Om Residency A Wing · Om Residency
Thane (M Corp.) · RERA P51700008682
IDBLD_0117759 floorsCompleted
9Sanctioned habitable floorsregistration certificate
29 Dec 2020Revised completionpromised 30 Jun 2019
Floors
9 sanctioned habitable floors, as registered. MahaRERA doesn't publish flat-by-flat records, so floors are shown without flats.
As registered
- RERA registration
- P51700008682 · registered 19 Aug 2017
- Promised completion
- 30 Jun 2019
- Revised completion
- 29 Dec 2020
- Sanctioned habitable floors
- 9
Unit inventory
Apartments and other units by type, from MahaRERA's project page.
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1BHK | 30.1 m² (324 sq.ft) | 6 | not published |
| 1BHK | 31.1 m² (335 sq.ft) | 14 | not published |
| 1BHK | 33.9 m² (365 sq.ft) | 6 | not published |
| 1BHK | 34.7 m² (374 sq.ft) | 6 | not published |
| 1BHK | 40.3 m² (434 sq.ft) | 6 | not published |
| 2BHK | 47.6 m² (513 sq.ft) | 6 | not published |
| SHOP1 | 70.2 m² (756 sq.ft) | 1 | not published |
| SHOP10 | 18.7 m² (201 sq.ft) | 1 | not published |
| SHOP11 | 20.9 m² (225 sq.ft) | 1 | not published |
| SHOP12 | 14.9 m² (160 sq.ft) | 1 | not published |
Show all 19 unit typesShow fewer unit types
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| SHOP13 | 14.4 m² (155 sq.ft) | 1 | not published |
| SHOP2 | 163 m² (1,754 sq.ft) | 1 | not published |
| SHOP3 | 23.8 m² (256 sq.ft) | 1 | not published |
| SHOP4 | 24.4 m² (263 sq.ft) | 1 | not published |
| SHOP5 | 168.6 m² (1,814 sq.ft) | 1 | not published |
| SHOP6 | 18.7 m² (201 sq.ft) | 1 | not published |
| SHOP7 | 19.6 m² (211 sq.ft) | 1 | not published |
| SHOP8 | 19 m² (205 sq.ft) | 1 | not published |
| SHOP9 | 14.3 m² (154 sq.ft) | 1 | not published |
| Total | 57 |
Parking
Spaces as declared on MahaRERA's project page.
| Type | Two-wheeler | Four-wheeler | Visitor | Total |
|---|---|---|---|---|
| Closed/Covered | 0 | 0 | 0 | 2 |
| Open Space | 0 | 0 | 0 | 1 |
Construction progress
Work completed on this building, as the promoter reported it to MahaRERA (Form 1).
- Excavation100%
- Basement (if any)100%
- Podiums (if any)0%
- Plinth100%
- Stilt Floor60%
- Slabs of Super Structure100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
- Sanitary Fittings within the flats / premises50%
Show all 11 activitiesShow fewer activities
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%
Data through11 Oct 2026SourcesMahaRERA registration certificate · MahaRERA project pageFloors and units are as registered; a promoter can revise them in later filings.Methodology