Lodha Kolshet
Certificate SignedThane (M Corp.), Thane 400607 |Promoter: Macrotech Developers Limited
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- RERA registrations
- 2
- Phases
- 2
- Buildings
- 2
- Unit types
- 2BHK, 3BHK, 4BHK345 units in all
- Address
- 30/4, 32/1A, Kolshet Road, ThanePIN 400607
- Designated bank account
- 76
- Developed in phases
- No
Location
Coordinates as published by MahaRERA
Also registered as
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion promised for 30 Jun 2022
P51700015040The latest completion date on record passed 4 years and 4 months ago.
- Registered
- 22 Jan 2018
- Promised
- 30 Jun 2022
Completion promised for 30 Dec 2022
P51700015243The latest completion date on record passed 3 years and 10 months ago.
- Registered
- 8 Feb 2018
- Promised
- 30 Dec 2022
2 RERA registrations
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700015040 | 22 Jan 2018 | 30 Jun 2022 | 30 Jun 2022 | Macrotech Developers Limited | Project page |
| P51700015243 | 8 Feb 2018 | 30 Dec 2022 | 30 Dec 2022 | Macrotech Developers Limited | Project page |
2 buildings
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Belgrave Square | 9 | 174 |
| Tower J | 9 | 171 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
231 of 345 units booked (67%), as the promoter reported to MahaRERA
| RERA | Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|---|
| P51700015040 | Belgrave Square | 2BHK | 70.23 sq m · 756 sq ft | 7 | 7 |
| P51700015040 | Belgrave Square | 2BHK | 70.25 sq m · 756 sq ft | 9 | 0 |
| P51700015040 | Belgrave Square | 2BHK | 71.44 sq m · 769 sq ft | 7 | 7 |
| P51700015040 | Belgrave Square | 2BHK | 71.47 sq m · 769 sq ft | 9 | 0 |
| P51700015040 | Belgrave Square | 2BHK | 72.54 sq m · 781 sq ft | 7 | 0 |
| P51700015040 | Belgrave Square | 2BHK | 72.56 sq m · 781 sq ft | 2 | 2 |
| P51700015040 | Belgrave Square | 2BHK | 72.65 sq m · 782 sq ft | 6 | 5 |
| P51700015040 | Belgrave Square | 2BHK | 72.67 sq m · 782 sq ft | 2 | 0 |
Show all 41 unit rowsShow fewer unit rows
| RERA | Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|---|
| P51700015040 | Belgrave Square | 2BHK | 75.3 sq m · 811 sq ft | 13 | 0 |
| P51700015040 | Belgrave Square | 2BHK | 75.34 sq m · 811 sq ft | 19 | 19 |
| P51700015040 | Belgrave Square | 3BHK | 83.32 sq m · 897 sq ft | 1 | 0 |
| P51700015040 | Belgrave Square | 3BHK | 90.76 sq m · 977 sq ft | 11 | 0 |
| P51700015040 | Belgrave Square | 3BHK | 90.77 sq m · 977 sq ft | 6 | 6 |
| P51700015040 | Belgrave Square | 3BHK | 93.09 sq m · 1,002 sq ft | 15 | 3 |
| P51700015040 | Belgrave Square | 3BHK | 94.76 sq m · 1,020 sq ft | 1 | 1 |
| P51700015040 | Belgrave Square | 3BHK | 94.77 sq m · 1,020 sq ft | 1 | 0 |
| P51700015040 | Belgrave Square | 3BHK | 95.3 sq m · 1,026 sq ft | 11 | 0 |
| P51700015040 | Belgrave Square | 3BHK | 95.32 sq m · 1,026 sq ft | 10 | 10 |
| P51700015040 | Belgrave Square | 4BHK | 109.07 sq m · 1,174 sq ft | 9 | 9 |
| P51700015040 | Belgrave Square | 4BHK | 109.1 sq m · 1,174 sq ft | 15 | 0 |
| P51700015040 | Belgrave Square | 4BHK | 121.24 sq m · 1,305 sq ft | 2 | 2 |
| P51700015040 | Belgrave Square | 4BHK | 170.1 sq m · 1,831 sq ft | 1 | 1 |
| P51700015040 | Belgrave Square | 4BHK | 170.13 sq m · 1,831 sq ft | 2 | 0 |
| P51700015040 | Belgrave Square | 4BHK | 171.08 sq m · 1,841 sq ft | 4 | 0 |
| P51700015040 | Belgrave Square | 4BHK | 171.13 sq m · 1,842 sq ft | 4 | 4 |
| P51700015243 | Tower J | 2BHK | 70.23 sq m · 756 sq ft | 21 | 16 |
| P51700015243 | Tower J | 2BHK | 71.44 sq m · 769 sq ft | 17 | 15 |
| P51700015243 | Tower J | 2BHK | 72.56 sq m · 781 sq ft | 8 | 7 |
| P51700015243 | Tower J | 2BHK | 72.65 sq m · 782 sq ft | 8 | 8 |
| P51700015243 | Tower J | 2BHK | 75.25 sq m · 810 sq ft | 4 | 4 |
| P51700015243 | Tower J | 2BHK | 75.34 sq m · 811 sq ft | 27 | 26 |
| P51700015243 | Tower J | 3BHK | 83.33 sq m · 897 sq ft | 2 | 2 |
| P51700015243 | Tower J | 3BHK | 83.43 sq m · 898 sq ft | 1 | 1 |
| P51700015243 | Tower J | 3BHK | 90.77 sq m · 977 sq ft | 12 | 12 |
| P51700015243 | Tower J | 3BHK | 93.09 sq m · 1,002 sq ft | 16 | 14 |
| P51700015243 | Tower J | 3BHK | 94.76 sq m · 1,020 sq ft | 1 | 1 |
| P51700015243 | Tower J | 3BHK | 95.32 sq m · 1,026 sq ft | 14 | 14 |
| P51700015243 | Tower J | 4BHK | 109.07 sq m · 1,174 sq ft | 25 | 24 |
| P51700015243 | Tower J | 4BHK | 121.24 sq m · 1,305 sq ft | 2 | 2 |
| P51700015243 | Tower J | 4BHK | 170.1 sq m · 1,831 sq ft | 2 | 1 |
| P51700015243 | Tower J | 4BHK | 171.13 sq m · 1,842 sq ft | 11 | 8 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
2 documents held by Deedo, 143 filings listed on MahaRERA's project page
Registration certificate (2)
Finance
Legal
- Legal Title reportP51700015040 · Title Report Main 1.pdf · uploaded 11 Jan 2018Source
- Legal Title reportP51700015040 · Title Report Main 2.pdf · uploaded 11 Jan 2018Source
- Legal Title reportP51700015040 · Title Report Main 3.pdf · uploaded 11 Jan 2018Source
- Legal Title reportP51700015040 · Title Report Main 4.pdf · uploaded 11 Jan 2018Source
Show all 145 documentsShow fewer documents
Legal
- Legal Title reportP51700015040 · Second Supplemental Report on Title.pdf · uploaded 11 Jan 2018Source
- Legal Title reportP51700015040 · Clariant_Third Supplemental.pdf · uploaded 11 Jan 2018Source
- Legal Title reportP51700015243 · Title Report Main 1.pdf · uploaded 11 Jan 2018Source
- Legal Title reportP51700015243 · Title Report Main 2.pdf · uploaded 11 Jan 2018Source
- Legal Title reportP51700015243 · Title Report Main 3.pdf · uploaded 11 Jan 2018Source
- Legal Title reportP51700015243 · Title Report Main 4.pdf · uploaded 11 Jan 2018Source
- Legal Title reportP51700015243 · Second Supplemental Report on Title.pdf · uploaded 11 Jan 2018Source
- Legal Title reportP51700015243 · Clariant_Third Supplemental.pdf · uploaded 11 Jan 2018Source
- Declaration Form BP51700015040 · tower k form b.pdf · uploaded 12 Jan 2018Source
- Declaration Form BP51700015243 · tower J form b.pdf · uploaded 12 Jan 2018Source
- OtherP51700015040 · LDL to MDL.pdf · uploaded 28 May 2019Source
- OtherP51700015243 · LDL to MDL.pdf · uploaded 28 May 2019Source
- Legal Title reportP51700015040 · TR 26 April 2017 1st Supp.pdf · uploaded 27 Aug 2021Source
- Legal Title reportP51700015040 · Title Report 4th to 7th Supp.pdf · uploaded 27 Aug 2021Source
- Legal Title reportP51700015243 · TR 26 April 2017 1st Supp.pdf · uploaded 27 Aug 2021Source
- Legal Title reportP51700015243 · Title Report 4th to 7th Supp.pdf · uploaded 27 Aug 2021Source
Migrated
- 1 PAN CardP51700015040 · LODHA DEVELOPERS THANE PVT LTD PAN CARD.pdf · uploaded 11 Jan 2018Source
- 1 Copy of the legal title reportP51700015040 · Title Report Main 1.pdf · uploaded 11 Jan 2018Source
- 2 Copy of the legal title reportP51700015040 · Title Report Main 2.pdf · uploaded 11 Jan 2018Source
- 3 Copy of the legal title reportP51700015040 · Title Report Main 3.pdf · uploaded 11 Jan 2018Source
- 4 Copy of the legal title reportP51700015040 · Title Report Main 4.pdf · uploaded 11 Jan 2018Source
- 5 Copy of the legal title reportP51700015040 · Second Supplemental Report on Title.pdf · uploaded 11 Jan 2018Source
- 6 Copy of the legal title reportP51700015040 · Clariant_Third Supplemental.pdf · uploaded 11 Jan 2018Source
- 1 Proforma of Allotment letterP51700015040 · Allotment Letter and ATS.pdf · uploaded 11 Jan 2018Source
- 1 PAN CardP51700015243 · LODHA DEVELOPERS THANE PVT LTD PAN CARD.pdf · uploaded 11 Jan 2018Source
- 1 Copy of the legal title reportP51700015243 · Title Report Main 1.pdf · uploaded 11 Jan 2018Source
- 2 Copy of the legal title reportP51700015243 · Title Report Main 2.pdf · uploaded 11 Jan 2018Source
- 3 Copy of the legal title reportP51700015243 · Title Report Main 3.pdf · uploaded 11 Jan 2018Source
- 4 Copy of the legal title reportP51700015243 · Title Report Main 4.pdf · uploaded 11 Jan 2018Source
- 5 Copy of the legal title reportP51700015243 · Second Supplemental Report on Title.pdf · uploaded 11 Jan 2018Source
- 6 Copy of the legal title reportP51700015243 · Clariant_Third Supplemental.pdf · uploaded 11 Jan 2018Source
- 1 Proforma of Allotment letterP51700015243 · Allotment Letter and ATS.pdf · uploaded 11 Jan 2018Source
- 1 Details of encumbrancesP51700015040 · tower k encum.pdf · uploaded 12 Jan 2018Source
- 1 Building Plan Approval (IOD)P51700015040 · K 1.pdf · uploaded 12 Jan 2018Source
- 2 Building Plan Approval (IOD)P51700015040 · K 2.pdf · uploaded 12 Jan 2018Source
- 3 Building Plan Approval (IOD)P51700015040 · K 3.pdf · uploaded 12 Jan 2018Source
- 4 Building Plan Approval (IOD)P51700015040 · K 4.pdf · uploaded 12 Jan 2018Source
- 5 Building Plan Approval (IOD)P51700015040 · K 5.pdf · uploaded 12 Jan 2018Source
- 6 Building Plan Approval (IOD)P51700015040 · K 6.pdf · uploaded 12 Jan 2018Source
- 7 Building Plan Approval (IOD)P51700015040 · 1.pdf · uploaded 12 Jan 2018Source
- 8 Building Plan Approval (IOD)P51700015040 · 2.pdf · uploaded 12 Jan 2018Source
- 9 Building Plan Approval (IOD)P51700015040 · 3.pdf · uploaded 12 Jan 2018Source
- 10 Building Plan Approval (IOD)P51700015040 · 4.pdf · uploaded 12 Jan 2018Source
- 11 Building Plan Approval (IOD)P51700015040 · 5.pdf · uploaded 12 Jan 2018Source
- 12 Building Plan Approval (IOD)P51700015040 · 6.pdf · uploaded 12 Jan 2018Source
- 13 Building Plan Approval (IOD)P51700015040 · WING K FOR APPROVAL-7.pdf · uploaded 12 Jan 2018Source
- 1 Declaration in FORM BP51700015040 · tower k form b.pdf · uploaded 12 Jan 2018Source
- 1 Certificates of CA (Form 3)P51700015040 · Tower K.pdf · uploaded 12 Jan 2018Source
- 1 Details of encumbrancesP51700015243 · tower j encum.pdf · uploaded 12 Jan 2018Source
- 1 Building Plan Approval (IOD)P51700015243 · J 1.pdf · uploaded 12 Jan 2018Source
- 2 Building Plan Approval (IOD)P51700015243 · J 2.pdf · uploaded 12 Jan 2018Source
- 3 Building Plan Approval (IOD)P51700015243 · J 3.pdf · uploaded 12 Jan 2018Source
- 4 Building Plan Approval (IOD)P51700015243 · J 4.pdf · uploaded 12 Jan 2018Source
- 5 Building Plan Approval (IOD)P51700015243 · J 5.pdf · uploaded 12 Jan 2018Source
- 6 Building Plan Approval (IOD)P51700015243 · J 6.pdf · uploaded 12 Jan 2018Source
- 7 Building Plan Approval (IOD)P51700015243 · WING -J FOR APPROVAL - 1.pdf · uploaded 12 Jan 2018Source
- 8 Building Plan Approval (IOD)P51700015243 · WING -J FOR APPROVAL - 3.pdf · uploaded 12 Jan 2018Source
- 9 Building Plan Approval (IOD)P51700015243 · WING -J FOR APPROVAL - 4.pdf · uploaded 12 Jan 2018Source
- 10 Building Plan Approval (IOD)P51700015243 · WING -J FOR APPROVAL - 5.pdf · uploaded 12 Jan 2018Source
- 11 Building Plan Approval (IOD)P51700015243 · WING -J FOR APPROVAL - 6.pdf · uploaded 12 Jan 2018Source
- 12 Building Plan Approval (IOD)P51700015243 · WING -J FOR APPROVAL - 7.pdf · uploaded 12 Jan 2018Source
- 1 Declaration in FORM BP51700015243 · tower J form b.pdf · uploaded 12 Jan 2018Source
- 1 Certificates of CA (Form 3)P51700015243 · Tower J.pdf · uploaded 12 Jan 2018Source
- 1 Copy of Layout Approval (in case of layout)P51700015040 · Layout Plan K.pdf · uploaded 14 Jan 2018Source
- 1 Copy of Layout Approval (in case of layout)P51700015243 · Layout Plan J.pdf · uploaded 14 Jan 2018Source
- 1 Commencement Certificates / NA Order for plotted developmentP51700015040 · CC1.pdf · uploaded 15 Jan 2018Source
- 2 Commencement Certificates / NA Order for plotted developmentP51700015040 · CC2.pdf · uploaded 15 Jan 2018Source
- 3 Commencement Certificates / NA Order for plotted developmentP51700015040 · CC3.pdf · uploaded 15 Jan 2018Source
- 1 Commencement Certificates / NA Order for plotted developmentP51700015243 · CC1.pdf · uploaded 25 Jan 2018Source
- 2 Commencement Certificates / NA Order for plotted developmentP51700015243 · CC2.pdf · uploaded 25 Jan 2018Source
- 3 Commencement Certificates / NA Order for plotted developmentP51700015243 · CC3.pdf · uploaded 25 Jan 2018Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P51700015040 · LODHA KOLSHET PLOT A TOWER K.pdf · uploaded 9 Jul 2018Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P51700015040 · LODHA KOLESHET PLOT A TOWER K.pdf · uploaded 9 Jul 2018Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P51700015243 · LODHA KOLSHET PLOT A TOWER J.pdf · uploaded 9 Jul 2018Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P51700015243 · LODHA KOLESHET PLOT A TOWER J.pdf · uploaded 9 Jul 2018Source
- 2 Details of encumbrancesP51700015040 · Clariant Plot A Tower K.pdf · uploaded 13 Aug 2018Source
- 2 Details of encumbrancesP51700015243 · Clariant Plot A Tower J.pdf · uploaded 13 Aug 2018Source
- 1 Certificates of CA (Form 5)P51700015040 · LODHA KOLSHET TOWER K.pdf · uploaded 1 Oct 2018Source
- 1 Certificates of CA (Form 5)P51700015243 · LODHA KOLSHET TOWER J.pdf · uploaded 1 Oct 2018Source
- 3 Details of encumbrancesP51700015040 · Lodha Kolshet - Tower K.pdf · uploaded 29 Oct 2018Source
- 3 Details of encumbrancesP51700015243 · Lodha Kolshet - Tower J.pdf · uploaded 29 Oct 2018Source
- 1 Certificates of Architect (Form 4)P51700015040 · Lodha Kolshet Tower K.pdf · uploaded 13 Dec 2018Source
- 4 Details of encumbrancesP51700015040 · LODHA KOLSHET TOWER K.pdf · uploaded 25 Feb 2019Source
- 4 Details of encumbrancesP51700015243 · LODHA KOLSHET TOWER J.pdf · uploaded 25 Feb 2019Source
- 1 OtherP51700015040 · LDL to MDL.pdf · uploaded 28 May 2019Source
- 1 OtherP51700015243 · LDL to MDL.pdf · uploaded 28 May 2019Source
- 1 Certificates of Architect (Form 4)P51700015243 · STERLING TOWER J.pdf · uploaded 13 Jun 2019Source
- 1 Form 2AP51700015040 · Sterling K.pdf · uploaded 17 Jun 2019Source
- 1 Form 2AP51700015243 · Sterling J.pdf · uploaded 17 Jun 2019Source
- 2 Certificates of CA (Form 5)P51700015040 · Lodha Kolshet Plot A Tower K.pdf · uploaded 30 Sep 2019Source
- 3 Certificates of CA (Form 5)P51700015040 · Lodha Kolshet Plot A Tower K.pdf · uploaded 30 Sep 2019Source
- 2 Certificates of CA (Form 5)P51700015243 · Lodha Kolshet Plot A Twr J.pdf · uploaded 30 Sep 2019Source
- 2 Form 2AP51700015040 · Lodha Kolshet Plot A Tower k.pdf · uploaded 3 Sep 2020Source
- 2 Form 2AP51700015243 · Lodha Kolshet Plot A Tower J.pdf · uploaded 3 Sep 2020Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)P51700015243 · 110 Lodha Kolshe Plot A Tower J.pdf · uploaded 27 Oct 2020Source
- 7 Copy of the legal title reportP51700015040 · TR 26 April 2017 1st Supp.pdf · uploaded 27 Aug 2021Source
- 8 Copy of the legal title reportP51700015040 · Title Report 4th to 7th Supp.pdf · uploaded 27 Aug 2021Source
- 7 Copy of the legal title reportP51700015243 · TR 26 April 2017 1st Supp.pdf · uploaded 27 Aug 2021Source
- 8 Copy of the legal title reportP51700015243 · Title Report 4th to 7th Supp.pdf · uploaded 27 Aug 2021Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP51700015040 · Kolshet Tower K.pdf · uploaded 19 Nov 2021Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP51700015243 · Kolshet Tower J.pdf · uploaded 19 Nov 2021Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)P51700015040 · Society Certificate-Belgrave Square Eaton Square.pdf · uploaded 13 Jan 2023Source
- 1 Disclosure of sold/ booked inventoryP51700015040 · LODHA KOLSHET - PLOT A - TOWER K - P51700015040 - Sep23.pdf · uploaded 11 Dec 2023Source
- 1 Disclosure of sold/ booked inventoryP51700015243 · LODHA KOLSHET - PLOT A - TOWER J - P51700015243 - Sep23.pdf · uploaded 11 Dec 2023Source
- 2 Disclosure of sold/ booked inventoryP51700015040 · Sold Unsold - LODHA KOLSHET - PLOT A - TOWER K - P51700015040 - March 24.pdf · uploaded 28 May 2024Source
- 2 Disclosure of sold/ booked inventoryP51700015243 · Sold Unsold - LODHA KOLSHET - PLOT A - TOWER J - P51700015243 - March 24.pdf · uploaded 28 May 2024Source
Technical
- DocumentP51700015040 · K 1.pdf · uploaded 12 Jan 2018Source
- DocumentP51700015040 · K 2.pdf · uploaded 12 Jan 2018Source
- DocumentP51700015040 · K 3.pdf · uploaded 12 Jan 2018Source
- DocumentP51700015040 · K 4.pdf · uploaded 12 Jan 2018Source
- DocumentP51700015040 · K 5.pdf · uploaded 12 Jan 2018Source
- DocumentP51700015040 · K 6.pdf · uploaded 12 Jan 2018Source
- DocumentP51700015040 · 1.pdf · uploaded 12 Jan 2018Source
- DocumentP51700015040 · 2.pdf · uploaded 12 Jan 2018Source
- DocumentP51700015040 · 3.pdf · uploaded 12 Jan 2018Source
- DocumentP51700015040 · 4.pdf · uploaded 12 Jan 2018Source
- DocumentP51700015040 · 5.pdf · uploaded 12 Jan 2018Source
- DocumentP51700015040 · 6.pdf · uploaded 12 Jan 2018Source
- DocumentP51700015040 · WING K FOR APPROVAL-7.pdf · uploaded 12 Jan 2018Source
- DocumentP51700015243 · WING -J FOR APPROVAL - 1.pdf · uploaded 12 Jan 2018Source
- DocumentP51700015243 · WING -J FOR APPROVAL - 3.pdf · uploaded 12 Jan 2018Source
- DocumentP51700015243 · WING -J FOR APPROVAL - 4.pdf · uploaded 12 Jan 2018Source
- DocumentP51700015243 · WING -J FOR APPROVAL - 5.pdf · uploaded 12 Jan 2018Source
- DocumentP51700015243 · WING -J FOR APPROVAL - 6.pdf · uploaded 12 Jan 2018Source
- DocumentP51700015243 · WING -J FOR APPROVAL - 7.pdf · uploaded 12 Jan 2018Source
- DocumentP51700015243 · J 1.pdf · uploaded 12 Jan 2018Source
- DocumentP51700015243 · J 2.pdf · uploaded 12 Jan 2018Source
- DocumentP51700015243 · J 3.pdf · uploaded 12 Jan 2018Source
- DocumentP51700015243 · J 4.pdf · uploaded 12 Jan 2018Source
- DocumentP51700015243 · J 5.pdf · uploaded 12 Jan 2018Source
- DocumentP51700015243 · J 6.pdf · uploaded 12 Jan 2018Source
- DocumentP51700015040 · Layout Plan K.pdf · uploaded 14 Jan 2018Source
- DocumentP51700015243 · Layout Plan J.pdf · uploaded 14 Jan 2018Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Thane (M Corp.), Thane taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Fitness Centre
- South
- 30M wide HCMTR
- East
- 40M wide Kolshet Road
- West
- Wing J
Source: registration certificates and MahaRERA's project page, as stated there.