Building A1 · Laabh Neelkanth

Thane (M Corp.) · RERA P51700010195

IDBLD_0119129 floorsCompleted
9Sanctioned habitable floorsregistration certificate
31 Dec 2019Promised completion

Floors

9 sanctioned habitable floors, as registered. MahaRERA doesn't publish flat-by-flat records, so floors are shown without flats.

As registered

RERA registration
P51700010195 · registered 24 Aug 2017
Promised completion
31 Dec 2019
Sanctioned habitable floors
9

Registered transactions

No registered transactions placed in this tower yetDeeds land here when they name this tower; the project page lists the rest.

Unit inventory

Apartments and other units by type, from MahaRERA's project page.

TypeCarpet areaUnitsBooked
TYPE 132.5 m² (350 sq.ft)1not published
TYPE 1022.8 m² (246 sq.ft)1not published
TYPE 1112.4 m² (134 sq.ft)1not published
TYPE 1213.9 m² (149 sq.ft)1not published
TYPE 1316.2 m² (174 sq.ft)2not published
TYPE 331.7 m² (341 sq.ft)1not published
TYPE 429.1 m² (313 sq.ft)3not published
TYPE 535.1 m² (378 sq.ft)1not published
TYPE 626.9 m² (290 sq.ft)3not published
TYPE 716.2 m² (174 sq.ft)1not published
TYPE 816.2 m² (174 sq.ft)1not published
TYPE 925.2 m² (271 sq.ft)1not published
Total17

Parking

Spaces as declared on MahaRERA's project page.

TypeTwo-wheelerFour-wheelerVisitorTotal
Closed/Covered0001
Open Space0000

Construction progress

Work completed on this building, as the promoter reported it to MahaRERA (Form 1).

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor95%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
  • Sanitary Fittings within the flats / premises95%
Show all 11 activitiesShow fewer activities
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
Data through11 Oct 2026SourcesMahaRERA registration certificate · MahaRERA project pageFloors and units are as registered; a promoter can revise them in later filings.Methodology