Centurion
Certificate SignedThane (M Corp.), Thane 400604 |Promoter: Shree Anant Enterprises
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Commercial
- Status on MahaRERA
- Certificate Signed
- Buildings
- 1
- Unit types
- Office space108 units in all
- Address
- A-85, A-84, S G Barve marg, wagle estatePIN 400604
- Designated bank account
- 82
- Developed in phases
- No
Location
Coordinates as published by MahaRERA
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion promised for 31 Dec 2026
- Registered
- 21 Apr 2023
- Promised
- 31 Dec 2026
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700050614 | 21 Apr 2023 | 31 Dec 2026 | 31 Dec 2026 | Shree Anant Enterprises | Project page |
1 building
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Centurion - Building A | 11 | 108 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
11 of 108 units booked (10%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Office space | 41.32 sq m · 445 sq ft | 1 | 1 |
| Office space | 44.2 sq m · 476 sq ft | 1 | 1 |
| Office space | 48.62 sq m · 523 sq ft | 1 | 1 |
| Office space | 49.73 sq m · 535 sq ft | 5 | 0 |
| Office space | 52.52 sq m · 565 sq ft | 4 | 0 |
| Office space | 52.94 sq m · 570 sq ft | 1 | 1 |
| Office space | 59.02 sq m · 635 sq ft | 1 | 1 |
| Office space | 59.23 sq m · 638 sq ft | 4 | 0 |
Show all 35 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Office space | 59.46 sq m · 640 sq ft | 1 | 1 |
| Office space | 60.11 sq m · 647 sq ft | 1 | 1 |
| Office space | 61.83 sq m · 666 sq ft | 5 | 0 |
| Office space | 62.19 sq m · 669 sq ft | 6 | 0 |
| Office space | 62.46 sq m · 672 sq ft | 5 | 0 |
| Office space | 64.86 sq m · 698 sq ft | 5 | 0 |
| Office space | 66.19 sq m · 712 sq ft | 13 | 0 |
| Office space | 66.85 sq m · 720 sq ft | 5 | 0 |
| Office space | 66.97 sq m · 721 sq ft | 5 | 0 |
| Office space | 67.79 sq m · 730 sq ft | 1 | 1 |
| Office space | 68.46 sq m · 737 sq ft | 4 | 0 |
| Office space | 68.96 sq m · 742 sq ft | 1 | 1 |
| Office space | 70.86 sq m · 763 sq ft | 4 | 0 |
| Office space | 72.85 sq m · 784 sq ft | 4 | 0 |
| Office space | 72.97 sq m · 785 sq ft | 4 | 0 |
| Office space | 75.17 sq m · 809 sq ft | 1 | 1 |
| Office space | 76.42 sq m · 823 sq ft | 1 | 0 |
| Office space | 78.94 sq m · 850 sq ft | 1 | 0 |
| Office space | 79.06 sq m · 851 sq ft | 1 | 0 |
| Office space | 79.22 sq m · 853 sq ft | 1 | 0 |
| Office space | 98.49 sq m · 1,060 sq ft | 5 | 0 |
| Office space | 99.74 sq m · 1,074 sq ft | 5 | 0 |
| Office space | 101.72 sq m · 1,095 sq ft | 1 | 1 |
| Office space | 104.49 sq m · 1,125 sq ft | 4 | 0 |
| Office space | 105.74 sq m · 1,138 sq ft | 4 | 0 |
| Office space | 112.58 sq m · 1,212 sq ft | 1 | 0 |
| Office space | 113.96 sq m · 1,227 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
1 document held by Deedo, 126 filings listed on MahaRERA's project page
Finance
- PAN CardPAN Card.pdf · uploaded 22 Feb 2023Source
Legal
Migrated
- 1 Commencement Certificates / NA Order for plotted developmentApproval Letter-1-6.pdf · uploaded 17 Feb 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)acrh certi reduce (1).pdf · uploaded 17 Feb 2023Source
- 1 PAN CardPAN Card.pdf · uploaded 22 Feb 2023Source
- 1 CERSAI detailsCERSAI_Search_Report_200260700856_For_Asset_Based_Search_A-84.pdf · uploaded 22 Feb 2023Source
Show all 127 documentsShow fewer documents
Migrated
- 2 CERSAI detailsCERSAI_Search_Report_200260701546_For_Asset_Based_Search_A-85.pdf · uploaded 22 Feb 2023Source
- 1 Declaration about Commencement CertificateDECLARATION ABOUT CC.pdf · uploaded 27 Feb 2023Source
- 1 Declaration in FORM BFormB.pdf · uploaded 27 Feb 2023Source
- 1 a Details of encumbrances concerned to FinanceNO ENCUMBERANCE CERTIFICATE TO LEGAL.pdf · uploaded 3 Mar 2023Source
- 1 b Details of encumbrances concerned to LegalNO ENCUMBERANCE CERTIFICATE TO LEGAL.pdf · uploaded 3 Mar 2023Source
- 1 Copy of Layout Approval (in case of layout)Layout Plan_compressed (1).pdf · uploaded 3 Mar 2023Source
- 1 Building Plan Approval / NA Order for plotted developmentBuilding Plan Approval.pdf · uploaded 3 Mar 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)TAS ENGINEERING ENGINEER CERTIFICATE.pdf · uploaded 3 Mar 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure_of_Interest_in_Other_Real_Estate_Organizations.pdf · uploaded 4 Mar 2023Source
- 1 Proforma of Agreement for saleFinal Draft RERA Agreement.pdf · uploaded 11 Mar 2023Source
- 1 Deviation Report with respect to model copy of AgreementFinal Deviation Report Agreement.pdf · uploaded 11 Mar 2023Source
- 1 Copy of the legal title reportTitle_compressed.pdf · uploaded 23 Mar 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration about Separate Bank Account.pdf · uploaded 24 Mar 2023Source
- 1 Proforma of Allotment letterAllotment Letter Final.pdf · uploaded 31 Mar 2023Source
- 1 Deviation Report with respect to Allotment letterDeviation Report with respect to Nlotment letter_Tas.pdf · uploaded 31 Mar 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)085.pdf · uploaded 4 Apr 2023Source
- 2 Commencement Certificates / NA Order for plotted developmentPLAN APPROVAL LETTER.pdf · uploaded 19 Jan 2024Source
- 2 Copy of Layout Approval (in case of layout)LAYOUT DRAWING_New_compressed.pdf · uploaded 5 Feb 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect certificate_compressed.pdf · uploaded 21 Feb 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER CERTIFICATE JUNE 23.pdf · uploaded 21 Feb 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER CERTIFICATE DEC 23.pdf · uploaded 21 Feb 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA certi_compressed.pdf · uploaded 21 Feb 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)BW CA CERTI JUNE 23_compressed.pdf · uploaded 21 Feb 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)eng RERA sep 23.pdf · uploaded 18 Mar 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A - December 2023.pdf · uploaded 18 Mar 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A - September 2023.pdf · uploaded 18 Mar 2024Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A - June 2023.pdf · uploaded 18 Mar 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Shree Anant CA sep 2023.pdf · uploaded 18 Mar 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCH CERTIFICATE 02_compressed.pdf · uploaded 20 Mar 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1-Architect Cert JAN 2023.pdf · uploaded 3 Apr 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1-Architect Cert JUNE 2023.pdf · uploaded 3 Apr 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1-Architect Cert-SEP 2023.pdf · uploaded 3 Apr 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form1-Architect Cert-DEC 2023.pdf · uploaded 3 Apr 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2-Engg Cert-Tech-Line JAN 2023.pdf · uploaded 3 Apr 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2-Engg Cert-Tech-Line JUNE 2023.pdf · uploaded 3 Apr 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2-Engg Cert-Tech-Line SEP 2023.pdf · uploaded 3 Apr 2024Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engg Cert-Tech-Line DEC 2023.pdf · uploaded 3 Apr 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3-CA Certificate-MARCH 2023.pdf · uploaded 3 Apr 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3-CA Certificate-JUNE 2023.pdf · uploaded 3 Apr 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3-CA Certificate-SEPTEMBER 2023.pdf · uploaded 3 Apr 2024Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3-CA Certificate-DECEMBER 2023.pdf · uploaded 3 Apr 2024Source
- 2 Declaration about Commencement Certificatedeclaration about commencement certificate.pdf · uploaded 8 Apr 2024Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2A - Dec 2023.pdf · uploaded 8 Apr 2024Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A - March 2023.pdf · uploaded 8 Apr 2024Source
- 5 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A - June 2023.pdf · uploaded 8 Apr 2024Source
- 6 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A - March 2024.pdf · uploaded 8 Apr 2024Source
- 3 CERSAI detailscersai letter.pdf · uploaded 8 Apr 2024Source
- 3 Copy of Layout Approval (in case of layout)APPROVED DRAWINGS Latest (1)_1-1_compressed.pdf · uploaded 10 Apr 2024Source
- 2 Building Plan Approval / NA Order for plotted developmentAPPROVED DRAWINGS Latest (1)_2-2.pdf · uploaded 10 Apr 2024Source
- 3 Building Plan Approval / NA Order for plotted developmentAPPROVED DRAWINGS Latest (1)_3-3.pdf · uploaded 10 Apr 2024Source
- 4 Building Plan Approval / NA Order for plotted developmentAPPROVED DRAWINGS Latest (1)_4-4.pdf · uploaded 10 Apr 2024Source
- 5 Building Plan Approval / NA Order for plotted developmentAPPROVED DRAWINGS Latest (1)_5-5.pdf · uploaded 10 Apr 2024Source
- 6 Building Plan Approval / NA Order for plotted developmentAPPROVED DRAWINGS Latest (1)_6-6.pdf · uploaded 10 Apr 2024Source
- 7 Building Plan Approval / NA Order for plotted developmentAPPROVED DRAWINGS Latest (1)_7-7.pdf · uploaded 10 Apr 2024Source
- 8 Building Plan Approval / NA Order for plotted developmentAPPROVED DRAWINGS Latest (1)_8-8.pdf · uploaded 10 Apr 2024Source
- 9 Building Plan Approval / NA Order for plotted developmentAPPROVED DRAWINGS Latest (1)_9-9.pdf · uploaded 10 Apr 2024Source
- 10 Building Plan Approval / NA Order for plotted developmentAPPROVED DRAWINGS Latest (1)_10-10.pdf · uploaded 10 Apr 2024Source
- 11 Building Plan Approval / NA Order for plotted developmentAPPROVED DRAWINGS Latest (1)_11-11.pdf · uploaded 10 Apr 2024Source
- 12 Building Plan Approval / NA Order for plotted developmentAPPROVED DRAWINGS Latest (1)_12-12.pdf · uploaded 10 Apr 2024Source
- 13 Building Plan Approval / NA Order for plotted developmentAPPROVED DRAWINGS Latest (1)_13-13.pdf · uploaded 10 Apr 2024Source
- 14 Building Plan Approval / NA Order for plotted developmentAPPROVED DRAWINGS Latest (1)_14-end.pdf · uploaded 10 Apr 2024Source
- 1 Disclosure of sold/ booked inventoryDECLARATION ABOUT CC.pdf · uploaded 12 Apr 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentp1.pdf · uploaded 10 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentp1_compressed-2.pdf · uploaded 10 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentp1_compressed-3.pdf · uploaded 10 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentp1_compressed-4.pdf · uploaded 10 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentp1_compressed-5.pdf · uploaded 10 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentp1.pdf · uploaded 10 Oct 2024Source
- 2 Building Plan Approval / NA Order for plotted developmentp1_compressed-2.pdf · uploaded 10 Oct 2024Source
- 3 Building Plan Approval / NA Order for plotted developmentp1_compressed-3.pdf · uploaded 10 Oct 2024Source
- 4 Building Plan Approval / NA Order for plotted developmentp1_compressed-4.pdf · uploaded 10 Oct 2024Source
- 5 Building Plan Approval / NA Order for plotted developmentp1_compressed-5.pdf · uploaded 10 Oct 2024Source
- Withdrawal Update Form 1Form1-Architect Cert-DEC 2023.pdf · uploaded 20 Aug 2026Source
- Withdrawal Update Form 1Form1-Architect Cert-DEC 2023.pdf · uploaded 20 Aug 2026Source
- Withdrawal Update Form 1Form 1.pdf · uploaded 20 Aug 2026Source
- Withdrawal Update Form 1Form 1.pdf · uploaded 20 Aug 2026Source
- Withdrawal Update Form 2Form 2.pdf · uploaded 20 Aug 2026Source
- Withdrawal Update Form 2Form 2.pdf · uploaded 20 Aug 2026Source
- Withdrawal Update Form 2Form 2.pdf · uploaded 20 Aug 2026Source
- Withdrawal Update Form 2Form 2.pdf · uploaded 20 Aug 2026Source
- Withdrawal Update Form 3Form 3 - 31-03-2026_.pdf · uploaded 20 Aug 2026Source
- Withdrawal Update Form 3Form 3 - 31-03-2026_.pdf · uploaded 20 Aug 2026Source
- Withdrawal Update Form 3Form 3 - 31-03-2026_.pdf · uploaded 20 Aug 2026Source
- Withdrawal Update Form 3Form 3 - 31-03-2026_.pdf · uploaded 20 Aug 2026Source
- Form 2A (FY 2025-2026)Form 2A - 2026.pdf · uploaded 21 Aug 2026Source
- Form 5 (FY 2024-2025)Form 5 - 2024-25.pdf · uploaded 3 Oct 2026Source
- Form 5 (FY 2025-2026)Form 5 - 2025-26.pdf · uploaded 6 Oct 2026Source
- Withdrawal Update Form 1Form 1 - Architect Certificate.pdf · uploaded 8 Oct 2026Source
- Withdrawal Update Form 2Form 2 - Engineer Certificate.pdf · uploaded 8 Oct 2026Source
- Withdrawal Update Form 3Form 3 - CA Certificate.pdf · uploaded 8 Oct 2026Source
Technical
- DocumentLayout Plan_compressed (1).pdf · uploaded 3 Mar 2023Source
- DocumentBuilding Plan Approval.pdf · uploaded 3 Mar 2023Source
- DocumentLAYOUT DRAWING_New_compressed.pdf · uploaded 5 Feb 2024Source
- DocumentAPPROVED DRAWINGS Latest (1)_3-3.pdf · uploaded 10 Apr 2024Source
- DocumentAPPROVED DRAWINGS Latest (1)_4-4.pdf · uploaded 10 Apr 2024Source
- DocumentAPPROVED DRAWINGS Latest (1)_5-5.pdf · uploaded 10 Apr 2024Source
- DocumentAPPROVED DRAWINGS Latest (1)_6-6.pdf · uploaded 10 Apr 2024Source
- DocumentAPPROVED DRAWINGS Latest (1)_7-7.pdf · uploaded 10 Apr 2024Source
- DocumentAPPROVED DRAWINGS Latest (1)_8-8.pdf · uploaded 10 Apr 2024Source
- DocumentAPPROVED DRAWINGS Latest (1)_9-9.pdf · uploaded 10 Apr 2024Source
- DocumentAPPROVED DRAWINGS Latest (1)_10-10.pdf · uploaded 10 Apr 2024Source
- DocumentAPPROVED DRAWINGS Latest (1)_11-11.pdf · uploaded 10 Apr 2024Source
- DocumentAPPROVED DRAWINGS Latest (1)_12-12.pdf · uploaded 10 Apr 2024Source
- DocumentAPPROVED DRAWINGS Latest (1)_13-13.pdf · uploaded 10 Apr 2024Source
- DocumentAPPROVED DRAWINGS Latest (1)_14-end.pdf · uploaded 10 Apr 2024Source
- DocumentAPPROVED DRAWINGS Latest (1)_1-1_compressed.pdf · uploaded 10 Apr 2024Source
- DocumentAPPROVED DRAWINGS Latest (1)_2-2.pdf · uploaded 10 Apr 2024Source
- Documentp1.pdf · uploaded 10 Oct 2024Source
- Documentp1_compressed-2.pdf · uploaded 10 Oct 2024Source
- Documentp1_compressed-3.pdf · uploaded 10 Oct 2024Source
- Documentp1_compressed-4.pdf · uploaded 10 Oct 2024Source
- Documentp1_compressed-5.pdf · uploaded 10 Oct 2024Source
- Documentp1.pdf · uploaded 10 Oct 2024Source
- Documentp1_compressed-2.pdf · uploaded 10 Oct 2024Source
- Documentp1_compressed-3.pdf · uploaded 10 Oct 2024Source
- Documentp1_compressed-4.pdf · uploaded 10 Oct 2024Source
- Documentp1_compressed-5.pdf · uploaded 10 Oct 2024Source
Technical (Architect)
- DocumentForm 1 - Architect Certificate.pdf · uploaded 8 Oct 2026Source
Technical (Engineer)
- DocumentForm 2 - Engineer Certificate.pdf · uploaded 8 Oct 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Thane (M Corp.), Thane taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Road
- South
- A-90
- East
- A-83
- West
- A-86
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Dhruv D Patel | — |
| Architect | Positron | — |
| Chartered accountant | H P Biyani & Co | — |
| Engineer | Tech Line Consulting Engineers | — |
Source: MahaRERA project page. Contact details are not shown.