types
- Bungalow, 1BHK, 2BHK95 units in all
- Address
- 2851 TO 2860, 2873 TO 2878, 2881 TO 2887, 2983 TO 2993, 7132 TO 7134, 2970, 2693, Tisgaon, TisgaonPIN 421301
- Designated bank account
- 148
- Developed in phases
- Yes
Location
Coordinates as published by MahaRERA
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion promised for 30 Jun 2026
The latest completion date on record passed 4 months ago.
- Registered
- 11 Apr 2022
- Promised
- 30 Jun 2026
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700034529 | 11 Apr 2022 | 30 Jun 2026 | 30 Jun 2026 | Universal Builders | Project page |
2 buildings
Buildings and wings named in the registration
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
51 of 95 units booked (54%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Wing A | Bungalow | 332.61 sq m · 3,580 sq ft | 1 | 0 |
| Wing B | 1BHK | 33.92 sq m · 365 sq ft | 1 | 1 |
| Wing B | 1BHK | 43.46 sq m · 468 sq ft | 14 | 9 |
| Wing B | 1BHK | 43.53 sq m · 469 sq ft | 13 | 6 |
| Wing B | 1BHK | 43.58 sq m · 469 sq ft | 1 | 1 |
| Wing B | 1BHK | 49.37 sq m · 531 sq ft | 17 | 10 |
| Wing B | 1BHK | 49.5 sq m · 533 sq ft | 15 | 10 |
| Wing B | 1BHK | 49.7 sq m · 535 sq ft | 14 | 3 |
Show all 11 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Wing B | 1BHK | 50.25 sq m · 541 sq ft | 15 | 7 |
| Wing B | 2BHK | 63.87 sq m · 687 sq ft | 2 | 2 |
| Wing B | 2BHK | 72.8 sq m · 784 sq ft | 2 | 2 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
1 document held by Deedo, 142 filings listed on MahaRERA's project page
Finance
- PAN CardBUILDERS PAN CARD.pdf · uploaded 5 Mar 2022Source
Legal
Migrated
- 1 PAN CardBUILDERS PAN CARD.pdf · uploaded 5 Mar 2022Source
- 1 Details of encumbrancescersai signed.pdf · uploaded 5 Mar 2022Source
- 1 Copy of Layout Approval (in case of layout)section copy-compressed KDMC CC.pdf · uploaded 5 Mar 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentsection copy-compressed KDMC CC.pdf · uploaded 5 Mar 2022Source
Show all 143 documentsShow fewer documents
Migrated
- 1 Declaration about Commencement CertificateDecclaration CC.pdf · uploaded 5 Mar 2022Source
- 1 Declaration in FORM BFORM (B)_compressed.pdf · uploaded 5 Mar 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)architect rera documemt Compressed.pdf · uploaded 5 Mar 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)KHASNIS RERA RCC_COMPRESSED.pdf · uploaded 5 Mar 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)NEW_FORM_3_CA_CERTIFICATE.pdf · uploaded 5 Mar 2022Source
- 1 Proforma of Allotment letter1.pdf · uploaded 5 Mar 2022Source
- 2 Proforma of Allotment letter2.pdf · uploaded 5 Mar 2022Source
- 3 Proforma of Allotment letter3.pdf · uploaded 5 Mar 2022Source
- 4 Proforma of Allotment letter4.pdf · uploaded 5 Mar 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentuniversal plan Compressed.pdf · uploaded 14 Mar 2022Source
- 5 Proforma of Allotment letterKHAREDI VATAP.pdf · uploaded 16 Mar 2022Source
- 1 Copy of the legal title reportLegal Title Report April22_Compressed.pdf · uploaded 6 Apr 2022Source
- 1 CERSAI detailscersai report_2Pg_Compressed.pdf · uploaded 6 Apr 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 2 Jan 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 2 Jan 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)JUNE CA.pdf · uploaded 2 Jan 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)SEPT CA.pdf · uploaded 2 Jan 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)arch certificate 30_12_2023.pdf · uploaded 13 Jun 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)arch certificate 30_03_2024.pdf · uploaded 13 Jun 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)CA FORM 5 12-01-2024.pdf · uploaded 15 Jun 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)engineer certificate form 2 30-12-2023.pdf · uploaded 26 Jun 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)31-03-2024 rera engineer certified .pdf · uploaded 26 Jun 2024Source
- 1 Disclosure of sold/ booked inventorysold unsold inventory.pdf · uploaded 26 Jun 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 29-05-2024.pdf · uploaded 26 Jun 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form2A 2023.pdf · uploaded 27 Jun 2024Source
- 2 Copy of Layout Approval (in case of layout)New plan copy 16 floor 2_1-1_rotated_compressed.pdf · uploaded 3 Jul 2024Source
- 2 Building Plan Approval / NA Order for plotted developmentNEW IOD 16 floor 2.pdf · uploaded 3 Jul 2024Source
- 3 Building Plan Approval / NA Order for plotted developmentNew plan copy 16 floor 2_2-end_rotated_compressed.pdf · uploaded 3 Jul 2024Source
- 2 Declaration about Commencement CertificateNEW DECLERATION OF CC.pdf · uploaded 6 Jul 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect certificate 25-06-2024.pdf · uploaded 21 Oct 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)rera architecture certificate .pdf · uploaded 21 Oct 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 30_09_2024 (1)_compressed.pdf · uploaded 21 Oct 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 engineers certificate 16-09-24.pdf · uploaded 21 Oct 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 engineers certificate 25-06-24.pdf · uploaded 21 Oct 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentNEW IOD 16 floor.pdf · uploaded 21 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentBinder1_compressed (1)_compressed (2).pdf · uploaded 21 Oct 2024Source
- 1 Disclosure of sold/ booked inventorysold unsold inventory 30_09_2024 (1).pdf · uploaded 21 Oct 2024Source
- 2 Declaration about Commencement CertificateC C DECLARATION.pdf · uploaded 21 Oct 2024Source
- 1 CERSAI detailscersai letter .pdf · uploaded 21 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)form 5 (4).pdf · uploaded 30 Dec 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects certificate 11_06_2023.pdf · uploaded 30 Jan 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects certificate 10_12_2024.pdf · uploaded 30 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects certificate 10_03_2023.pdf · uploaded 30 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 29_11_2024 (3)_compressed.pdf · uploaded 30 Jan 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Form 3 22_01_2025 (1)_compressed.pdf · uploaded 30 Jan 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineers Certificate 10_12_2024 (1).pdf · uploaded 30 Jan 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineers Certificate 10_03_2023.pdf · uploaded 30 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineers Certificate 11_06_2023.pdf · uploaded 30 Jan 2025Source
- 1 Declaration about Commencement Certificateform D (1).pdf · uploaded 30 Jan 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)form 2a year 2024.pdf · uploaded 30 Jan 2025Source
- Form 1FORM 1 JUNE 23.pdf · uploaded 13 Dec 2025Source
- Form 2FORM 2 JUNE 23.pdf · uploaded 13 Dec 2025Source
- Form 3FORM 3 JUNE 23.pdf · uploaded 13 Dec 2025Source
- Disclosure of Sold and Booked Inventorysold unsold 30_06_2023.pdf · uploaded 13 Dec 2025Source
- Disclosure of Sold and Booked Inventorysold unsold 31-12-2023(2) (1).pdf · uploaded 13 Dec 2025Source
- Form 1FORM 1 DEC 23.pdf · uploaded 13 Dec 2025Source
- Form 2FORM 2 DEC 23.pdf · uploaded 13 Dec 2025Source
- Form 3form 3 ca DEC 2023.pdf · uploaded 13 Dec 2025Source
- Form 1FORM 1 MARCH 24.pdf · uploaded 13 Dec 2025Source
- Form 2FORM 2 MARCH 24.pdf · uploaded 13 Dec 2025Source
- Form 3FORM 3 MARCH 24.pdf · uploaded 13 Dec 2025Source
- Disclosure of Sold and Booked Inventorysold unsold unit 31-04-24.pdf · uploaded 13 Dec 2025Source
- Form 1FORM 1 JUNE 24.pdf · uploaded 13 Dec 2025Source
- Form 2FORM 2 JUNE 24.pdf · uploaded 13 Dec 2025Source
- Form 3FORM 3 JUNE 24.pdf · uploaded 13 Dec 2025Source
- Disclosure of Sold and Booked Inventorysold unsold inventory 30-06-24.pdf · uploaded 13 Dec 2025Source
- Form 1FORM 1 DEC 24.pdf · uploaded 13 Dec 2025Source
- Form 2FORM 2 DEC 24.pdf · uploaded 13 Dec 2025Source
- Form 3FORM 3 DEC 24.pdf · uploaded 13 Dec 2025Source
- Disclosure of Sold and Booked Inventorysold unsold 31-12-2024.pdf · uploaded 13 Dec 2025Source
- Form 1FORM 1 SEPT 23.pdf · uploaded 26 Dec 2025Source
- Form 2FORM 2 SEPT 23.pdf · uploaded 26 Dec 2025Source
- Form 3FORM 3 SEPT 23.pdf · uploaded 26 Dec 2025Source
- Disclosure of Sold and Booked Inventorysold unsold sep 23.pdf · uploaded 26 Dec 2025Source
- Form 1FORM 1 SEPT 24.pdf · uploaded 26 Dec 2025Source
- Form 2FORM 2 SEPT 24.pdf · uploaded 26 Dec 2025Source
- Form 3FORM 3 SEPT 24.pdf · uploaded 26 Dec 2025Source
- Disclosure of Sold and Booked Inventorysold unsold sept 24.pdf · uploaded 26 Dec 2025Source
- Form 1FORM 1 March 25.pdf · uploaded 26 Dec 2025Source
- Form 2FORM 2 MARCH 25.pdf · uploaded 26 Dec 2025Source
- Form 3form 3.pdf · uploaded 26 Dec 2025Source
- Disclosure of Sold and Booked Inventorysold unsold 31-03-2025.pdf · uploaded 26 Dec 2025Source
- Form 1form 1 sept 25.pdf · uploaded 26 Dec 2025Source
- Form 2FORM 2 SEPT 25.pdf · uploaded 26 Dec 2025Source
- Form 3form 3 Sept 25.pdf · uploaded 26 Dec 2025Source
- Disclosure of Sold and Booked Inventorysold unsold sept 25.pdf · uploaded 26 Dec 2025Source
- Form 1form 1 june 22.pdf · uploaded 26 Dec 2025Source
- Form 2form 2 june 22.pdf · uploaded 26 Dec 2025Source
- Form 3FORM 3 june22.pdf · uploaded 26 Dec 2025Source
- Disclosure of Sold and Booked Inventorysold unsold june 22.pdf · uploaded 26 Dec 2025Source
- Form 1FORM 1 SEPT 22.pdf · uploaded 26 Dec 2025Source
- Form 2form 2 sept 22.pdf · uploaded 26 Dec 2025Source
- Disclosure of Sold and Booked Inventorysold unsold sept 22.pdf · uploaded 26 Dec 2025Source
- Form 3FORM 3 sept 22.pdf · uploaded 26 Dec 2025Source
- Form 1FORM 1 JUNE 25.pdf · uploaded 26 Dec 2025Source
- Form 2FORM 2 JUNE 25.pdf · uploaded 26 Dec 2025Source
- Form 3form 3 june 25.pdf · uploaded 26 Dec 2025Source
- Disclosure of Sold and Booked Inventorysold unsold june 25.pdf · uploaded 26 Dec 2025Source
- Form 1form 1 dec 22.pdf · uploaded 26 Dec 2025Source
- Form 2form 2 dec 22.pdf · uploaded 26 Dec 2025Source
- Form 3DEC.pdf · uploaded 26 Dec 2025Source
- Disclosure of Sold and Booked Inventorysold unsold dec 22.pdf · uploaded 26 Dec 2025Source
- Form 1FORM 1 MARCH 23.pdf · uploaded 26 Dec 2025Source
- Form 2FORM 2 MARCH 23.pdf · uploaded 26 Dec 2025Source
- Form 3MARCH.pdf · uploaded 26 Dec 2025Source
- Disclosure of Sold and Booked Inventorysold unsold 31_03_2023.pdf · uploaded 26 Dec 2025Source
- Withdrawal Update Form 1F1 - Q3 - Balram Complex.pdf · uploaded 2 Feb 2026Source
- Withdrawal Update Form 2F2 - Q3 - Balram Complex.pdf · uploaded 2 Feb 2026Source
- Withdrawal Update Form 3Universal Form 3.pdf · uploaded 2 Feb 2026Source
- Form 2A (FY 2022-2023)2023.pdf · uploaded 2 Feb 2026Source
- Form 2A (FY 2023-2024)2024.pdf · uploaded 2 Feb 2026Source
- Form 2A (FY 2024-2025)2025.pdf · uploaded 2 Feb 2026Source
- Form 2A (FY 2025-2026)Form 2A.pdf · uploaded 27 May 2026Source
- Form 5 (FY 2024-2025)Form 5 FY 24-25.pdf · uploaded 27 May 2026Source
- Withdrawal Update Form 1Form 1.pdf · uploaded 13 Jun 2026Source
- Withdrawal Update Form 2form 2.pdf · uploaded 13 Jun 2026Source
- Withdrawal Update Form 3FORM 3.pdf · uploaded 13 Jun 2026Source
Technical
- Documentsection copy-compressed KDMC CC.pdf · uploaded 5 Mar 2022Source
- Documentuniversal plan Compressed.pdf · uploaded 14 Mar 2022Source
- DocumentNew plan copy 16 floor 2_1-1_rotated_compressed.pdf · uploaded 3 Jul 2024Source
- DocumentNEW IOD 16 floor 2.pdf · uploaded 3 Jul 2024Source
- DocumentNew plan copy 16 floor 2_2-end_rotated_compressed.pdf · uploaded 3 Jul 2024Source
- DocumentBinder1_compressed (1)_compressed (2).pdf · uploaded 21 Oct 2024Source
Technical (Architect)
- DocumentArchitect certificate 25-06-2024.pdf · uploaded 21 Oct 2024Source
- Documentrera architecture certificate .pdf · uploaded 21 Oct 2024Source
- DocumentArchitects certificate 10_03_2023.pdf · uploaded 30 Jan 2025Source
- DocumentArchitects certificate 11_06_2023.pdf · uploaded 30 Jan 2025Source
- DocumentArchitects certificate 10_12_2024.pdf · uploaded 30 Jan 2025Source
- DocumentForm 1.pdf · uploaded 13 Jun 2026Source
Technical (Engineer)
- Documentform 2 engineers certificate 25-06-24.pdf · uploaded 21 Oct 2024Source
- Documentform 2 engineers certificate 16-09-24.pdf · uploaded 21 Oct 2024Source
- DocumentForm 2 Engineers Certificate 11_06_2023.pdf · uploaded 30 Jan 2025Source
- DocumentForm 2 Engineers Certificate 10_03_2023.pdf · uploaded 30 Jan 2025Source
- DocumentForm 2 Engineers Certificate 10_12_2024 (1).pdf · uploaded 30 Jan 2025Source
- Documentform 2.pdf · uploaded 13 Jun 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Tisgaon, Kalyan taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Ram Shankar Gaikwad Kailas Hari Gaikwad Property
- South
- Balaram Arjun Gaikwad Property
- East
- Rajendra Krushna Gaikwad Property
- West
- Jayaram Padu Gaikwad Property
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | R K Associates | — |
| Chartered accountant | A R Pandya & Co | — |
| Chartered accountant | Rashesh P Patel | — |
| Engineer | Jitendra Pareek | — |
| Engineer | Khasnis & Associates | — |
Source: MahaRERA project page. Contact details are not shown.