Zenith

Certificate Signed

Thane (M Corp.), Thane 400608 |Promoter: Runwal Developers Limited

Residential / Group HousingRERAP51700046734
1 Sep 2022Registered with MahaRERA
30 Sep 2028Promised completion
30 Jan 2029Revised completionPushed back 4 months
1Building
290Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Buildings
1
Unit types
—290 units in all
Address
Survey No 51 Hissa No 1 To 15 Survey No 52 Hissa No 1 To 3 Survey No 53, Balkum Road, Balkum DhokaliPIN 400608
Designated bank account
85
Developed in phases
No

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.21833, 72.97809
Zenith is at latitude 19.21833, longitude 72.97809.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 4 months

Registered
1 Sep 2022
Promised
30 Sep 2028
Revised
30 Jan 2029

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P517000467341 Sep 202230 Sep 202830 Jan 2029Runwal Developers LimitedProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Tower 1449290

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

290 units registered

— · 290 units
TypeCarpet areaUnits
——290

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 119 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPan Card - DWMPL.pdf · uploaded 4 Aug 2022Source
  • PAN CardPan Card - RDPL.pdf · uploaded 28 Oct 2024Source

Legal

  • Declaration Form BForm B Affidavit cum Declaration.pdf · uploaded 4 Aug 2022Source
  • Legal Title reportLegal Title Report 20082022 Zenith.pdf · uploaded 20 Aug 2022Source

Migrated

  • 1 Copy of Layout Approval (in case of layout)LAYOUT.pdf · uploaded 3 Aug 2022Source
  • 1 Building Plan Approval / NA Order for plotted developmentPermission Document.pdf · uploaded 3 Aug 2022Source
  • 2 Building Plan Approval / NA Order for plotted developmentTypical Floor Plan.pdf · uploaded 3 Aug 2022Source
Show all 120 documentsShow fewer documents

Migrated

  • 3 Building Plan Approval / NA Order for plotted developmentSection.pdf · uploaded 3 Aug 2022Source
  • 1 PAN CardPan Card - DWMPL.pdf · uploaded 4 Aug 2022Source
  • 1 Declaration in FORM BForm B Affidavit cum Declaration.pdf · uploaded 4 Aug 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificate DWMPL dated 29 7 22.pdf · uploaded 4 Aug 2022Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 4 Aug 2022Source
  • 1 Disclosure of sold/ booked inventorySold unsold inventory.pdf · uploaded 4 Aug 2022Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 4 Aug 2022Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration - Bank Account.pdf · uploaded 4 Aug 2022Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC 05082022.pdf · uploaded 5 Aug 2022Source
  • 1 Declaration about Commencement CertificateDeclaration about Commencement Certificate Format D.pdf · uploaded 5 Aug 2022Source
  • 1 CERSAI detailsRevised Zenith 11 08 2022.pdf · uploaded 11 Aug 2022Source
  • 1 a Details of encumbrances concerned to FinanceEncumberance concern to finance.pdf · uploaded 18 Aug 2022Source
  • 1 b Details of encumbrances concerned to LegalSelf decleration regarding encumbrance legal.pdf · uploaded 18 Aug 2022Source
  • 1 Proforma of Allotment letterAllotment Letter.pdf · uploaded 18 Aug 2022Source
  • 1 Deviation Report with respect to Allotment letterDeclaration on Deviation in Allotment 18 8 2022.pdf · uploaded 18 Aug 2022Source
  • 1 Copy of the legal title reportLegal Title Report 20082022 Zenith.pdf · uploaded 20 Aug 2022Source
  • 2 Proforma of Allotment letterFIRST DRAFT OF AFS - ZENITH 29 08 2022.pdf · uploaded 29 Aug 2022Source
  • 1 Deviation Report with respect to model copy of AgreementDeclaration on Deviation in AFS Part I.pdf · uploaded 29 Aug 2022Source
  • 2 Deviation Report with respect to model copy of AgreementDeclaration on Deviation in AFS Part II.pdf · uploaded 29 Aug 2022Source
  • 3 Deviation Report with respect to model copy of AgreementDeclaration on Deviation in AFS Part III.pdf · uploaded 29 Aug 2022Source
  • 4 Deviation Report with respect to model copy of AgreementDeclaration on Deviation in AFS Part IV.pdf · uploaded 29 Aug 2022Source
  • 5 Deviation Report with respect to model copy of AgreementDeclaration on Deviation in AFS Part V.pdf · uploaded 29 Aug 2022Source
  • 6 Deviation Report with respect to model copy of AgreementDeclaration on Deviation in AFS Part VI.pdf · uploaded 29 Aug 2022Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Zenith Form 1.pdf · uploaded 20 Jan 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Zenith Engineers Certificate.pdf · uploaded 20 Jan 2023Source
  • 2 Disclosure of sold/ booked inventoryZenith sold and unsold.pdf · uploaded 20 Jan 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Zenith.pdf · uploaded 20 Jan 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA certificate for 31 03 2023.pdf · uploaded 19 Apr 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate 31 03 2023.pdf · uploaded 20 Apr 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Zenith 31 03 2023.pdf · uploaded 20 Apr 2023Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate 31 03 2023.pdf · uploaded 21 Apr 2023Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Zenith 31 03 2023.pdf · uploaded 21 Apr 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Zenith 31 03 2023.pdf · uploaded 21 Apr 2023Source
  • 3 Disclosure of sold/ booked inventorySold Unsold Zenith 31 03 2023.pdf · uploaded 21 Apr 2023Source
  • 4 Disclosure of sold/ booked inventorySold Unsold Inventory 31 03 2023.pdf · uploaded 21 Apr 2023Source
  • 2 a Details of encumbrances concerned to FinanceSelf Declaration of Encumbrances 25 05 2023.pdf · uploaded 25 May 2023Source
  • 2 b Details of encumbrances concerned to LegalSelf Declaration of Encumbrances 25 05 2023.pdf · uploaded 25 May 2023Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Zenith as on 30 06 2023.pdf · uploaded 21 Jul 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 as on 30 60 2023.pdf · uploaded 21 Jul 2023Source
  • 5 Disclosure of sold/ booked inventorySold Unsold list Zenith.pdf · uploaded 21 Jul 2023Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Zenith as on 30 06 2023 compressed.pdf · uploaded 21 Jul 2023Source
  • 1 Other – TechnicalPLAN FOR RERA Zenith 24 07 2023.pdf · uploaded 31 Jul 2023Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Zenith.pdf · uploaded 19 Oct 2023Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Zenith 30 Sept 2023.pdf · uploaded 20 Oct 2023Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form1 Zenith.pdf · uploaded 23 Oct 2023Source
  • 1 Home Buyer /Allottee Grievance Redressal CellDeclaration Zenith.pdf · uploaded 23 Oct 2023Source
  • 6 Disclosure of sold/ booked inventorySold Unsold Zenith 30 09 2023.pdf · uploaded 26 Oct 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5.pdf · uploaded 16 Nov 2023Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 18 Jan 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A.pdf · uploaded 18 Jan 2024Source
  • 7 Disclosure of sold/ booked inventorySold Unsold Inventory compressed.pdf · uploaded 19 Jan 2024Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 compressed.pdf · uploaded 19 Jan 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)From 2.pdf · uploaded 23 Jan 2024Source
  • 8 Disclosure of sold/ booked inventorySold Unsold Inventory March 2024.pdf · uploaded 19 Apr 2024Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 March 24.pdf · uploaded 19 Apr 2024Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 March 2024.pdf · uploaded 20 Apr 2024Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A March 2024.pdf · uploaded 20 Apr 2024Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 March 2024.pdf · uploaded 29 Apr 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A March 2024.pdf · uploaded 2 May 2024Source
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 June 2024.pdf · uploaded 22 Jul 2024Source
  • 9 Disclosure of sold/ booked inventorySold Unsold Inventory.pdf · uploaded 22 Jul 2024Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 June 2024.pdf · uploaded 22 Jul 2024Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 June 2024.pdf · uploaded 23 Jul 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Sep 2024.pdf · uploaded 18 Oct 2024Source
  • 2 Disclosure of sold/ booked inventorySold Unsold Inventory Sep 2024.pdf · uploaded 21 Oct 2024Source
  • 1 PAN CardPan Card - RDPL.pdf · uploaded 28 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Sep 2024.pdf · uploaded 28 Oct 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Sep 2024.pdf · uploaded 5 Nov 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 2023 24.pdf · uploaded 13 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Dec 2024.pdf · uploaded 21 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Dec 2024.pdf · uploaded 21 Jan 2025Source
  • 1 Disclosure of sold/ booked inventorySold Unsold Dec 2024.pdf · uploaded 23 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Dec 24.pdf · uploaded 27 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 18 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 18 Apr 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 5 May 2025Source
  • 1 Disclosure of sold/ booked inventorySold unsold.pdf · uploaded 5 May 2025Source
  • Form 1Form 1.pdf · uploaded 30 Jul 2025Source
  • Form 2Form 2 June.pdf · uploaded 30 Jul 2025Source
  • Form 3Form 3 June 2025.pdf · uploaded 30 Jul 2025Source
  • Disclosure of Sold and Booked InventorySold Unsold Inventory.pdf · uploaded 30 Jul 2025Source
  • Form 1Form 1.pdf · uploaded 28 Oct 2025Source
  • Form 2Form 2.pdf · uploaded 28 Oct 2025Source
  • Form 3Form 3.pdf · uploaded 28 Oct 2025Source
  • Disclosure of Sold and Booked InventorySold Unsold Inventory.pdf · uploaded 28 Oct 2025Source
  • Form 5 (FY 2024-2025)Form 5.pdf · uploaded 3 Dec 2025Source
  • Form 2A (FY 2024-2025)Form 2A.pdf · uploaded 11 Dec 2025Source
  • Form 1Form 1.pdf · uploaded 4 Feb 2026Source
  • Form 2Form 2-Zenith-M.pdf · uploaded 4 Feb 2026Source
  • Form 3Form 3-Zenith.pdf · uploaded 4 Feb 2026Source
  • Disclosure of Sold and Booked InventoryZenith-Sold-Unsold.pdf · uploaded 4 Feb 2026Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 24 Apr 2026Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 24 Apr 2026Source
  • Withdrawal Update Form 3Form 3.pdf · uploaded 24 Apr 2026Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 13 Jul 2026Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 13 Jul 2026Source
  • Withdrawal Update Form 3Form 3.pdf · uploaded 13 Jul 2026Source
  • Form 2A (FY 2025-2026)Form 2A.pdf · uploaded 17 Jul 2026Source
  • Form 5 (FY 2025-2026)Form 5-Zenith.pdf · uploaded 1 Oct 2026Source

Technical

  • DocumentLAYOUT.pdf · uploaded 3 Aug 2022Source
  • DocumentPermission Document.pdf · uploaded 3 Aug 2022Source
  • DocumentTypical Floor Plan.pdf · uploaded 3 Aug 2022Source
  • DocumentSection.pdf · uploaded 3 Aug 2022Source
  • Other – TechnicalPLAN FOR RERA Zenith 24 07 2023.pdf · uploaded 31 Jul 2023Source

Technical (Architect)

  • DocumentForm 1 Sep 2024.pdf · uploaded 5 Nov 2024Source
  • DocumentForm 1 Dec 2024.pdf · uploaded 21 Jan 2025Source
  • DocumentForm 1.pdf · uploaded 5 May 2025Source
  • DocumentForm 1.pdf · uploaded 13 Jul 2026Source

Technical (Engineer)

  • DocumentForm 2 Sep 2024.pdf · uploaded 28 Oct 2024Source
  • DocumentForm 2 Dec 24.pdf · uploaded 27 Jan 2025Source
  • DocumentForm 2.pdf · uploaded 18 Apr 2025Source
  • DocumentForm 2.pdf · uploaded 13 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Thane (M Corp.), Thane taluka

Survey, CTS, gat or plot numbers

SURVEY NO 51 HISSA NO 1 TO 15 SURVEY NO 52 HISSA NO 1 TO 3 SURVEY NO 53

Boundaries

North
Mseb
South
20 Mtr Wide Dp Road
East
30 Mtr Wide Dp Road
West
12 Mtr Wide Access Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectNinad Dinkar Mhaskar—
ArchitectPallavi Matkari—
Chartered accountantS P Gunjal & Associates—
EngineerMadhusudhan Narayan—
EngineerPrashant Mewada—
Registered real estate agentAddressofchoice Realty Pvt Ltd—
Registered real estate agentAdhik Balu Mahajan—
Registered real estate agentAmardeep Rajendra Tiwari—
Show all 46 professionalsShow fewer professionals
RoleNameRegistration no.
Registered real estate agentAnand Shrikant Khedlekar—
Registered real estate agentBlue Lotus—
Registered real estate agentBullmen Realty India Private Limited—
Registered real estate agentCorazon Homes And Securities—
Registered real estate agentCraft Financial Advisors Pvt Ltd—
Registered real estate agentDigipace Consulting (Opc) Private Limited—
Registered real estate agentDuvonto Consulting Private Limited—
Registered real estate agentEqserv Private Limited—
Registered real estate agentGaneshkumar Muthukumar Nadar—
Registered real estate agentHeadways Realty—
Registered real estate agentHome Bazaar Services Pvt Ltd—
Registered real estate agentHorizon Financial &Properties Advisers Private Limited—
Registered real estate agentHousezinn Properties Private Limited—
Registered real estate agentIndobricks Real Estate Advisory Private Limited—
Registered real estate agentJagesh Govind Kamat—
Registered real estate agentJM Financial Products Limited—
Registered real estate agentKanchan Ramesh Parmar—
Registered real estate agentKaycomm Realty LLP—
Registered real estate agentKritika Estate Agency—
Registered real estate agentLivnest Technologies Private Limited—
Registered real estate agentMahavir Prasad Toshniwal—
Registered real estate agentManisha Lifespaces Consulting Pvt. Ltd.—
Registered real estate agentManoj Rathod—
Registered real estate agentMarketing Space Private Limited—
Registered real estate agentMethod and Madness Technology Private Limited—
Registered real estate agentMystic India Realtors LLP—
Registered real estate agentNobroker Technologies Solutions Private Limited—
Registered real estate agentPin Click Property Management Pvt Ltd.—
Registered real estate agentPinkode Realty LLP—
Registered real estate agentPrelaunch Realty Private Limited—
Registered real estate agentProptiger Marketing Services Private Limited—
Registered real estate agentRajesh Kumar Gupta—
Registered real estate agentRavi Shukla—
Registered real estate agentSaurabh Gangwar—
Registered real estate agentSeed Realty Private Limited—
Registered real estate agentSuresh Ramchandra Soni—
Registered real estate agentTrespect India Private Ltd—
Registered real estate agentWillow Stone Realty Private Limited—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology