As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Buildings
- 2
- Unit types
- 1 BHK L E, 1 BHK L O, 2.5 BHK L E, 2.5 BHK L O, 2.5 BHK M E, 2.5 BHK M O, 2.5 BHK S E, 2.5 BHK S O, 2 BHK L E, 2 BHK L O, 2 BHK M E, 2BHK M O, 2 BHK S E, 2 BHK S O, 3 BHK PALATIAL E, 3 BHK PALATIAL O, 2 BHK M O, 3BHK PALATIAL E, Shop414 units in all
- Address
- CS No 2 part and 421 part Tikka No 2 to 5, Kalyan Shill Road, Metro Junction MallPIN 421306
- Designated bank account
- 159
- Developed in phases
- Yes
Location
Coordinates as published by MahaRERA
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 6 months
The latest completion date on record passed 1 year and 4 months ago.
- Registered
- 8 Aug 2017
- Promised
- 30 Dec 2024
- Revised
- 30 Jun 2025
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51900004149 | 8 Aug 2017 | 30 Dec 2024 | 30 Jun 2025 | West Pioneer Properties India Pvt Ltd | Project page |
2 buildings
Buildings and wings named in the registration
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
274 of 414 units booked (66%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Tower C | 1 BHK L E | 36.25 sq m · 390 sq ft | 7 | 7 |
| Tower C | 1 BHK L O | 36.25 sq m · 390 sq ft | 7 | 7 |
| Tower C | 2.5 BHK L E | 83.5 sq m · 899 sq ft | 14 | 12 |
| Tower C | 2.5 BHK L O | 83.5 sq m · 899 sq ft | 14 | 11 |
| Tower C | 2.5 BHK M E | 83 sq m · 893 sq ft | 12 | 10 |
| Tower C | 2.5 BHK M O | 83 sq m · 893 sq ft | 11 | 5 |
| Tower C | 2.5 BHK S E | 79.25 sq m · 853 sq ft | 12 | 8 |
| Tower C | 2.5 BHK S O | 79.25 sq m · 853 sq ft | 12 | 1 |
Show all 34 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Tower C | 2 BHK L E | 70 sq m · 753 sq ft | 5 | 0 |
| Tower C | 2 BHK L O | 70 sq m · 753 sq ft | 4 | 1 |
| Tower C | 2 BHK M E | 66.75 sq m · 718 sq ft | 28 | 25 |
| Tower C | 2BHK M O | 66.75 sq m · 718 sq ft | 28 | 23 |
| Tower C | 2 BHK S E | 66.5 sq m · 716 sq ft | 12 | 9 |
| Tower C | 2 BHK S O | 66.75 sq m · 718 sq ft | 12 | 8 |
| Tower C | 3 BHK PALATIAL E | 97 sq m · 1,044 sq ft | 14 | 12 |
| Tower C | 3 BHK PALATIAL O | 97 sq m · 1,044 sq ft | 14 | 11 |
| Tower D | 1 BHK L E | 36.25 sq m · 390 sq ft | 7 | 6 |
| Tower D | 1 BHK L O | 36.25 sq m · 390 sq ft | 7 | 7 |
| Tower D | 2.5 BHK L E | 83.5 sq m · 899 sq ft | 14 | 10 |
| Tower D | 2.5 BHK L O | 83.5 sq m · 899 sq ft | 14 | 6 |
| Tower D | 2.5 BHK M E | 83 sq m · 893 sq ft | 12 | 1 |
| Tower D | 2.5 BHK M O | 83 sq m · 893 sq ft | 11 | 2 |
| Tower D | 2.5 BHK S E | 79.25 sq m · 853 sq ft | 12 | 9 |
| Tower D | 2.5 BHK S O | 79.25 sq m · 853 sq ft | 12 | 6 |
| Tower D | 2 BHK L E | 70 sq m · 753 sq ft | 5 | 0 |
| Tower D | 2 BHK L O | 70 sq m · 753 sq ft | 4 | 0 |
| Tower D | 2 BHK M E | 66.75 sq m · 718 sq ft | 28 | 22 |
| Tower D | 2 BHK M O | 66.75 sq m · 718 sq ft | 28 | 21 |
| Tower D | 2 BHK S E | 66.5 sq m · 716 sq ft | 12 | 7 |
| Tower D | 2 BHK S O | 66.5 sq m · 716 sq ft | 12 | 9 |
| Tower D | 3BHK PALATIAL E | 97 sq m · 1,044 sq ft | 14 | 12 |
| Tower D | 3 BHK PALATIAL O | 97 sq m · 1,044 sq ft | 14 | 6 |
| Tower D | Shop | 135.79 sq m · 1,462 sq ft | 1 | 0 |
| Tower D | Shop | 175.71 sq m · 1,891 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
2 documents held by Deedo, 187 filings listed on MahaRERA's project page
Finance
- PAN CardPan card - WPPIPL.pdf · uploaded 27 Jul 2017Source
Legal
- Legal Title reportParpia Title Report_ land 8937 Sq Mtres_ Metro Grande.pdf · uploaded 27 Jul 2017Source
- Declaration Form BForm B Metro Grande-ilovepdf-compressed.pdf · uploaded 27 Jul 2017Source
- OtherRERA Declaration change in Estimated Cost.pdf · uploaded 8 Oct 2020Source
- OtherRERA reply in Notice in non submission of documents Form 5 dated 9 Jan 23.pdf · uploaded 10 Jan 2023Source
- Declaration Form BAffidavit cum Declaration Form B revised dated 12th Aug 2024.pdf · uploaded 13 Aug 2024Source
Show all 189 documentsShow fewer documents
Migrated
- 1 PAN CardPan card - WPPIPL.pdf · uploaded 27 Jul 2017Source
- 1 Copy of the legal title reportParpia Title Report_ land 8937 Sq Mtres_ Metro Grande.pdf · uploaded 27 Jul 2017Source
- 1 Details of encumbrancesEncumbrance Certificate with Index II.pdf · uploaded 27 Jul 2017Source
- 1 Copy of Layout Approval (in case of layout)layout.pdf · uploaded 27 Jul 2017Source
- 1 Building Plan Approval (IOD)Commencement Certificate of Metro Grande.pdf · uploaded 27 Jul 2017Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate of Metro Grande.pdf · uploaded 27 Jul 2017Source
- 1 Declaration in FORM BForm B Metro Grande-ilovepdf-compressed.pdf · uploaded 27 Jul 2017Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate Form I Metro Grande.pdf · uploaded 27 Jul 2017Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA-Engineer Certificate Final 21st July 2017-ilovepdf-compressed.pdf · uploaded 27 Jul 2017Source
- 1 Certificates of CA (Form 3)CA Certificate - RERA-ilovepdf-compressed.pdf · uploaded 27 Jul 2017Source
- 1 Proforma of Allotment letterDeclaration RERA-ilovepdf-compressed.pdf · uploaded 27 Jul 2017Source
- 2 Proforma of Allotment letterPROFORMA OF AGREEMENT FOR SALE.pdf · uploaded 5 Oct 2017Source
- 3 Proforma of Allotment letterPROFORMA OF ALLOTMENT LETTER.pdf · uploaded 5 Oct 2017Source
- 1 Certificates of CA (Form 5)CA Certificate ( Form 5 ).pdf · uploaded 28 Jun 2018Source
- 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA Ar Certificate Form 1 for Tower C and D for Period July 17 to Oct 17 dated 4th Nov 20`17.pdf · uploaded 4 Feb 2019Source
- 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA Ar Certificate Form 1 for Tower C and D for Period Nov 17 to Dec 17 dated 5th Jan 2018.pdf · uploaded 4 Feb 2019Source
- 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA Ar Certificate Form 1 for Tower C and D for Period Jan 18 to March 18 dated 5th April 2018.pdf · uploaded 4 Feb 2019Source
- 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA Ar Certificate Form 1 for Tower C and D for Period April 18 to June 18 dated 10th July 2018.pdf · uploaded 4 Feb 2019Source
- 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA Ar Certificate Form 1 for Tower C and D for Period July 18 to Sep 18 dated 13th Nov 2018.pdf · uploaded 4 Feb 2019Source
- 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA Ar Certificate Form 1 for Tower C and D for Period Oct 18 to Dec 18 dated 23rd Jan 2019.pdf · uploaded 4 Feb 2019Source
- 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA Ar Certificate Form 1 for Tower C and D for Period July 17 to Oct 17 dated 4th Nov 20`17.pdf · uploaded 4 Feb 2019Source
- 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA Ar Certificate Form 1 for Tower C and D for Period Nov 17 to Dec 17 dated 5th Jan 2018.pdf · uploaded 4 Feb 2019Source
- 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA Ar Certificate Form 1 for Tower C and D for Period Jan 18 to March 18 dated 5th April 2018.pdf · uploaded 4 Feb 2019Source
- 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA Ar Certificate Form 1 for Tower C and D for Period April 18 to June 18 dated 10th July 2018.pdf · uploaded 4 Feb 2019Source
- 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA Ar Certificate Form 1 for Tower C and D for Period July 18 to Sep 18 dated 13th Nov 2018.pdf · uploaded 4 Feb 2019Source
- 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA Ar Certificate Form 1 for Tower C and D for Period Oct 18 to Dec 18 dated 23rd Jan 2019.pdf · uploaded 4 Feb 2019Source
- 1 Form 2ARERA Engineer Certificate Form 2A Oct 18 to Dec 18 dated 1st Feb 2019.pdf · uploaded 4 Feb 2019Source
- 2 Certificates of CA (Form 3)Rera CA certificate Form 3 For July 17 to Oct 17 dated 7th Nov 2017.pdf · uploaded 4 Feb 2019Source
- 3 Certificates of CA (Form 3)Rera CA certificate Form 3 For Nov 17 to Dec 17 dated 12th Jan 2018.pdf · uploaded 4 Feb 2019Source
- 4 Certificates of CA (Form 3)Rera CA certificate Form 3 For Jan 18 to March 18 dated 2nd June 2018.pdf · uploaded 4 Feb 2019Source
- 5 Certificates of CA (Form 3)Rera CA certificate Form 3 For April 18 to June 18 dated 13th Oct 2018.pdf · uploaded 4 Feb 2019Source
- 6 Certificates of CA (Form 3)Rera CA certificate Form 3 For July 18 to Sep 18 dated 6th Nov 2018.pdf · uploaded 4 Feb 2019Source
- 7 Certificates of CA (Form 3)Rera CA certificate Form 3 For Oct 18 to Dec 18 dated 28th Jan 2019.pdf · uploaded 4 Feb 2019Source
- 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA Ar Certificate Form 1 for Tower C and D for Period Jan 19 to Mar 19 dated 12nd June 2019.pdf · uploaded 18 Jun 2019Source
- 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA Engineer Certificate Form 2A Jan 19 to March 19 dated 15th June 2019.pdf · uploaded 18 Jun 2019Source
- 2 Form 2ARERA Engineer Certificate Form 2A Jan 19 to March 19 dated 15th June 2019.pdf · uploaded 18 Jun 2019Source
- 8 Certificates of CA (Form 3)Rera CA certificate Form 3 For Jan 19 to March 19 dated 13th June 2019.pdf · uploaded 18 Jun 2019Source
- 2 Certificates of CA (Form 5)RERA CA Certificate Form 5 For April 18 to March 19 dated 21st June 2019.pdf · uploaded 24 Jun 2019Source
- 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA Ar Certificate Form 1 for Tower C and D for Period April 19 June 19 dated 23 july 2019.pdf · uploaded 8 Aug 2019Source
- 9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA Engineer Certificate Form 2 April 19 to June 19 dated 23 july 2019.pdf · uploaded 8 Aug 2019Source
- 3 Form 2ARERA Engineer Certificate Form 2A April 19 to June 19 dated 23 july 2019.pdf · uploaded 8 Aug 2019Source
- 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA Ar Certificate form 1 for Tower C and D for period July 19 to Sep 19 dated 23 oct 2019.pdf · uploaded 18 Nov 2019Source
- 10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA Engineer Certificate form 2 for July 19 to Sep 19 dated 12th Nov 2019.pdf · uploaded 18 Nov 2019Source
- 4 Form 2ARERA Engineer Certificate form 2A for July 19 to Sep 19 dated 12 Nov 2019.pdf · uploaded 18 Nov 2019Source
- 9 Certificates of CA (Form 3)RERA CA Certificate Form 3 for April 19 to June 19 dated 19 july 2019.pdf · uploaded 18 Nov 2019Source
- 10 Certificates of CA (Form 3)RERA CA Certificate form 3 for July 19 to Sep 19 dated 6th Nov 19.pdf · uploaded 18 Nov 2019Source
- 11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA Ar Certificate for Tower C and D for Oct 19 to Dec 19 dated 8 Jan 2020.pdf · uploaded 15 Feb 2020Source
- 11 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA Engineer Certificate form 2 for Oct 19 to Dec 19 dated 13 Feb 2019.pdf · uploaded 15 Feb 2020Source
- 5 Form 2ARERA Engineer Certificate form 2A for Oct 19 to Dec 19 dated 13 Feb 2019.pdf · uploaded 15 Feb 2020Source
- 11 Certificates of CA (Form 3)RERA CA Certificate form 3 for oct 19 to Dec 19 dated 3 Feb 2020.pdf · uploaded 15 Feb 2020Source
- 12 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA Ar Certificate for peiod Jan 20 to Mar 20 dated 4 April 2020.pdf · uploaded 6 Oct 2020Source
- 13 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA Ar Certificate for period April 20 to June 20 dated 7 July 2020.pdf · uploaded 6 Oct 2020Source
- 12 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA Engineer Certificate Form 2 Jan 20 to Mar 20 dated 4 July 2020.pdf · uploaded 6 Oct 2020Source
- 13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA Engineer Certificate Form 2 for April 20 to June 20 dated 13 Aug 2020.pdf · uploaded 6 Oct 2020Source
- 6 Form 2ARERA Engineer Certificate Form 2A for Jan 20 to Mar 20 dated 4 July 2020.pdf · uploaded 6 Oct 2020Source
- 7 Form 2ARERA Engineer Certificate Form 2A for April 20 to June 20 dated 13 Aug 2020.pdf · uploaded 6 Oct 2020Source
- 12 Certificates of CA (Form 3)RERA CA Certificate Form 3 for Jan 20 to Mar 20 dated 3 July 2020.pdf · uploaded 6 Oct 2020Source
- 13 Certificates of CA (Form 3)RERA CA Certificate Form 3 for April 20 to June 20 dated 21 Aug 2020.pdf · uploaded 6 Oct 2020Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)RERA CA Certificate Form 5 For April 18 to March 19 dated 21st June 2019.pdf · uploaded 6 Oct 2020Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)RERA CA certificate Form 5 for april 19 to March 20 dated 13 Aug 2020.pdf · uploaded 6 Oct 2020Source
- 4 Proforma of Allotment letterAgreement for Sale-converted.pdf · uploaded 6 Oct 2020Source
- 1 Details of Restarting of Construction work post lockdownRERA Details of Restarting of Construction work post lockdown.pdf · uploaded 6 Oct 2020Source
- 1 OtherRERA Declaration change in Estimated Cost.pdf · uploaded 8 Oct 2020Source
- 14 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA Ar Certificate form 1 for period July 20 to Sep 20 dated 9 October 2020.pdf · uploaded 26 Nov 2020Source
- 14 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA Engineer Certificate form 2 for period July 20 to Sep 20 dated 24 Nov 2020.pdf · uploaded 26 Nov 2020Source
- 8 Form 2ARERA Enginner Cerificate form 2A for period July 20 to Sep 20 dated 24 Nov 2020.pdf · uploaded 26 Nov 2020Source
- 14 Certificates of CA (Form 3)RERA CA Certificate form 3 for period July 20 to Sep 20 dated 13 Nov 2020.pdf · uploaded 26 Nov 2020Source
- 15 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA Ar Certificate Form 1 for Tower C and D for Period Oct 20 to Dec 20 dated 25 Feb 2021.pdf · uploaded 18 Mar 2021Source
- 15 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA Engineer Certificate Form 2 Oct 20 to Dec 20 dated 2nd March 2021.pdf · uploaded 18 Mar 2021Source
- 9 Form 2ARERA Engineer Certificate Form 2A Oct 20 to Dec 20 dated 2nd March 2021.pdf · uploaded 18 Mar 2021Source
- 15 Certificates of CA (Form 3)RERA CA certificate Form 3 for Oct 20 to Dec 20 dated 18 Feb 2021 (NXPowerLite Copy).pdf · uploaded 18 Mar 2021Source
- 1 Declaration about Commencement CertificateRERA Ar Cerificate form 1 for Tower C and D for Period Jan 21 to Mar 21 dated 15 April 2021.pdf · uploaded 12 Jul 2021Source
- 16 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA Engineer Certificate form 2 for period Jan 21 to Mar 21 dated 19 June 2021.pdf · uploaded 12 Jul 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)RERA Engineer Certoificate form 2A for period Jan 21 to Mar 21 dated 19 June 2021.pdf · uploaded 12 Jul 2021Source
- 16 Certificates of CA (Form 3)RERA CA Certificate Form 3 for Jan 21 to Mar 21 dated 30 June 2021.pdf · uploaded 12 Jul 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)RERA CA Certificate Form 5 for April 20 to Mar 21 dated 2 july 2021.pdf · uploaded 12 Jul 2021Source
- 2 Declaration about Commencement CertificateRERA Declaration about commencement Certificate.pdf · uploaded 15 Jul 2021Source
- 16 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA Ar Cerificate form 1 for Tower C and D for Period Jan 21 to Mar 21 dated 15 April 2021.pdf · uploaded 15 Jul 2021Source
- 1 Disclosure of sold/ booked inventoryRERA Sold Booked unsold inventory Tower C and D dated 12 July 2021.pdf · uploaded 15 Jul 2021Source
- 17 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA Ar Certificate form 1 for Tower C and D April 21 to June 21 dated 17 July 2021.pdf · uploaded 12 Aug 2021Source
- 17 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA Engineer Certificate form 2 for period April 21 to June 21 dated 11 August 2021.pdf · uploaded 12 Aug 2021Source
- 10 Form 2ARERA Engineer Certificate form 2A for period April 21 to June 21 dated 11 August 2021.pdf · uploaded 12 Aug 2021Source
- 17 Certificates of CA (Form 3)RERA CA Certificate Form 3 for April 21 to June 21 dated 9 August 2021.pdf · uploaded 12 Aug 2021Source
- 18 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA Ar Certificate form 1 for Tower C and D for period July 21 to Sep 21 dated 2 Oct 2021-21.pdf · uploaded 6 Oct 2021Source
- 19 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA Engineer Certificate Form 2 for period July 21 to Sep 21 dated 6 Oct 2021.pdf · uploaded 6 Oct 2021Source
- 11 Form 2ARERA Engineer Certificate Form 2A for Period July 21 to Sep 21 dated 6 Oct 2021.pdf · uploaded 6 Oct 2021Source
- 18 Certificates of CA (Form 3)RERA CA Certificate Form 3 for Period July 21 to Sep 21 dated 6 Oct 2021.pdf · uploaded 6 Oct 2021Source
- 18 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA Ar Certificate Form 1 for Tower C and D for Period Oct 21 to Dec 21 dated 3 rd Jan 2022 pdf.pdf · uploaded 11 Jan 2022Source
- 20 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA Engineer Certificate Form 2 Oct 21 to Dec 21 dated 10th Jan 2022.pdf · uploaded 11 Jan 2022Source
- 12 Form 2ARERA Engineer Certificate Form 2A Oct 21 to Dec 21 dated 10th Jan 2022.pdf · uploaded 11 Jan 2022Source
- 2 Disclosure of sold/ booked inventoryRERA Sold Booked unsold inventory Tower C and D dated 3rd Jan 2022pdf.pdf · uploaded 11 Jan 2022Source
- 19 Certificates of CA (Form 3)RERA CA certificate Form 3 for Oct 21 to Dec 21 dated 10 Jan 2022 pdf.pdf · uploaded 11 Jan 2022Source
- 19 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA Ar Certificate Form 1 for Tower C and D for Period Jan 22 to March 22 dated 5 April 2022.pdf · uploaded 20 Apr 2022Source
- 20 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA Engineer Certificate Form 2 for Jan 22 to March 22 dated 14 April 2022.pdf · uploaded 20 Apr 2022Source
- 13 Form 2ARERA Engineer Certificate form 2A for period Jan 22 to March 22 dated 14 April 2022.pdf · uploaded 20 Apr 2022Source
- 3 Disclosure of sold/ booked inventoryRERA Sold Booked unsold inventory Tower C and D dated 14th April 2022pdf.pdf · uploaded 20 Apr 2022Source
- 20 Certificates of CA (Form 3)RERA CA Certificate Form 3 for Jan 22 to March 22 dated 14 April 2022.pdf · uploaded 20 Apr 2022Source
- 21 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA Ar Certificate Form 1 for Tower C and D for Period April 22 to June 22 dated 6th July 2022.pdf · uploaded 12 Jul 2022Source
- 21 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA Engineer Certificate Form 2 April 22 to June 22 dated 11 july 2022.pdf · uploaded 12 Jul 2022Source
- 14 Form 2ARERA Engineer Certificate Form 2A April 22 to June 22 dated 11th july 2022.pdf · uploaded 12 Jul 2022Source
- 4 Disclosure of sold/ booked inventoryRERA Sold Booked unsold inventory Tower C and D dated 5th July 2022pdf.pdf · uploaded 12 Jul 2022Source
- 21 Certificates of CA (Form 3)RERA CA Certificate Form 3 for April 22 to June 22 dated 9 July 2022.pdf · uploaded 12 Jul 2022Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)RERA CA Certificate Form 5 For April 21 to March 22 dated 28th Sep 2022.pdf · uploaded 29 Sep 2022Source
- 22 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA Engineer Certificate form 2 for July 22 to Sep 22 dated 12 Oct 2022.pdf · uploaded 22 Oct 2022Source
- 15 Form 2ARERA Engineer Certificate Form 2A for Period July 22 to Sep 22 dated 12 Oct 2022.pdf · uploaded 22 Oct 2022Source
- 5 Disclosure of sold/ booked inventoryRERA Sold Booked unsold inventory Tower C and D dated 30 Sep 2022pdf.pdf · uploaded 22 Oct 2022Source
- 22 Certificates of CA (Form 3)RERA CA Certificate Form 3 for Period July 22 to Sep 22 dated 10 Oct 2022.pdf · uploaded 22 Oct 2022Source
- 22 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA Ar Certificate Form 1 for Tower C and D for Period July 22 to Sep 22 dated 7 th Oct 2022 pdf.pdf · uploaded 27 Oct 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)RERA CA Certificate Form 5 For April 21 to March 22 dated 28th Sep 2022.pdf · uploaded 10 Jan 2023Source
- 1 Proforma of Agreement for saleRERA Proforma Agreement for Sale Tower D.pdf · uploaded 10 Jan 2023Source
- 2 OtherRERA reply in Notice in non submission of documents Form 5 dated 9 Jan 23.pdf · uploaded 10 Jan 2023Source
- 23 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA Ar Certificate Form 1 for Tower C and D for Period July Oct 22 to Dec 22 dated 5 th Jan 2023 pdf.pdf · uploaded 13 Jan 2023Source
- 23 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA Engineer Certificate Form 2 Oct 22 to Dec 22 dated 11 th Jan 2023.pdf · uploaded 13 Jan 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)RERA Engineer Certificate Form 2A Oct 22 to Dec 22 dated 11th Jan 2023.pdf · uploaded 13 Jan 2023Source
- 23 Certificates of CA (Form 3)RERA CA Certificate Form 3 For Oct 22 to Dec 22 dated 12 th Jan 2023.pdf · uploaded 13 Jan 2023Source
- 6 Disclosure of sold/ booked inventoryRERA Sold Booked unsold inventory Tower C and D dated 5 Jan 2023 pdf.pdf · uploaded 17 Jan 2023Source
- 2 Copy of Layout Approval (in case of layout)Revised Layout.pdf · uploaded 30 Mar 2023Source
- 2 Commencement Certificates / NA Order for plotted developmentRevised Commencement Certificate.pdf · uploaded 30 Mar 2023Source
- 24 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA Ar Certificate Form 1 for Tower C and D for Period Jan 23 to March 23 dated 6th April 2023.pdf · uploaded 17 Apr 2023Source
- 24 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA Engineer Certificate Form 2 Jan 23 to March 23 dated 10th April 2023.pdf · uploaded 17 Apr 2023Source
- 16 Form 2ARERA Engineer Certificate Form 2A Jan 23 to March 23 dated 10 th April 2023.pdf · uploaded 17 Apr 2023Source
- 7 Disclosure of sold/ booked inventoryRERA Sold Booked unsold inventory Tower C and D dated 2 April 2023pdf.pdf · uploaded 17 Apr 2023Source
- 24 Certificates of CA (Form 3)Rera CA certificate Form 3 For Jan 23 to March 23 dated 8th April 2023.pdf · uploaded 17 Apr 2023Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOccupancy Certificate for Tower C dated 5 June 23.pdf · uploaded 30 Jun 2023Source
- 25 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA Ar Certificate Form 1 for Tower C and D for Period April 23 to June 23 dated 7th July 2023.pdf · uploaded 19 Jul 2023Source
- 25 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA Engineer Certificate Form 2 April 23 to June 23 dated 13 july 2023.pdf · uploaded 19 Jul 2023Source
- 17 Form 2ARERA Engineer Certificate Form 2A for period April 23 to June 23 dated 13 July 2023.pdf · uploaded 19 Jul 2023Source
- 8 Disclosure of sold/ booked inventoryRERA Sold Booked unsold inventory Tower C and D dated 5 th July 2023.pdf · uploaded 19 Jul 2023Source
- 25 Certificates of CA (Form 3)Rera CA certificate Form 3 For April 23 to June 23 dated 13th July 2023.pdf · uploaded 19 Jul 2023Source
- 3 Certificates of CA (Form 5)RERA CA Certificate Form 5 For April 22 to March 23 dated 4th Sep 2023.pdf · uploaded 13 Sep 2023Source
- 26 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA Ar Certificate form 1 for Tower C and D for period July 23 to Sep 23 dated 10 oct 2023.pdf · uploaded 25 Oct 2023Source
- 26 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA Engineer Certificate form 2 for July 23 to Sep 23 dated 13 Oct 23.pdf · uploaded 25 Oct 2023Source
- 18 Form 2ARERA Enginner Cerificate form 2A for period July 23 to Sep 23 dated 13 Oct 23.pdf · uploaded 25 Oct 2023Source
- 9 Disclosure of sold/ booked inventoryRERA Sold Booked unsold inventory Tower C and D dated 30 Sep 2023pdf.pdf · uploaded 25 Oct 2023Source
- 26 Certificates of CA (Form 3)RERA CA Certificate form 3 for period July 23 to Sep 23 dated 17 oct 2023.pdf · uploaded 25 Oct 2023Source
- 27 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA Ar Certificate Form 1 for Tower C and D for Period Oct 23 to Dec 23 dated 11 th Jan 2024 pdf.pdf · uploaded 18 Jan 2024Source
- 27 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA Engineer Certificate Form 2 Oct 23 to Dec 23 dated 11th Jan 2024.pdf · uploaded 18 Jan 2024Source
- 19 Form 2ARERA Engineer Certificate Form 2A Oct 23 to Dec 23 dated 11th jan 24.pdf · uploaded 18 Jan 2024Source
- 10 Disclosure of sold/ booked inventoryRERA Sold Booked unsold inventory Tower C and D dated 31st Dec 2023 pdf.pdf · uploaded 18 Jan 2024Source
- 27 Certificates of CA (Form 3)Rera CA certificate Form 3 For Oct 23 to Dec 23 dated 11th Jan 2024.pdf · uploaded 18 Jan 2024Source
- 28 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA Ar Certificate Form 1 for Tower C and D for Period Jan 24 to March 24 dated 10th April 2024 pdf.pdf · uploaded 22 Apr 2024Source
- 28 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA Engineer Certificate Form 2 Jan 24 to March 24 dated 10th April 2024.pdf · uploaded 22 Apr 2024Source
- 20 Form 2ARERA Engineer Certificate Form 2A Jan 24 to March 24 dated 10th April 24.pdf · uploaded 22 Apr 2024Source
- 28 Certificates of CA (Form 3)Rera CA certificate Form 3 For Jan 24 to April 24 dated 10th April 2024.pdf · uploaded 22 Apr 2024Source
- 11 Disclosure of sold/ booked inventoryRERA Sold Booked unsold inventory Tower C and D dated 31st March 2024 pdf.pdf · uploaded 8 May 2024Source
- 29 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA Ar Certificate Form 1 for Tower C and D for Period April 24 to June 24 dated 11th July 2024.pdf · uploaded 16 Jul 2024Source
- 29 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA Engineer Certificate Form 2 April 24 to June 24 dated 10th July 2024.pdf · uploaded 16 Jul 2024Source
- 21 Form 2ARERA Engineer Certificate form 2A for period April 24 to June 24 dated 10th July 2024.pdf · uploaded 16 Jul 2024Source
- 12 Disclosure of sold/ booked inventoryRERA Sold Booked unsold inventory Tower C and D dated 30th June 2024pdf.pdf · uploaded 16 Jul 2024Source
- 29 Certificates of CA (Form 3)Rera CA certificate Form 3 For April 24 to June 24 dated 8th July 2024.pdf · uploaded 16 Jul 2024Source
- 2 Declaration in FORM BAffidavit cum Declaration Form B revised dated 12th Aug 2024.pdf · uploaded 13 Aug 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)RERA CA Certificate Form 5 For April 22 to March 23 dated 4th Sep 2023.pdf · uploaded 24 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)RERA CA Certificate Form 5 For April 23 to March 24 dated 20 August 2024.pdf · uploaded 24 Oct 2024Source
- 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA Ar Certificate Form 1 for Tower C and D for Period July 24 to Sep 24 dated 10th Oct 2024.pdf · uploaded 4 Nov 2024Source
- 2 Certificates of CA (Form 3)Rera CA certificate Form 3 For July 24 to Sep 24 dated 10th Oct 2024.pdf · uploaded 4 Nov 2024Source
- 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA Engineer Certificate Form 2 July 24 to Sep 24 dated 10th Oct 2024.pdf · uploaded 4 Nov 2024Source
- 2 Form 2ARERA Engineer Certificate form 2A for period July 24 to Sep 24 dated 10th Oct 2024.pdf · uploaded 4 Nov 2024Source
- 2 Disclosure of sold/ booked inventoryRERA Sold Booked unsold inventory Tower C and D dated 30th Sep 2024pdf.pdf · uploaded 4 Nov 2024Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA Ar Certificate Form 1 for Tower C and D for Period Oct 24 to Dec 24 dated 2nd Jan 2025-compressed.pdf · uploaded 24 Jan 2025Source
- 1 Certificates of CA (Form 3)Rera CA certificate Form 3 For Oct 24 to Dec 24 dated 9th Jan 2025-compressed.pdf · uploaded 24 Jan 2025Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA Engineer Certificate Form 2 OCt 24 to Dec 24 dated 10th Jan 2025-compressed.pdf · uploaded 24 Jan 2025Source
- 1 Form 2ARERA Engineer Certificate form 2A for period Oct 24 to Dec 24 dated 10th Jan 2025-compressed.pdf · uploaded 24 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryRERA Sold Booked unsold inventory Tower C and D dated 31st Dec 2024pdf-compressed.pdf · uploaded 24 Jan 2025Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA Ar Certificate Form 1 for Tower C and D for Period Jan 25 to March 25 dated 9th April 2025-compressed.pdf · uploaded 19 Apr 2025Source
- 1 Certificates of CA (Form 3)Rera CA certificate Form 3 For Jan 25 to March 25 dated 10th April 2025-compressed.pdf · uploaded 19 Apr 2025Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA Engineer Certificate Form 2 Jan 25 to March 25 dated 12th April 2025-compressed.pdf · uploaded 19 Apr 2025Source
- 1 Form 2ARERA Engineer Certificate form 2A for period Jan 25 to March 25 dated 12th April 2025-compressed.pdf · uploaded 19 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryRERA Sold Booked unsold inventory Tower C and D dated 31st March 2025 pdf-compressed.pdf · uploaded 19 Apr 2025Source
- Occupational CertificateOccupancy Certificate for Tower C dated 5th June 2023.pdf · uploaded 17 Jun 2025Source
- Occupational CertificateOccupancy Certificate for Tower D dated 20th May 2025.pdf · uploaded 17 Jun 2025Source
Technical
Technical (Architect)
- DocumentRERA Ar Certificate Form 1 for Tower C and D for Period April 24 to June 24 dated 11th July 2024.pdf · uploaded 16 Jul 2024Source
- DocumentRERA Ar Certificate Form 1 for Tower C and D for Period July 24 to Sep 24 dated 10th Oct 2024.pdf · uploaded 4 Nov 2024Source
- DocumentRERA Ar Certificate Form 1 for Tower C and D for Period Oct 24 to Dec 24 dated 2nd Jan 2025-compressed.pdf · uploaded 24 Jan 2025Source
- DocumentRERA Ar Certificate Form 1 for Tower C and D for Period Jan 25 to March 25 dated 9th April 2025-compressed.pdf · uploaded 19 Apr 2025Source
Technical (Engineer)
- DocumentRERA Engineer Certificate Form 2 April 24 to June 24 dated 10th July 2024.pdf · uploaded 16 Jul 2024Source
- DocumentRERA Engineer Certificate Form 2 July 24 to Sep 24 dated 10th Oct 2024.pdf · uploaded 4 Nov 2024Source
- DocumentRERA Engineer Certificate Form 2 OCt 24 to Dec 24 dated 10th Jan 2025-compressed.pdf · uploaded 24 Jan 2025Source
- DocumentRERA Engineer Certificate Form 2 Jan 25 to March 25 dated 12th April 2025-compressed.pdf · uploaded 19 Apr 2025Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Netivali, Kalyan taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Metro Residency
- South
- Kalyan shil road
- East
- S No 13 part and 17 part
- West
- Metro Plaza
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Lewis & Hickey Design | — |
| Architect | Nirmaan Architects | — |
| Chartered accountant | F R G Company Chartered Accountants | — |
| Chartered accountant | Ravi A Shah & Associates Chartered Accountants | — |
| Engineer | Abrar Ali Sayed | — |
| Other | S D Entreprises | — |
| Other | Shanghavi & Associates Pvt Ltd | — |
| Other | Sunil Services | — |
Show all 22 professionalsShow fewer professionals
| Role | Name | Registration no. |
|---|---|---|
| Other | Urja Building Services Consultant Pvt Ltd | — |
| Registered real estate agent | Beena Anil Kumar Jaiswal | — |
| Registered real estate agent | Dashrath Laxman Kamble | — |
| Registered real estate agent | Jayawant Natha Jadhav | — |
| Registered real estate agent | Mohit Lakshaman Chandwani | — |
| Registered real estate agent | Niket Malsing Londhe | — |
| Registered real estate agent | Nutan Jayawant Jadhav | — |
| Registered real estate agent | Rajesh Vishvavikasrao Sonawane | — |
| Registered real estate agent | Rakesh ANAND PUTHRAN | — |
| Registered real estate agent | Rakesh Singh | — |
| Registered real estate agent | Ramdas Sadashiv Nayak | — |
| Registered real estate agent | Sachin Ramesh Kharve | — |
| Registered real estate agent | Sureshsingh G Kandari | — |
| Registered real estate agent | Vishal Balasaheb Fulwar | — |
Source: MahaRERA project page. Contact details are not shown.