IDBLD_01187415 floorsCompleted
15Sanctioned habitable floorsregistration certificate
30 Dec 2023Promised completion
Floors
15 sanctioned habitable floors, as registered. MahaRERA doesn't publish flat-by-flat records, so floors are shown without flats.
As registered
- Sanctioned habitable floors
- 15
Unit inventory
Apartments and other units by type, from MahaRERA's project page.
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1 BHK | 31.3 m² (337 sq.ft) | 14 | not published |
| 2 BHK | 46.9 m² (505 sq.ft) | 13 | not published |
| 2 BHK | 47.3 m² (509 sq.ft) | 1 | not published |
| 2 BHK | 52.2 m² (561 sq.ft) | 13 | not published |
| 2 BHK | 52.6 m² (566 sq.ft) | 13 | not published |
| 2 BHK | 52.7 m² (567 sq.ft) | 1 | not published |
| 2 BHK | 53 m² (570 sq.ft) | 1 | not published |
| SHOP | 11.5 m² (124 sq.ft) | 1 | not published |
| SHOP | 16.3 m² (176 sq.ft) | 2 | not published |
| SHOP | 17.6 m² (190 sq.ft) | 1 | not published |
Show all 14 unit typesShow fewer unit types
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| SHOP | 18.2 m² (196 sq.ft) | 1 | not published |
| SHOP | 19.1 m² (206 sq.ft) | 1 | not published |
| SHOP | 19.5 m² (210 sq.ft) | 3 | not published |
| SHOP | 28.8 m² (310 sq.ft) | 1 | not published |
| Total | 66 |
Parking
Spaces as declared on MahaRERA's project page.
| Type | Two-wheeler | Four-wheeler | Visitor | Total |
|---|---|---|---|---|
| Closed/Covered | 0 | 0 | 0 | 0 |
| Open Space | 0 | 0 | 0 | 0 |
Construction progress
Work completed on this building, as the promoter reported it to MahaRERA (Form 1).
- Excavation100%
- Basement (if any)100%
- Podiums (if any)0%
- Plinth100%
- Stilt Floor100%
- Slabs of Super Structure100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
- Sanitary Fittings within the flats / premises100%
Show all 11 activitiesShow fewer activities
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Data through11 Oct 2026SourcesMahaRERA registration certificate · MahaRERA project pageFloors and units are as registered; a promoter can revise them in later filings.Methodology