Sai City
Certificate SignedNelje, Thane 421204 |Promoter: Om Sai Builders & Developers
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Buildings
- 2
- Unit types
- 1BHK, 2BHK, Office space, Shop213 units in all
- Address
- SURVEY NO.3/1/E, 3/1/D, 3/1/C, 5/2, 2/5/A, 4/1, node-nilje, kalyanPIN 421204
- Designated bank account
- 82
- Developed in phases
- Yes
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 4 months
- Registered
- 14 Feb 2023
- Promised
- 31 Dec 2031
- Revised
- 30 Apr 2032
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700049444 | 14 Feb 2023 | 31 Dec 2031 | 30 Apr 2032 | Om Sai Builders & Developers | Project page |
2 buildings
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Sai City - Wing A | 23 | 213 |
| Sai City - Wing C | 17 | — |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
113 of 213 units booked (53%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1BHK | 31.26 sq m · 336 sq ft | 17 | 16 |
| 1BHK | 31.38 sq m · 338 sq ft | 34 | 26 |
| 1BHK | 36.5 sq m · 393 sq ft | 50 | 28 |
| 2BHK | 46.3 sq m · 498 sq ft | 17 | 6 |
| 2BHK | 57.55 sq m · 619 sq ft | 48 | 10 |
| 2BHK | 60.52 sq m · 651 sq ft | 17 | 10 |
| Office space | 4.29 sq m · 46 sq ft | 1 | 1 |
| Office space | 12.06 sq m · 130 sq ft | 1 | 0 |
Show all 22 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Office space | 14.82 sq m · 160 sq ft | 1 | 0 |
| Office space | 16.5 sq m · 178 sq ft | 1 | 0 |
| Office space | 17.34 sq m · 187 sq ft | 7 | 0 |
| Office space | 20.06 sq m · 216 sq ft | 1 | 0 |
| Office space | 20.4 sq m · 220 sq ft | 2 | 1 |
| Office space | 22.44 sq m · 242 sq ft | 1 | 0 |
| Shop | 7.5 sq m · 81 sq ft | 1 | 1 |
| Shop | 17 sq m · 183 sq ft | 1 | 1 |
| Shop | 19.02 sq m · 205 sq ft | 1 | 1 |
| Shop | 21.54 sq m · 232 sq ft | 7 | 7 |
| Shop | 21.94 sq m · 236 sq ft | 1 | 1 |
| Shop | 24.92 sq m · 268 sq ft | 1 | 1 |
| Shop | 25.35 sq m · 273 sq ft | 2 | 2 |
| Shop | 27.88 sq m · 300 sq ft | 1 | 1 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
1 document held by Deedo, 139 filings listed on MahaRERA's project page
Finance
- PAN Cardom sai Builder AND Developers pan card.pdf · uploaded 18 Oct 2022Source
Legal
Show all 140 documentsShow fewer documents
Migrated
- 3 Copy of Layout Approval (in case of layout)scan3444_11zon.pdf · uploaded 18 Oct 2022Source
- 4 Copy of Layout Approval (in case of layout)scan3445_11zon.pdf · uploaded 18 Oct 2022Source
- 5 Copy of Layout Approval (in case of layout)scan3446_11zon.pdf · uploaded 18 Oct 2022Source
- 6 Copy of Layout Approval (in case of layout)scan3447_11zon.pdf · uploaded 18 Oct 2022Source
- 7 Copy of Layout Approval (in case of layout)scan3448_11zon.pdf · uploaded 18 Oct 2022Source
- 8 Copy of Layout Approval (in case of layout)scan3450_11zon.pdf · uploaded 18 Oct 2022Source
- 9 Copy of Layout Approval (in case of layout)scan3451_11zon.pdf · uploaded 18 Oct 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentcommencement certificate.pdf · uploaded 18 Oct 2022Source
- 1 Declaration about Commencement CertificateDECLARATION ABOUT COMMENCEMNT CERTIFICATE.pdf · uploaded 18 Oct 2022Source
- 1 Declaration in FORM BFORM B - BUILDER_11zon.pdf · uploaded 18 Oct 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentLAYOUT APPROVAL.pdf · uploaded 21 Oct 2022Source
- 1 Deviation Report with respect to Allotment letterDEVIATION.pdf · uploaded 21 Oct 2022Source
- 1 a Details of encumbrances concerned to FinanceECUMBRANCE FINANCE.pdf · uploaded 28 Oct 2022Source
- 2 a Details of encumbrances concerned to FinanceECUMBRANCE LEGAL.pdf · uploaded 28 Oct 2022Source
- 1 b Details of encumbrances concerned to LegalECUMBRANCE FINANCE.pdf · uploaded 28 Oct 2022Source
- 2 b Details of encumbrances concerned to LegalECUMBRANCE LEGAL.pdf · uploaded 28 Oct 2022Source
- 10 Copy of Layout Approval (in case of layout)scan3450_11zon.pdf · uploaded 28 Oct 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 ARCHITECT'S CERTIFICATE NEW.pdf · uploaded 28 Oct 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENG CERTIFICATE.pdf · uploaded 28 Oct 2022Source
- 1 CERSAI detailsCERSAI_Search_Report_200250699474_For_Asset_Based_Search_27_10_2022_19_36_06_245.pdf · uploaded 28 Oct 2022Source
- 1 Proforma of Allotment letterALLOTMENT LETTER.pdf · uploaded 28 Oct 2022Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDECLARATION ABOUT SEPARATE BANK ACCOUNT.pdf · uploaded 28 Oct 2022Source
- 1 Proforma of Agreement for saleAGREEMENT FOR SALE.pdf · uploaded 19 Nov 2022Source
- 1 Deviation Report with respect to model copy of AgreementDeviation Report new.pdf · uploaded 19 Nov 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Declaration for RERA.pdf · uploaded 14 Dec 2022Source
- 1 Copy of the legal title reportSearch report_11zon.pdf · uploaded 20 Dec 2022Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM-3-merged_organized.pdf · uploaded 24 Dec 2022Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A - Santosh Dixit.pdf · uploaded 16 Jan 2023Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A - Virendra Singh .pdf · uploaded 16 Jan 2023Source
- 2 Copy of the legal title reportLegal title report.pdf · uploaded 3 Feb 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5 FY 22-23.pdf · uploaded 7 Dec 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)sai city Architect Certificate Form-1.pdf · uploaded 8 Dec 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 SIGNED.pdf · uploaded 29 Dec 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM 2A FY 22-23.pdf · uploaded 29 Dec 2023Source
- 1 Disclosure of sold/ booked inventoryDisclosure sold unsold Inventory - Sai City.pdf · uploaded 30 Dec 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 ARCHITECT'S CERTIFICATE (Q4).pdf · uploaded 18 Jan 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 ARCHITECT'S CERTIFICATE (Q1).pdf · uploaded 18 Jan 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 ARCHITECT'S CERTIFICATE (Q2).pdf · uploaded 18 Jan 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 ARCHITECT'S CERTIFICATE (Q3).pdf · uploaded 18 Jan 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 ENGINEERS CERTIFICATE (Q4).pdf · uploaded 18 Jan 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 ENGINEERS CERTIFICATE (Q1).pdf · uploaded 18 Jan 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 ENGINEERS CERTIFICATE (Q3).pdf · uploaded 18 Jan 2024Source
- 2 Disclosure of sold/ booked inventoryDisclosure sold unsold Inventory - DEC_11zon.pdf · uploaded 22 Jan 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM-3 MARCH.pdf · uploaded 22 Jan 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM-3 JUNE.pdf · uploaded 22 Jan 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM-3 SEP.pdf · uploaded 22 Jan 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM-3 DEC.pdf · uploaded 22 Jan 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 ENGINEERS CERTIFICATE Q4.pdf · uploaded 2 Feb 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 ENGINEERS CERTIFICATE Q1.pdf · uploaded 2 Feb 2024Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 ENGINEERS CERTIFICATE Q2.pdf · uploaded 2 Feb 2024Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 ENGINEERS CERTIFICATE Q3.pdf · uploaded 2 Feb 2024Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 ENGINEERS CERTIFICATE.pdf · uploaded 9 Feb 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 20 Apr 2024Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 20 Apr 2024Source
- 3 Disclosure of sold/ booked inventoryDOSBI_11zon.pdf · uploaded 20 Apr 2024Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 ENGINEERS CERTIFICATE Q4.pdf · uploaded 29 May 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 ARCHITECT'S CERTIFICATE Q2 2024.pdf · uploaded 24 Jul 2024Source
- 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engg certificate Q2.pdf · uploaded 24 Jul 2024Source
- 4 Disclosure of sold/ booked inventoryDisclosure sold unsold Inventory JUNE 24_11zon.pdf · uploaded 24 Jul 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A _Quality Assurance Certificate Sai City.pdf · uploaded 13 Aug 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)DocScanner Aug 13, 2024 7-18 PM.pdf · uploaded 13 Aug 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 ARCHITECT'S CERTIFICATE Q3 2024.pdf · uploaded 14 Nov 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engg certificate Q3.pdf · uploaded 14 Nov 2024Source
- 2 Disclosure of sold/ booked inventoryDisclosure sold unsold Inventory - SEP 24_11zon.pdf · uploaded 14 Nov 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 ARCHITECT'S CERTIFICATE Q4 2024.pdf · uploaded 21 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engg certificate Q4.pdf · uploaded 21 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryDisclosure sold unsold Inventory - Sai City (2).pdf · uploaded 21 Jan 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5 FY 23-24.pdf · uploaded 23 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 (1)_11zon.pdf · uploaded 4 Feb 2025Source
- Form 1FORM-1.pdf · uploaded 22 Sep 2025Source
- Form 2Form 2 Engg certificate.pdf · uploaded 22 Sep 2025Source
- Form 3FORM 3 MARCH 25_11zon (1).pdf · uploaded 22 Sep 2025Source
- Disclosure of Sold and Booked InventoryDisclosure sold unsold Inventory - Sai City.pdf · uploaded 22 Sep 2025Source
- Withdrawal Update Form 1FORM 1 SAI CITY - A WING.pdf · uploaded 23 Sep 2025Source
- Withdrawal Update Form 1FORM 1 SAI CITY - A WING.pdf · uploaded 23 Sep 2025Source
- Withdrawal Update Form 1FORM 1 SAI CITY - A WING.pdf · uploaded 23 Sep 2025Source
- Withdrawal Update Form 1FORM 1 SAI CITY - A WING.pdf · uploaded 23 Sep 2025Source
- Withdrawal Update Form 2Form 2 Engg certificate.pdf · uploaded 23 Sep 2025Source
- Withdrawal Update Form 2Form 2 Engg certificate.pdf · uploaded 23 Sep 2025Source
- Withdrawal Update Form 2Form 2 Engg certificate.pdf · uploaded 23 Sep 2025Source
- Withdrawal Update Form 2Form 2 Engg certificate.pdf · uploaded 23 Sep 2025Source
- Withdrawal Update Form 3FORM 3 MARCH 25_11zon (1).pdf · uploaded 23 Sep 2025Source
- Withdrawal Update Form 3FORM 3 MARCH 25_11zon (1).pdf · uploaded 23 Sep 2025Source
- Withdrawal Update Form 3FORM 3 MARCH 25_11zon (1).pdf · uploaded 23 Sep 2025Source
- Withdrawal Update Form 3FORM 3 MARCH 25_11zon (1).pdf · uploaded 23 Sep 2025Source
- Form 5 (FY 2024-2025)FORM 5 FY 24-25.pdf · uploaded 4 Dec 2025Source
- Withdrawal Update Form 1A Wing Form 1 June 25.pdf · uploaded 31 Jan 2026Source
- Withdrawal Update Form 1Form 1_Sep 25.pdf · uploaded 31 Jan 2026Source
- Withdrawal Update Form 2Form 2_June 25.pdf · uploaded 31 Jan 2026Source
- Withdrawal Update Form 2Form 2_Sep 25.pdf · uploaded 31 Jan 2026Source
- Withdrawal Update Form 3Form 3_June 25.pdf · uploaded 31 Jan 2026Source
- Withdrawal Update Form 3Form 3_Sep 25.pdf · uploaded 31 Jan 2026Source
- Withdrawal Update Form 1Form 1_Dec 25.pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 1Form 1_Dec 25.pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 2Form 2_Sep 25.pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 2Form 2_Dec 25.pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 3Form 3_Dec 25.pdf · uploaded 3 Feb 2026Source
- Withdrawal Update Form 3Form 3_Dec 25.pdf · uploaded 3 Feb 2026Source
- Form 2A (FY 2024-2025)Sai City Form 2A 2024-25.pdf · uploaded 17 Mar 2026Source
- Withdrawal Update Form 1Form 1 Mar 26.pdf · uploaded 20 Jun 2026Source
- Withdrawal Update Form 2FORM-2 mar 26.pdf · uploaded 20 Jun 2026Source
- Withdrawal Update Form 3FORM-3 MAR 26.pdf · uploaded 20 Jun 2026Source
Technical
- Documentscan3442_11zon.pdf · uploaded 18 Oct 2022Source
- Documentscan3443_11zon.pdf · uploaded 18 Oct 2022Source
- Documentscan3444_11zon.pdf · uploaded 18 Oct 2022Source
- Documentscan3445_11zon.pdf · uploaded 18 Oct 2022Source
- Documentscan3446_11zon.pdf · uploaded 18 Oct 2022Source
- Documentscan3447_11zon.pdf · uploaded 18 Oct 2022Source
- Documentscan3448_11zon.pdf · uploaded 18 Oct 2022Source
- Documentscan3450_11zon.pdf · uploaded 18 Oct 2022Source
- Documentscan3451_11zon.pdf · uploaded 18 Oct 2022Source
- DocumentLAYOUT APPROVAL.pdf · uploaded 21 Oct 2022Source
- Documentscan3450_11zon.pdf · uploaded 28 Oct 2022Source
- DocumentBlue Print 1_11zon.pdf · uploaded 27 Sep 2025Source
- DocumentBlue Print 2.pdf · uploaded 27 Sep 2025Source
- DocumentBlue Print 3.pdf · uploaded 27 Sep 2025Source
- DocumentBlue Print 4.pdf · uploaded 27 Sep 2025Source
- DocumentBlue Print 5.pdf · uploaded 27 Sep 2025Source
- DocumentBlue Print 6.pdf · uploaded 27 Sep 2025Source
- DocumentBlue Print 7.pdf · uploaded 27 Sep 2025Source
- DocumentBlue Print 8_11zon.pdf · uploaded 27 Sep 2025Source
- DocumentBlue Print 9.pdf · uploaded 27 Sep 2025Source
- DocumentBlue Print 10.pdf · uploaded 27 Sep 2025Source
- DocumentBlue Print 11.pdf · uploaded 27 Sep 2025Source
- DocumentBlue Print 12.pdf · uploaded 27 Sep 2025Source
- DocumentBlue Print 13.pdf · uploaded 27 Sep 2025Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In nelje, Kalyan taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Sr No-218
- South
- Sr No-219 Hissa No -01
- East
- Sarvoday School
- West
- Kalyan Shill Road
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Destination Architecture Interior Designs | — |
| Chartered accountant | Ashok T Upadhye | — |
| Chartered accountant | R B Singh & Associates | — |
| Engineer | Rohit Chavan | — |
| Engineer | Shravani Consultants | — |
Source: MahaRERA project page. Contact details are not shown.