Skip to content

Elegant City Bliss

Certificate Signed

Shirol, Thane 421602 |Promoter: Neele Buildcon LLP

1 Dec 2020Registered with MahaRERA
30 Jun 2028Promised completion
30 Oct 2028Revised completionPushed back 4 months
5Buildings
344Units registered57 booked (17%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Buildings
5
Unit types
1BHK, 2BHK, Shop, 1RK344 units in all
Address
1390/A/1, 1390/A/2, 1390/A/3, NH-3, MUMBAI NASHIK HIGHWAY, ShahapurPIN 421602
Designated bank account
51
Developed in phases
Yes

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 4 months

Registered
1 Dec 2020
Promised
30 Jun 2028
Revised
30 Oct 2028

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P517000273201 Dec 202030 Jun 202830 Oct 2028Neele Buildcon LLPProject page

5 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Bliss-1766
Bliss-2768
Bliss-3770
Bliss-4770
Bliss-5770

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

57 of 344 units booked (17%), as the promoter reported to MahaRERA

1BHK · 253 units2BHK · 59 unitsShop · 18 units1RK · 14 units
BuildingTypeCarpet areaUnitsBooked
Bliss-11BHK31.9 sq m · 343 sq ft22
Bliss-11BHK32.44 sq m · 349 sq ft33
Bliss-11BHK37.49 sq m · 404 sq ft11
Bliss-11BHK37.94 sq m · 408 sq ft225
Bliss-11BHK52.88 sq m · 569 sq ft10
Bliss-12BHK44.82 sq m · 482 sq ft22
Bliss-12BHK44.9 sq m · 483 sq ft11
Bliss-12BHK46.77 sq m · 503 sq ft10
Show all 51 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
Bliss-12BHK52.3 sq m · 563 sq ft11
Bliss-12BHK52.48 sq m · 565 sq ft116
Bliss-12BHK53 sq m · 570 sq ft11
Bliss-12BHK53.02 sq m · 571 sq ft11
Bliss-12BHK53.18 sq m · 572 sq ft103
Bliss-1Shop16.79 sq m · 181 sq ft11
Bliss-1Shop18.15 sq m · 195 sq ft11
Bliss-1Shop18.25 sq m · 196 sq ft11
Bliss-1Shop18.99 sq m · 204 sq ft11
Bliss-1Shop25.35 sq m · 273 sq ft22
Bliss-1Shop27.44 sq m · 295 sq ft10
Bliss-1Shop31.87 sq m · 343 sq ft10
Bliss-1Shop31.88 sq m · 343 sq ft10
Bliss-21BHK31.9 sq m · 343 sq ft140
Bliss-21RK32.44 sq m · 349 sq ft140
Bliss-22BHK39.68 sq m · 427 sq ft10
Bliss-22BHK42.76 sq m · 460 sq ft10
Bliss-22BHK42.79 sq m · 461 sq ft10
Bliss-22BHK44.82 sq m · 482 sq ft70
Bliss-22BHK44.9 sq m · 483 sq ft70
Bliss-22BHK46.7 sq m · 503 sq ft70
Bliss-22BHK46.77 sq m · 503 sq ft70
Bliss-2Shop16.7 sq m · 180 sq ft10
Bliss-2Shop18.15 sq m · 195 sq ft10
Bliss-2Shop18.15 sq m · 195 sq ft10
Bliss-2Shop18.9 sq m · 203 sq ft10
Bliss-2Shop25.26 sq m · 272 sq ft10
Bliss-2Shop25.27 sq m · 272 sq ft10
Bliss-2Shop27.41 sq m · 295 sq ft10
Bliss-2Shop31.87 sq m · 343 sq ft10
Bliss-2Shop31.88 sq m · 343 sq ft10
Bliss-31BHK28.64 sq m · 308 sq ft116
Bliss-31BHK28.65 sq m · 308 sq ft316
Bliss-31BHK37.01 sq m · 398 sq ft151
Bliss-31BHK39.37 sq m · 424 sq ft130
Bliss-41BHK28.64 sq m · 308 sq ft71
Bliss-41BHK28.65 sq m · 308 sq ft352
Bliss-41BHK37.01 sq m · 398 sq ft141
Bliss-41BHK39.37 sq m · 424 sq ft140
Bliss-51BHK28.64 sq m · 308 sq ft84
Bliss-51BHK28.65 sq m · 308 sq ft341
Bliss-51BHK37.01 sq m · 398 sq ft141
Bliss-51BHK39.37 sq m · 424 sq ft142

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 119 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardNEELE BUILDCON PAN.pdf · uploaded 25 Nov 2020Source

Legal

  • Other1390 FIRE NOC -min.pdf · uploaded 25 Nov 2020Source
  • Declaration Form BForm 'B' Neele Buildcon LLP_Compressed.pdf · uploaded 25 Nov 2020Source
  • Legal Title reportTITLE CERTIFICATE_Compressed.pdf · uploaded 27 Nov 2020Source

Migrated

  • 1 PAN CardNEELE BUILDCON PAN.pdf · uploaded 25 Nov 2020Source
  • 1 Commencement Certificates / NA Order for plotted developmentNA Order Copy 15 JANUARY 2020_Compressed.pdf · uploaded 25 Nov 2020Source
  • 1 Declaration in FORM BForm 'B' Neele Buildcon LLP_Compressed.pdf · uploaded 25 Nov 2020Source
Show all 120 documentsShow fewer documents

Migrated

  • 1 Other1390 FIRE NOC -min.pdf · uploaded 25 Nov 2020Source
  • 1 Copy of the legal title reportTITLE CERTIFICATE_Compressed.pdf · uploaded 27 Nov 2020Source
  • 1 Details of encumbrancesEncumbrances Neele.pdf · uploaded 27 Nov 2020Source
  • 1 Copy of Layout Approval (in case of layout)Layout plan.pdf · uploaded 27 Nov 2020Source
  • 1 Building Plan Approval / NA Order for plotted developmentbuilding plan-1.pdf · uploaded 27 Nov 2020Source
  • 2 Building Plan Approval / NA Order for plotted developmentbuilding plan-2.pdf · uploaded 27 Nov 2020Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)NEELE BUILDCON LLP FORM -3 REGISTRATION_Compressed.pdf · uploaded 27 Nov 2020Source
  • 1 Proforma of Allotment letterAgreement and Allotement Neele.pdf · uploaded 27 Nov 2020Source
  • 1 Declaration about Commencement CertificateDECLARATION ABOUT CC.pdf · uploaded 1 Sep 2021Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Rera 31_03_2021_Compressed.pdf · uploaded 1 Sep 2021Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Rera 30_06_2021_Compressed.pdf · uploaded 1 Sep 2021Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)engineers certificate 31-03-2021.pdf · uploaded 1 Sep 2021Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate 30-06-2021.pdf · uploaded 1 Sep 2021Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Final Form-3 CA Bliss as on 31-03-2021_Compressed.pdf · uploaded 1 Sep 2021Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Final Form-3 CA Bliss as on 30-06-2021_Compressed.pdf · uploaded 1 Sep 2021Source
  • 1 Disclosure of sold/ booked inventorySold and booked inventory 30-06-2021_Compressed.pdf · uploaded 3 Sep 2021Source
  • 2 Proforma of Allotment letterAGREEMENT FOR SALE Rera upload draft.pdf · uploaded 26 Oct 2021Source
  • 3 Proforma of Allotment letterALLOTMENT LETTER New Rera Coustmors.pdf · uploaded 26 Oct 2021Source
  • 4 Proforma of Allotment letterAGREEMENT FOR SALE Rera upload draft.pdf · uploaded 26 Oct 2021Source
  • 5 Proforma of Allotment letterALLOTMENT LETTER New Rera Coustmors.pdf · uploaded 26 Oct 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form-5.pdf · uploaded 31 Dec 2021Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM-1_Buildcon_30-09-2021.pdf · uploaded 3 Oct 2022Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1_Compressed.pdf · uploaded 3 Oct 2022Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1_Compressed.pdf · uploaded 3 Oct 2022Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM-2_Buildcon_30-09-2021_Compressed.pdf · uploaded 3 Oct 2022Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_Compressed.pdf · uploaded 3 Oct 2022Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_Compressed.pdf · uploaded 3 Oct 2022Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_Neele_30092021_Compressed.pdf · uploaded 3 Oct 2022Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_Neele_31122021_Compressed.pdf · uploaded 3 Oct 2022Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_Neele_31032022_Compressed.pdf · uploaded 3 Oct 2022Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_Neele_30062022.pdf · uploaded 2 Feb 2023Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_Neele_30062022_Compressed.pdf · uploaded 2 Feb 2023Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_Neele_30092022.pdf · uploaded 3 Feb 2023Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_Neele_30092022-compressed.pdf · uploaded 3 Feb 2023Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_Neele_30062022_compressed.pdf · uploaded 10 Feb 2023Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_Neele_30092022_compressed.pdf · uploaded 10 Feb 2023Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_Neele_31122022.pdf · uploaded 14 Feb 2023Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_Neele_31122022_Uploaded.pdf · uploaded 14 Feb 2023Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3_Neele_31122022_Uploaded.pdf · uploaded 14 Feb 2023Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM-1_Buildcon_2023-03-31 (1).pdf · uploaded 7 Feb 2024Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM-1_Buildcon_2023-06-30.pdf · uploaded 7 Feb 2024Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Neele Builcom 31032023.pdf · uploaded 15 Feb 2024Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Neele Buildcom 30062023.pdf · uploaded 15 Feb 2024Source
  • 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Neele Buildcom 30092023.pdf · uploaded 15 Feb 2024Source
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM-1_Buildcon_2023-09-30.pdf · uploaded 7 Mar 2024Source
  • 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM-1_Buildcon_2023-12-31 (1).pdf · uploaded 7 Mar 2024Source
  • 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)Meele Buildcon LLP 30_06_2023_compressed.pdf · uploaded 7 Mar 2024Source
  • 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Neele Buildcon LLP 30_09_2023_compressed.pdf · uploaded 7 Mar 2024Source
  • 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Neele Buildcon LLP 31_12_2023.pdf · uploaded 7 Mar 2024Source
  • 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Neele Buildcon LLP 31_03_2023_compressed.pdf · uploaded 7 Mar 2024Source
  • 16 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Neele Buildcon LLP 31_12_2023.pdf · uploaded 13 Mar 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A - FY -2020-21.pdf · uploaded 13 Mar 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A -FY 2021-22.pdf · uploaded 13 Mar 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A - FY 2022-23.pdf · uploaded 13 Mar 2024Source
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Neele Builcom 31032023_compressed.pdf · uploaded 28 Mar 2024Source
  • 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Neele Builcom 30062023_compressed.pdf · uploaded 28 Mar 2024Source
  • 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Neele Builcom 30092023Compressed.pdf · uploaded 28 Mar 2024Source
  • 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Neele Builcom 31122023 Compressed.pdf · uploaded 28 Mar 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM-1_Buildcon_31-03-2024.pdf · uploaded 6 May 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM-1_Buildcon_30-06-2024.pdf · uploaded 6 May 2025Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM-1_Buildcon_30-09-2024.pdf · uploaded 6 May 2025Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM-1_Buildcon_31-12-2024.pdf · uploaded 6 May 2025Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM-1_Buildcon_31-03-2025.pdf · uploaded 6 May 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 -31032024.pdf · uploaded 7 May 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - 30062024.pdf · uploaded 7 May 2025Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - 30092024.pdf · uploaded 7 May 2025Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - 31122024.pdf · uploaded 7 May 2025Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - 31032025.pdf · uploaded 7 May 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 31032024 Final.pdf · uploaded 12 May 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 30062024 Final.pdf · uploaded 12 May 2025Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 30092024 Final.pdf · uploaded 12 May 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Final Form 3 - neele - 31122024_compressed.pdf · uploaded 16 May 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Final Form 3 - neele - 31032025_compressed.pdf · uploaded 16 May 2025Source
  • Form 1FORM-1 Buildcon 30062025.pdf · uploaded 19 Jul 2025Source
  • Form 2FORM-2 30062025 Engineer.pdf · uploaded 19 Jul 2025Source
  • Form 3Form3 Neele 30062025_compressed.pdf · uploaded 19 Jul 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure Of Sold and Unsold Inventory 30062025.pdf · uploaded 19 Jul 2025Source
  • Form 5 (FY 2021-2022)System Generated 21-22 Form 5 (1).pdf · uploaded 28 Jul 2025Source
  • Form 5 (FY 2022-2023)System Generated 22-23 Form 5 (1).pdf · uploaded 28 Jul 2025Source
  • Form 5 (FY 2023-2024)System Generated 23-24 Form 5 (1).pdf · uploaded 28 Jul 2025Source
  • Form 2A (FY 2023-2024)Form 2A 31st March 2024.pdf · uploaded 30 Jul 2025Source
  • Form 2A (FY 2024-2025)Form 2A 31st March 2025.pdf · uploaded 30 Jul 2025Source
  • Form 5 (FY 2024-2025)Neele Form 5 Signed Copy.pdf · uploaded 30 Sep 2025Source
  • Withdrawal Update Form 1Form 1 Neele Buildcon 30092025.pdf · uploaded 10 Nov 2025Source
  • Withdrawal Update Form 2Form 2 Neele Buildcon 30092025.pdf · uploaded 10 Nov 2025Source
  • Withdrawal Update Form 3Form 3 Neele Buildcon 30092025.pdf · uploaded 10 Nov 2025Source
  • Withdrawal Update Form 1Form 1 of Neele 31122025.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 2Form 2 of Neele 31122025.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 3Form 3 of Neele 31122025.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 1Form 1 Neele 31032026_Uploaded.pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 2Neele Buildcon Rera Form 2_Uploaded.pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 3Neele Buildcon Rera Form 3_31032026_Uploaded.pdf · uploaded 20 Apr 2026Source
  • Form 2A (FY 2025-2026)Form 2A of Neele 25-26.pdf · uploaded 24 Jun 2026Source
  • Withdrawal Update Form 1Form 1 Neele 30062026_signed.pdf · uploaded 24 Jul 2026Source
  • Withdrawal Update Form 2Form 2 Neele 30062026 signed.pdf · uploaded 24 Jul 2026Source
  • Withdrawal Update Form 3Form 3 Neele 30062026 signed_compressed.pdf · uploaded 24 Jul 2026Source
  • Form 5 (FY 2025-2026)Form 5 of Neele Buildcon FY 25-26-signed.pdf · uploaded 18 Sep 2026Source

Technical

  • DocumentLayout plan.pdf · uploaded 27 Nov 2020Source
  • Documentbuilding plan-1.pdf · uploaded 27 Nov 2020Source
  • Documentbuilding plan-2.pdf · uploaded 27 Nov 2020Source

Technical (Architect)

  • DocumentFORM-1_Buildcon_31-03-2024.pdf · uploaded 6 May 2025Source
  • DocumentFORM-1_Buildcon_30-06-2024.pdf · uploaded 6 May 2025Source
  • DocumentFORM-1_Buildcon_30-09-2024.pdf · uploaded 6 May 2025Source
  • DocumentFORM-1_Buildcon_31-12-2024.pdf · uploaded 6 May 2025Source
  • DocumentFORM-1_Buildcon_31-03-2025.pdf · uploaded 6 May 2025Source
  • DocumentForm 1 Neele 30062026_signed.pdf · uploaded 24 Jul 2026Source

Technical (Engineer)

  • DocumentForm 2 -31032024.pdf · uploaded 7 May 2025Source
  • DocumentForm 2 - 30062024.pdf · uploaded 7 May 2025Source
  • DocumentForm 2 - 30092024.pdf · uploaded 7 May 2025Source
  • DocumentForm 2 - 31122024.pdf · uploaded 7 May 2025Source
  • DocumentForm 2 - 31032025.pdf · uploaded 7 May 2025Source
  • DocumentForm 2 Neele 30062026 signed.pdf · uploaded 24 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Shirol, Shahapur taluka

Survey, CTS, gat or plot numbers

1390/A/11390/A/21390/A/3

Boundaries

North
Shirol Karanjpada Waaralipada Main Road
South
Gut No 1379
East
Gut No 1390 Pt and Road
West
Gut No 1382 and 1381

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectArchvision Architects & Int.designers—
ArchitectP D Architect—
Chartered accountantS B Jain And Associates—
Chartered accountantShashank R Jain And Associates—
EngineerSajid Ansari—
EngineerSscons—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology