Skip to content

Alimkar Heights

Certificate Signed

Thane (M Corp.), Thane 421204 |Promoter: Alimkar & Sons

24 Jul 2023Registered with MahaRERA
27 Oct 2026Promised completion
1Building
82Units registered8 booked (10%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Buildings
1
Unit types
1BHK, 2BHK, 3BHK, Office space, Shop82 units in all
Address
Plot No 190/1/3, Plot No 190/1/3, , Old Mumbra Panvel Road, ShilphataPIN 421204
Designated bank account
148
Developed in phases
No

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 27 Oct 2026

Registered
24 Jul 2023
Promised
27 Oct 2026

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5170005209524 Jul 202327 Oct 202627 Oct 2026Alimkar & SonsProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Main building1082

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

8 of 82 units booked (10%), as the promoter reported to MahaRERA

1BHK · 44 units2BHK · 19 units3BHK · 8 unitsOffice space · 4 unitsShop · 7 units
TypeCarpet areaUnitsBooked
1BHK40.62 sq m · 437 sq ft100
1BHK41.91 sq m · 451 sq ft100
1BHK42.07 sq m · 453 sq ft70
1BHK42.46 sq m · 457 sq ft70
1BHK42.88 sq m · 462 sq ft100
2BHK51.68 sq m · 556 sq ft10
2BHK54.67 sq m · 588 sq ft100
2BHK59.58 sq m · 641 sq ft87
Show all 18 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
3BHK80.78 sq m · 870 sq ft81
Office space96.41 sq m · 1,038 sq ft20
Office space141.54 sq m · 1,524 sq ft20
Shop19.83 sq m · 213 sq ft10
Shop21 sq m · 226 sq ft10
Shop21.12 sq m · 227 sq ft10
Shop24.09 sq m · 259 sq ft10
Shop25.73 sq m · 277 sq ft10
Shop28.39 sq m · 306 sq ft10
Shop48.98 sq m · 527 sq ft10

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

2 documents held by Deedo, 129 filings listed on MahaRERA's project page

Registration certificate (2)

Finance

  • PAN Card2 Pan Card.pdf · uploaded 6 May 2023Source
  • Other – FinanceNO ENCUMBRANCES - BANK.pdf · uploaded 15 Jun 2023Source

Legal

  • Declaration Form Balimkar and sons from B Affidavit cum decclaration.pdf · uploaded 6 May 2023Source
  • Other – Legal1 Other – Legal.pdf · uploaded 15 Jun 2023Source
  • Other – Legal2 Other – Legal.pdf · uploaded 15 Jun 2023Source
  • Legal Title reportALIMAKAR REVISED.pdf · uploaded 26 Jun 2023Source
Show all 131 documentsShow fewer documents

Migrated

  • 1 PAN Card2 Pan Card.pdf · uploaded 6 May 2023Source
  • 1 Copy of Layout Approval (in case of layout)Blue Print_1.pdf · uploaded 6 May 2023Source
  • 2 Copy of Layout Approval (in case of layout)Blue Print_2.pdf · uploaded 6 May 2023Source
  • 3 Copy of Layout Approval (in case of layout)Blue Print_3.pdf · uploaded 6 May 2023Source
  • 4 Copy of Layout Approval (in case of layout)Blue Print_4.pdf · uploaded 6 May 2023Source
  • 1 Building Plan Approval / NA Order for plotted developmentBlue Print_1.pdf · uploaded 6 May 2023Source
  • 2 Building Plan Approval / NA Order for plotted developmentBlue Print_2.pdf · uploaded 6 May 2023Source
  • 3 Building Plan Approval / NA Order for plotted developmentBlue Print_3.pdf · uploaded 6 May 2023Source
  • 4 Building Plan Approval / NA Order for plotted developmentBlue Print_4.pdf · uploaded 6 May 2023Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate_1.pdf · uploaded 6 May 2023Source
  • 1 Declaration about Commencement Certificatealimkar and sons declaration About commencement certificate form.pdf · uploaded 6 May 2023Source
  • 1 Declaration in FORM Balimkar and sons from B Affidavit cum decclaration.pdf · uploaded 6 May 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1-Architect Cetificate.pdf · uploaded 6 May 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2-Engineer Cetificate.pdf · uploaded 6 May 2023Source
  • 1 CERSAI detailsCERSAI_Search_Report 04_05_2023.pdf · uploaded 6 May 2023Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsAlimkar and Sons Annexure A - Anil Alimkar.pdf · uploaded 6 May 2023Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsAlimkar and Sons Annexure A - Sunil Alimkar.pdf · uploaded 6 May 2023Source
  • 1 Proforma of Agreement for saleALIMKAR AND SONS MODEL OF SALE AGREEMENT.pdf · uploaded 6 May 2023Source
  • 1 Proforma of Allotment letterALLOTMENT_LETTER.pdf · uploaded 6 May 2023Source
  • 1 Deviation Report with respect to Allotment letteralimkars and sons allotment letter declaration.pdf · uploaded 6 May 2023Source
  • 1 Deviation Report with respect to model copy of Agreementalimkar and sons alimkar project mode copy of agreemet.pdf · uploaded 6 May 2023Source
  • 1 a Details of encumbrances concerned to Financeno encumbrances Finance - Legal.pdf · uploaded 15 Jun 2023Source
  • 1 b Details of encumbrances concerned to Legalno encumbrances Finance - Legal.pdf · uploaded 15 Jun 2023Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 REVISED_compressed (1).pdf · uploaded 15 Jun 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFORMAT A SEPRATE BANK ACCOUNT.pdf · uploaded 15 Jun 2023Source
  • 1 Other – Legal2 Other – Legal.pdf · uploaded 15 Jun 2023Source
  • 2 Other – Legal1 Other – Legal.pdf · uploaded 15 Jun 2023Source
  • 1 Other – FinanceNO ENCUMBRANCES - BANK.pdf · uploaded 15 Jun 2023Source
  • 1 Copy of the legal title reportALIMAKAR REVISED.pdf · uploaded 26 Jun 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arc Form 1 Mar24.pdf · uploaded 28 Jul 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arc Form 1 Jun2024.pdf · uploaded 28 Jul 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Ajay mahale form 2 Mar24.pdf · uploaded 28 Jul 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Ajay Mahale Form 2 Jun2024.pdf · uploaded 28 Jul 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 mar 2024 (2).pdf · uploaded 28 Jul 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Patil Form 2 A Mar24.pdf · uploaded 28 Jul 2024Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Patil Form 2A jun2024.pdf · uploaded 28 Jul 2024Source
  • 1 Disclosure of sold/ booked inventorySold and Unsold 30 jun 2024.pdf · uploaded 28 Jul 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Form 3 Mar24.pdf · uploaded 28 Jul 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)4 CA Form 3 Jun2024.pdf · uploaded 28 Jul 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5 Alimkar and Sons FY 2023-24 .pdf · uploaded 16 Nov 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5 Alimkar and Sons FY 2023-24 .pdf · uploaded 16 Nov 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arc Form 1 Sep 24.pdf · uploaded 17 Dec 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Form 3 Sep24.pdf · uploaded 17 Dec 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Ajay Mahale Form 2 Sep 24.pdf · uploaded 17 Dec 2024Source
  • 1 Disclosure of sold/ booked inventorySold and Unsold Inventory.pdf · uploaded 17 Dec 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arc Form 1 Dec 24.pdf · uploaded 26 Mar 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Dec 24.pdf · uploaded 26 Mar 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Dec 24.pdf · uploaded 26 Mar 2025Source
  • 1 Disclosure of sold/ booked inventorySold and Unsold Inventory .pdf · uploaded 26 Mar 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Q4 FY 2024-25 Alimkar Heights.pdf · uploaded 10 May 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Q4 FY 2024-25 Alimkar Heights.pdf · uploaded 10 May 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Q4 FY 2024-25 Alimkar Heights.pdf · uploaded 10 May 2025Source
  • 1 Disclosure of sold/ booked inventorySold Unsold March-2025.pdf · uploaded 10 May 2025Source
  • Form 11Form -1 Sep-23.pdf · uploaded 10 Jul 2025Source
  • Form 12 Form -1 Dec-23.pdf · uploaded 10 Jul 2025Source
  • Form 13Alimkar Height Form 1 March 24.pdf · uploaded 10 Jul 2025Source
  • Form 14 Alimkar Height Form 1 June 24.pdf · uploaded 10 Jul 2025Source
  • Form 15 Alimkar Height Form 1 Sep 24.pdf · uploaded 10 Jul 2025Source
  • Form 16 Alimkar Height Form 1 Dec 24.pdf · uploaded 10 Jul 2025Source
  • Form 17 Alimkar Height Form 1 March 25.pdf · uploaded 10 Jul 2025Source
  • Form 21 Form - 2 Sep-23.pdf · uploaded 10 Jul 2025Source
  • Form 22 Form - 2 Dec-23.pdf · uploaded 10 Jul 2025Source
  • Form 23 Alimkar Height Form 2 March 24.pdf · uploaded 10 Jul 2025Source
  • Form 24 Alimkar Height Form 2 June 24.pdf · uploaded 10 Jul 2025Source
  • Form 25 Alimkar Height Form 2 Sep 24.pdf · uploaded 10 Jul 2025Source
  • Form 26 Alimkar Height Form 2 Dec 24.pdf · uploaded 10 Jul 2025Source
  • Form 27 Alimkar Height Form 2 March 25.pdf · uploaded 10 Jul 2025Source
  • Form 31Alimkar & Sons Form 3 (Sept-2023)_compressed.pdf · uploaded 10 Jul 2025Source
  • Form 32 Alimkar & Sons Form 3 (Dec-2023)_compressed.pdf · uploaded 10 Jul 2025Source
  • Form 33 Alimkar Height Form 3 March 24.pdf · uploaded 10 Jul 2025Source
  • Form 34 Alimkar Height Form 3 June 24.pdf · uploaded 10 Jul 2025Source
  • Form 35 Alimkar Height Form 3 Sep 24.pdf · uploaded 10 Jul 2025Source
  • Form 36 Alimkar Height Form 3 Dec 24.pdf · uploaded 10 Jul 2025Source
  • Form 37 Alimkar Height Form 3 Mar- 25.pdf · uploaded 10 Jul 2025Source
  • Disclosure of Sold and Booked Inventory1Disclosure of sold& booked inventory sep-23.pdf · uploaded 10 Jul 2025Source
  • Disclosure of Sold and Booked Inventory2 Disclosure of sold& booked inventory Dec-23.pdf · uploaded 10 Jul 2025Source
  • Disclosure of Sold and Booked Inventory3Disclosure of sold& booked inventory Mar-24.pdf · uploaded 10 Jul 2025Source
  • Disclosure of Sold and Booked Inventory4Disclosure of sold_ booked inventory 30-June 2024.pdf · uploaded 10 Jul 2025Source
  • Disclosure of Sold and Booked Inventory5 Disclosure of sold_ booked inventory 30-Sep-2024.pdf · uploaded 10 Jul 2025Source
  • Disclosure of Sold and Booked Inventory6 Disclosure of sold_ booked inventory 31-Dec 2024.pdf · uploaded 10 Jul 2025Source
  • Disclosure of Sold and Booked Inventory7 Disclosure of sold_ booked inventory 31-March 25.pdf · uploaded 10 Jul 2025Source
  • Self-declaration of Quarterly ProgressSelf Declaration.pdf · uploaded 10 Jul 2025Source
  • Form 11 Form 1 June-25.pdf · uploaded 12 Sep 2025Source
  • Form 23 Ajay Mahale Form 2 June-25.pdf · uploaded 12 Sep 2025Source
  • Form 3Alimkar & Sons-Form 3 (June-25)_compressed.pdf · uploaded 12 Sep 2025Source
  • Disclosure of Sold and Booked Inventory5 Disclosure of sold booked inventory June- 25.pdf · uploaded 12 Sep 2025Source
  • Self-declaration of Quarterly ProgressSelf Declaration.pdf · uploaded 12 Sep 2025Source
  • Form 2A (FY 2023-2024)Form 2A March-2024.pdf · uploaded 29 Sep 2025Source
  • Form 2A (FY 2024-2025)Form 2A March -2025.pdf · uploaded 29 Sep 2025Source
  • Form 1AlimkarForm1Sep25.pdf · uploaded 21 Nov 2025Source
  • Form 2AlimkarForm2 Sep25.pdf · uploaded 21 Nov 2025Source
  • Form 3AlimkarForm3Sept25_compressed.pdf · uploaded 21 Nov 2025Source
  • Disclosure of Sold and Booked InventoryAlimkarDisclosureSep25.pdf · uploaded 21 Nov 2025Source
  • Self-declaration of Quarterly ProgressSelf Declaration Sep-25.pdf · uploaded 21 Nov 2025Source
  • Form 5 (FY 2023-2024)Form 5 FY 2023-24.pdf · uploaded 24 Nov 2025Source
  • Form 5 (FY 2024-2025)Form 5 FY 24-25.pdf · uploaded 26 Nov 2025Source
  • Form 1Arc Form 1 Dec25.pdf · uploaded 11 Feb 2026Source
  • Form 2Ajay Mahale Form 2 Dec25.pdf · uploaded 11 Feb 2026Source
  • Form 3Form 3 Dec 2025 Signed_11zon.pdf · uploaded 11 Feb 2026Source
  • Disclosure of Sold and Booked InventoryDisclosure of sold booked inventory Dec 25.pdf · uploaded 11 Feb 2026Source
  • Self-declaration of Quarterly ProgressSelf Declaration Dec 25 new.pdf · uploaded 11 Feb 2026Source
  • Withdrawal Update Form 1Arc Form 1 March 26 10th floor final.pdf · uploaded 28 Apr 2026Source
  • Withdrawal Update Form 2Ajay Mahale Form 2 March 26 Final 10th floor.pdf · uploaded 28 Apr 2026Source
  • Withdrawal Update Form 3Alimkar and Son Revised Form 3 March 26 10th Floor_11zon.pdf · uploaded 28 Apr 2026Source
  • Withdrawal Update Form 1Arc Form 1 March 26 10th floor final.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 2Ajay Mahale Form 2 March 26 Final 10th floor.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 3Form3Alimkarandsonsjune26_compressed (1).pdf · uploaded 20 Jul 2026Source

Technical

  • DocumentBlue Print_1.pdf · uploaded 6 May 2023Source
  • DocumentBlue Print_2.pdf · uploaded 6 May 2023Source
  • DocumentBlue Print_3.pdf · uploaded 6 May 2023Source
  • DocumentBlue Print_4.pdf · uploaded 6 May 2023Source
  • DocumentBlue Print_1.pdf · uploaded 6 May 2023Source
  • DocumentBlue Print_2.pdf · uploaded 6 May 2023Source
  • DocumentBlue Print_3.pdf · uploaded 6 May 2023Source
  • DocumentBlue Print_4.pdf · uploaded 6 May 2023Source

Technical (Architect)

  • DocumentArc Form 1 Sep 24.pdf · uploaded 17 Dec 2024Source
  • DocumentArc Form 1 Dec 24.pdf · uploaded 26 Mar 2025Source
  • DocumentForm 1 Q4 FY 2024-25 Alimkar Heights.pdf · uploaded 10 May 2025Source
  • DocumentArc Form 1 March 26 10th floor final.pdf · uploaded 20 Jul 2026Source

Technical (Engineer)

  • DocumentAjay Mahale Form 2 Sep 24.pdf · uploaded 17 Dec 2024Source
  • DocumentForm 2 Dec 24.pdf · uploaded 26 Mar 2025Source
  • DocumentForm 2 Q4 FY 2024-25 Alimkar Heights.pdf · uploaded 10 May 2025Source
  • DocumentAjay Mahale Form 2 March 26 Final 10th floor.pdf · uploaded 20 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Thane (M Corp.), Thane taluka

Survey, CTS, gat or plot numbers

PLOT NO 190/1/3

Boundaries

North
19 14 95 N And 73 03 94 E
South
19 14 88 N And 73 03 93 E
East
19 14 91 N And 17 03 94 E
West
19 14 92 N And 73 03 91 E

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectJoshi Deshaware and Associates josh—
ArchitectJoshi Deshaware Associates—
Chartered accountantSatish Kavitake—
Chartered accountantShalu Anand & Co—
EngineerAjay Mahale Consulting Engineer—
EngineerPrakash Vilas Patil—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology