Wagle Trade Square

Certificate Signed

Thane (M Corp.), Thane 400604 |Promoter: Squarefeet Real Estate

21 Nov 2022Registered with MahaRERA
31 Aug 2027Promised completion
31 Dec 2027Revised completionPushed back 4 months
1Building
289Units registered68 booked (24%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Commercial
Status on MahaRERA
Certificate Signed
Buildings
1
Unit types
Office space, Shop289 units in all
Address
Plot No C 30, Road No 16, Wagle EstatePIN 400604
Designated bank account
76
Developed in phases
No

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.19280, 72.95340
Wagle Trade Square is at latitude 19.19280, longitude 72.95340.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 4 months

Registered
21 Nov 2022
Promised
31 Aug 2027
Revised
31 Dec 2027

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5170004768921 Nov 202231 Aug 202731 Dec 2027Squarefeet Real EstateProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
IT Park Building20289

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

68 of 289 units booked (24%), as the promoter reported to MahaRERA

Office space · 278 unitsShop · 11 units
TypeCarpet areaUnitsBooked
Office space48.33 sq m · 520 sq ft196
Office space50.26 sq m · 541 sq ft199
Office space52.47 sq m · 565 sq ft195
Office space55.79 sq m · 601 sq ft196
Office space56.62 sq m · 609 sq ft196
Office space58 sq m · 624 sq ft190
Office space60.48 sq m · 651 sq ft182
Office space61.26 sq m · 659 sq ft190
Show all 24 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
Office space67.15 sq m · 723 sq ft195
Office space67.76 sq m · 729 sq ft192
Office space70.14 sq m · 755 sq ft197
Office space70.64 sq m · 760 sq ft198
Office space70.73 sq m · 761 sq ft182
Office space71.98 sq m · 775 sq ft196
Office space79.03 sq m · 851 sq ft141
Shop42.29 sq m · 455 sq ft10
Shop47.06 sq m · 507 sq ft10
Shop48.14 sq m · 518 sq ft21
Shop48.64 sq m · 524 sq ft22
Shop48.77 sq m · 525 sq ft10
Shop50.98 sq m · 549 sq ft10
Shop79.59 sq m · 857 sq ft10
Shop92.76 sq m · 998 sq ft10
Shop283.61 sq m · 3,053 sq ft10

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 143 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardNEW PAN CARD - Square Feet Real Estate.pdf · uploaded 28 Sep 2022Source

Legal

  • Legal Title reportC-30 square title certificate.pdf · uploaded 28 Sep 2022Source
  • Declaration Form BFORM B_compressed.pdf · uploaded 30 Sep 2022Source
  • Declaration Form BC30 Square Lease Deed (Deed of Assignment) Page 01 - 10.pdf · uploaded 21 Sep 2026Source
  • Declaration Form BC30 Square Lease Deed (Deed of Assignment) Page 11 - 20.pdf · uploaded 21 Sep 2026Source
  • Declaration Form BC30 Square Lease Deed (Deed of Assignment) Page 21 - 30.pdf · uploaded 21 Sep 2026Source
  • Declaration Form BC30 Square Lease Deed (Deed of Assignment) Page 31 - 40.pdf · uploaded 21 Sep 2026Source
Show all 144 documentsShow fewer documents

Legal

  • Declaration Form BC30 Square Lease Deed (Deed of Assignment) Page 41 - 50.pdf · uploaded 21 Sep 2026Source
  • Declaration Form BC30 Square Lease Deed (Deed of Assignment) Page 51-60.pdf · uploaded 21 Sep 2026Source
  • Declaration Form BC30 Square Lease Deed (Deed of Assignment) Page 61 - 70.pdf · uploaded 21 Sep 2026Source
  • Declaration Form BC30 Square Lease Deed (Deed of Assignment) Page 71-80.pdf · uploaded 21 Sep 2026Source
  • Declaration Form BC30 Square Lease Deed (Deed of Assignment) Page 81 - 90.pdf · uploaded 21 Sep 2026Source
  • Declaration Form BC30 Square Lease Deed (Deed of Assignment) Page 91 - 100.pdf · uploaded 21 Sep 2026Source
  • Declaration Form BC30 Square Lease Deed (Deed of Assignment) Page 101 - 110.pdf · uploaded 21 Sep 2026Source
  • Declaration Form BC30 Square Lease Deed (Deed of Assignment) Page 111 - 120.pdf · uploaded 21 Sep 2026Source
  • Declaration Form BC30 Square Lease Deed (Deed of Assignment) Page 121 - 130.pdf · uploaded 21 Sep 2026Source
  • Declaration Form BC30 Square Lease Deed (Deed of Assignment) Page 131 - 141.pdf · uploaded 21 Sep 2026Source
  • Declaration Form BC 30 Transfer Order.pdf · uploaded 21 Sep 2026Source

Migrated

  • 1 PAN CardNEW PAN CARD - Square Feet Real Estate.pdf · uploaded 28 Sep 2022Source
  • 1 Copy of the legal title reportC-30 square title certificate.pdf · uploaded 28 Sep 2022Source
  • 1 a Details of encumbrances concerned to FinanceNo Encumberance Certificate To Finance.pdf · uploaded 28 Sep 2022Source
  • 1 b Details of encumbrances concerned to LegalNo Encumberance Certificate.pdf · uploaded 28 Sep 2022Source
  • 1 Commencement Certificates / NA Order for plotted developmentC 30 CC APPROVAL LETTER.PDF · uploaded 28 Sep 2022Source
  • 1 Declaration about Commencement CertificateDeclaration About Commencement Certificate.pdf · uploaded 28 Sep 2022Source
  • 1 Disclosure of sold/ booked inventorySold, Unsold Inventory.pdf · uploaded 28 Sep 2022Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A.pdf · uploaded 28 Sep 2022Source
  • 1 Declaration in FORM BFORM B_compressed.pdf · uploaded 30 Sep 2022Source
  • 1 CERSAI detailsCERSAI_Search_Report_200248594988_For_Asset_Based_Search_30_09_2022_16_34_34_858.pdf · uploaded 30 Sep 2022Source
  • 1 Deviation Report with respect to Allotment letterALLOTMENT DEVIATION_removed.pdf · uploaded 3 Oct 2022Source
  • 1 Copy of Layout Approval (in case of layout)C-30 APPROVED DRAWING_compressed.pdf · uploaded 27 Oct 2022Source
  • 1 Building Plan Approval / NA Order for plotted developmentC-30 APPROVED DRAWING_compressed.pdf · uploaded 27 Oct 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE FORM 1 compressed.pdf · uploaded 27 Oct 2022Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER CERTIFICATE FORM 2 compressed.pdf · uploaded 27 Oct 2022Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE FORM 3 compressed.pdf · uploaded 27 Oct 2022Source
  • 1 Proforma of Allotment letterRERA Allotment Letter - C30 Square.pdf · uploaded 29 Oct 2022Source
  • 1 Proforma of Agreement for saleRERA Agreement - 31-10-2022.pdf · uploaded 31 Oct 2022Source
  • 1 Deviation Report with respect to model copy of AgreementDeviation Report for Agreement Dated 01-10-2022.pdf · uploaded 31 Oct 2022Source
  • 2 a Details of encumbrances concerned to FinanceENCUMBERANCE CERTIFICATE TO FINANCE 14-12-2022.pdf · uploaded 25 Jan 2023Source
  • 2 b Details of encumbrances concerned to LegalENCUMBERANCE CERTIFICATE TO FINANCE 14-12-2022.pdf · uploaded 25 Jan 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)C30 FORM 1 ARCHITECT CERT.pdf · uploaded 25 Jan 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)C30 FORM 2 ENGINEERING CERT.pdf · uploaded 25 Jan 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)C30 FORM 3 CA CERT.pdf · uploaded 25 Jan 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate 01-04-2023.pdf · uploaded 16 May 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)RCC Certificate 01-04-2023.pdf · uploaded 16 May 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA Certificate - C30 Square_compressed.pdf · uploaded 19 Jul 2023Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)C30 FORM 3CA CERTIFIED 30-06-2023.pdf · uploaded 27 Jul 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE (2).pdf · uploaded 31 Jul 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER CERTIFICATE.pdf · uploaded 31 Jul 2023Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM1 APICES 01-10-23.pdf · uploaded 23 Dec 2023Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM2 ENGINEER CERTIFICATE 01-10-23.pdf · uploaded 23 Dec 2023Source
  • 2 Building Plan Approval / NA Order for plotted development2023-12-13 APPROVED DRAWING.pdf · uploaded 2 Jan 2024Source
  • 2 Commencement Certificates / NA Order for plotted development2023-12-13 APPROVED CC LETTER.pdf · uploaded 2 Jan 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 CA CERTIFICATE 30-09-2023_compressed.pdf · uploaded 2 Jan 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Annual CA Report 13th sept 22_organized.pdf · uploaded 5 Mar 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 01-01-2024.pdf · uploaded 11 Apr 2024Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 31-03-2024.pdf · uploaded 11 Apr 2024Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA Certificate - C30 Square_compressed (1).pdf · uploaded 11 Apr 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM-2_ENGINEER'S CERTIFICATE_01-01-2024.pdf · uploaded 16 Apr 2024Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM-2_ENGINEER'S CERTIFICATE_31-03-2024.pdf · uploaded 16 Apr 2024Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM-3_CA CERTIFICATE_31-03-2024_compressed.pdf · uploaded 16 Apr 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate 30-06-2024_compressed.pdf · uploaded 21 Nov 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)C 30 - CA Certificate_compressed.pdf · uploaded 21 Nov 2024Source
  • 1 Commencement Certificates / NA Order for plotted developmentC30 CC letter 28-10-2024.pdf · uploaded 21 Nov 2024Source
  • 1 Building Plan Approval / NA Order for plotted developmentC30 Drawings 28-10-2024.pdf · uploaded 21 Nov 2024Source
  • 1 Declaration about Commencement CertificateDeclaration About Commencement Certificate 21-11-2024.pdf · uploaded 21 Nov 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 31-03-2024.pdf · uploaded 21 Nov 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 28-06-2024.pdf · uploaded 22 Nov 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 30-09-2024.pdf · uploaded 22 Nov 2024Source
  • 1 Disclosure of sold/ booked inventorySold_Unsold_Fresh_RERA_C30_Square 31-12-2022.pdf · uploaded 22 Nov 2024Source
  • 8 Disclosure of sold/ booked inventorySold_Unsold_Fresh_RERA_C30_Square 30-09-2024.pdf · uploaded 22 Nov 2024Source
  • 7 Disclosure of sold/ booked inventorySold_Unsold_Fresh_RERA_C30_Square 30-06-2024.pdf · uploaded 22 Nov 2024Source
  • 6 Disclosure of sold/ booked inventorySold_Unsold_Fresh_RERA_C30_Square 31-03-2024.pdf · uploaded 22 Nov 2024Source
  • 5 Disclosure of sold/ booked inventorySold_Unsold_Fresh_RERA_C30_Square 31-12-2023.pdf · uploaded 22 Nov 2024Source
  • 4 Disclosure of sold/ booked inventorySold_Unsold_Fresh_RERA_C30_Square 30-09-2023.pdf · uploaded 22 Nov 2024Source
  • 3 Disclosure of sold/ booked inventorySold_Unsold_Fresh_RERA_C30_Square 30-06-2023.pdf · uploaded 22 Nov 2024Source
  • 2 Disclosure of sold/ booked inventorySold_Unsold_Fresh_RERA_C30_Square 31-03-2023.pdf · uploaded 22 Nov 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 30-06-2024.pdf · uploaded 23 Nov 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 30-09-2024.pdf · uploaded 23 Nov 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM 2A 31-03-2023.pdf · uploaded 23 Nov 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A 31-03-2024.pdf · uploaded 23 Nov 2024Source
  • 9 Disclosure of sold/ booked inventorySOLD AND UNSOLD.pdf · uploaded 14 Dec 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)ca certificate form 3-compressed.pdf · uploaded 27 Dec 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)ca certificate form 3 - final.pdf · uploaded 27 Dec 2024Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the same2 Declaration-cum-undertaking for change of bank account (Annexure A).pdf · uploaded 27 Dec 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 16 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 16 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 16 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE - 31-03-2025.pdf · uploaded 17 May 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE - 31-03-2025-compressed.pdf · uploaded 17 May 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER'S CERTIFICATE- 31-03-2025.pdf · uploaded 17 May 2025Source
  • Form 1ARCHITECT CERTIFICATE - 31-03-2025.pdf · uploaded 27 Jun 2025Source
  • Form 2ENGINEER'S CERTIFICATE- 31-03-2025.pdf · uploaded 27 Jun 2025Source
  • Form 3CA CERTIFICATE - 31-03-2025_compressed.pdf · uploaded 27 Jun 2025Source
  • Disclosure of Sold and Booked InventorySold Unsold Units 31-3-2025.pdf · uploaded 27 Jun 2025Source
  • Withdrawal Update Form 1FORM 1.pdf · uploaded 11 Aug 2025Source
  • Withdrawal Update Form 1FORM 1.pdf · uploaded 11 Aug 2025Source
  • Withdrawal Update Form 2FORM-2_ENGINEERu0027S CERTIFICATE_18-09-2024.pdf · uploaded 11 Aug 2025Source
  • Withdrawal Update Form 2FORM 2.pdf · uploaded 11 Aug 2025Source
  • Withdrawal Update Form 3CA CERTIFICATE - 31-03-2025_compressed.pdf · uploaded 11 Aug 2025Source
  • Withdrawal Update Form 3FORM 3.pdf · uploaded 11 Aug 2025Source
  • Withdrawal Update Form 1form 1.pdf · uploaded 17 Nov 2025Source
  • Withdrawal Update Form 2fORM 2.pdf · uploaded 17 Nov 2025Source
  • Withdrawal Update Form 3FORM 3 C30.pdf · uploaded 17 Nov 2025Source
  • Form 5 (FY 2024-2025)FORM 5_C30.pdf · uploaded 18 Nov 2025Source
  • Withdrawal Update Form 1C30 Form 1 .pdf · uploaded 23 Jan 2026Source
  • Withdrawal Update Form 2C30 Form 2.pdf · uploaded 23 Jan 2026Source
  • Withdrawal Update Form 3C30 Form 3.pdf · uploaded 23 Jan 2026Source
  • Withdrawal Update Form 1FORM-1 ARCHITECT MAR-26.pdf · uploaded 16 Apr 2026Source
  • Withdrawal Update Form 2FORM-2 ENGINNER MAR-26.pdf · uploaded 16 Apr 2026Source
  • Withdrawal Update Form 3FORM-3 CA MAR-26.pdf · uploaded 16 Apr 2026Source
  • Withdrawal Update Form 1Form 1 Q126.pdf · uploaded 11 Jul 2026Source
  • Withdrawal Update Form 2Form 2 Q126.pdf · uploaded 11 Jul 2026Source
  • Withdrawal Update Form 3Form 3 Q126.pdf · uploaded 11 Jul 2026Source
  • Form 2A (FY 2022-2023)Form 2(A) 2023.pdf · uploaded 17 Aug 2026Source
  • Form 2A (FY 2023-2024)Form 2(A) 2024.pdf · uploaded 17 Aug 2026Source
  • Form 2A (FY 2024-2025)Form 2(A) 2025.pdf · uploaded 17 Aug 2026Source
  • Form 2A (FY 2025-2026)Form 2(A) 2026.pdf · uploaded 17 Aug 2026Source
  • Withdrawal Update Form 1Form 1 Q226.pdf · uploaded 10 Oct 2026Source
  • Withdrawal Update Form 2Form 2 Q226.pdf · uploaded 10 Oct 2026Source
  • Withdrawal Update Form 3Form 3 Q226.pdf · uploaded 10 Oct 2026Source
  • Form 5 (FY 2025-2026)Wagle Trade Square - RERA Form 5 - 2025-2026.pdf · uploaded 13 Oct 2026Source

Technical

  • DocumentC-30 APPROVED DRAWING_compressed.pdf · uploaded 27 Oct 2022Source
  • DocumentC-30 APPROVED DRAWING_compressed.pdf · uploaded 27 Oct 2022Source
  • Document2023-12-13 APPROVED DRAWING.pdf · uploaded 2 Jan 2024Source
  • DocumentC30 Drawings 28-10-2024.pdf · uploaded 21 Nov 2024Source
  • Document1.pdf · uploaded 8 Sep 2026Source
  • Document2.pdf · uploaded 8 Sep 2026Source
  • Document3.pdf · uploaded 8 Sep 2026Source
  • Document4.pdf · uploaded 8 Sep 2026Source
  • Document5.pdf · uploaded 8 Sep 2026Source
  • Document6.pdf · uploaded 8 Sep 2026Source
  • Document7.pdf · uploaded 8 Sep 2026Source
  • Document8.pdf · uploaded 8 Sep 2026Source

Technical (Architect)

  • DocumentFORM 1 28-06-2024.pdf · uploaded 22 Nov 2024Source
  • DocumentFORM 1 30-09-2024.pdf · uploaded 22 Nov 2024Source
  • DocumentFORM 1.pdf · uploaded 16 Jan 2025Source
  • DocumentARCHITECT CERTIFICATE - 31-03-2025.pdf · uploaded 17 May 2025Source
  • DocumentForm 1 Q226.pdf · uploaded 10 Oct 2026Source

Technical (Engineer)

  • DocumentFORM 2 30-06-2024.pdf · uploaded 23 Nov 2024Source
  • DocumentFORM 2 30-09-2024.pdf · uploaded 23 Nov 2024Source
  • DocumentFORM 2.pdf · uploaded 16 Jan 2025Source
  • DocumentENGINEER'S CERTIFICATE- 31-03-2025.pdf · uploaded 17 May 2025Source
  • DocumentForm 2 Q226.pdf · uploaded 10 Oct 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Thane (M Corp.), Thane taluka

Survey, CTS, gat or plot numbers

PLOT NO C 30

Boundaries

North
Plot No A77 A78 A79
South
Plot No C 31
East
Pipe Line
West
Road No 16

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectApices Studio Pvt Ltd—
ArchitectSudhir Thorat—
Chartered accountantAmit Kumar Biyani—
Chartered accountantNeha Amit & Assocaites—
Chartered accountantNeha Amit Biyani—
Chartered accountantNiyati Arora—
EngineerAjay Mahale—
EngineerAjay Mahale & Associates—
EngineerAman Merchant—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology