Building A1 · Laabh Neelkanth
Thane (M Corp.) · RERA P51700010195
IDBLD_0119129 floorsCompleted
9Sanctioned habitable floorsregistration certificate
31 Dec 2019Promised completion
Floors
9 sanctioned habitable floors, as registered. MahaRERA doesn't publish flat-by-flat records, so floors are shown without flats.
As registered
- Sanctioned habitable floors
- 9
Registered transactions
No registered transactions placed in this tower yetDeeds land here when they name this tower; the project page lists the rest.
Unit inventory
Apartments and other units by type, from MahaRERA's project page.
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| TYPE 1 | 32.5 m² (350 sq.ft) | 1 | not published |
| TYPE 10 | 22.8 m² (246 sq.ft) | 1 | not published |
| TYPE 11 | 12.4 m² (134 sq.ft) | 1 | not published |
| TYPE 12 | 13.9 m² (149 sq.ft) | 1 | not published |
| TYPE 13 | 16.2 m² (174 sq.ft) | 2 | not published |
| TYPE 3 | 31.7 m² (341 sq.ft) | 1 | not published |
| TYPE 4 | 29.1 m² (313 sq.ft) | 3 | not published |
| TYPE 5 | 35.1 m² (378 sq.ft) | 1 | not published |
| TYPE 6 | 26.9 m² (290 sq.ft) | 3 | not published |
| TYPE 7 | 16.2 m² (174 sq.ft) | 1 | not published |
| TYPE 8 | 16.2 m² (174 sq.ft) | 1 | not published |
| TYPE 9 | 25.2 m² (271 sq.ft) | 1 | not published |
| Total | 17 |
Parking
Spaces as declared on MahaRERA's project page.
| Type | Two-wheeler | Four-wheeler | Visitor | Total |
|---|---|---|---|---|
| Closed/Covered | 0 | 0 | 0 | 1 |
| Open Space | 0 | 0 | 0 | 0 |
Construction progress
Work completed on this building, as the promoter reported it to MahaRERA (Form 1).
- Excavation100%
- Basement (if any)100%
- Podiums (if any)0%
- Plinth100%
- Stilt Floor95%
- Slabs of Super Structure100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
- Sanitary Fittings within the flats / premises95%
Show all 11 activitiesShow fewer activities
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
Data through11 Oct 2026SourcesMahaRERA registration certificate · MahaRERA project pageFloors and units are as registered; a promoter can revise them in later filings.Methodology