Shree Krishna Dham

Active

Mira Bhayandar (M Corp.), Thane 401101 |Promoter: Sawariya Construction Co

Residential / Group HousingRERAP51700055615
4 Apr 2024Registered with MahaRERA
31 Dec 2024Promised completion
31 Dec 2026Revised completionPushed back 2 years
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Active
Buildings
1
Land area for this project
503 sq m (5,410 sq ft)
Permissible built-up area
1,212 sq m (13,048 sq ft)
Sanctioned built-up area
1,212 sq m (13,048 sq ft)
Address
Cts No 647, 648, 649, 650, 651, 652, Ram Madnir Road, BhayandarPIN 401101
Designated bank account
Model Cooperative Bank Ltd
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Shree Krishna Dham is at latitude 0.00000, longitude 0.00000.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 2 years

Registered
4 Apr 2024
Promised
31 Dec 2024
Revised
31 Dec 2026

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P517000556154 Apr 202431 Dec 202431 Dec 2026Sawariya Construction CoProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Shree Krishna Dham8—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space000041

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Shree Krishna Dham

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure38%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyAFTER BUILDING COMPLETION0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)AFTER BUILDING COMPLETION0%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingAS SPECIFIED BY MBMC0%
  • Street LightingNot applicable
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterAFTER BUILDING COMPLETION0%
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAS SPECIFIED BY MBMC0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsAFTER BUILDING COMPLETION0%
  • Electrical meter room, sub-station, receiving stationAFTER BUILDING COMPLETION0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

28 documents held by Deedo, 27 filings listed on MahaRERA's project page

Form B

Allotment letter (2)

Encumbrance details (3)

Commencement certificate (3)

Show all 55 documentsShow fewer documents

Commencement certificate (3)

Form 1

Other (13)

Title report

Registration certificate

Extension certificate

Layout plan

Building plan

Document library

  • a Details of encumbrances concerned to FinanceFinance Encumbrance.pdf · uploaded 30 Sep 2023View
  • b Details of encumbrances concerned to LegalFinance Encumbrance.pdf · uploaded 30 Sep 2023View
  • Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 30 Sep 2023View
  • Building Plan Approval / NA Order for plotted developmentBldg Plan_compressed.pdf · uploaded 30 Sep 2023View
  • Commencement Certificates / NA Order for plotted developmentC C Copy.pdf · uploaded 30 Sep 2023View
  • Commencement Certificates / NA Order for plotted developmentCC-1.pdf · uploaded 30 Sep 2023View
  • Declaration about Commencement CertificateCC Declaration.pdf · uploaded 30 Sep 2023View
  • Declaration in FORM BForm B.pdf · uploaded 30 Sep 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form1.pdf · uploaded 30 Sep 2023View
  • CERSAI detailsCersai.pdf · uploaded 30 Sep 2023View
  • Disclosure of Interest in Other Real Estate OrganizationsScanner Sushil verma .pdf · uploaded 30 Sep 2023View
  • Proforma of Allotment letterAllotment Letter_compressed.pdf · uploaded 30 Sep 2023View
  • Deviation Report with respect to Allotment letterAgreement Letter-Deviation.pdf · uploaded 30 Sep 2023View
  • Deviation Report with respect to model copy of AgreementAgreement Letter-Deviation.pdf · uploaded 30 Sep 2023View
  • Disclosure of Interest in Other Real Estate OrganizationsScanner Ravi Vyas .pdf · uploaded 29 Feb 2024View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the same1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the same.pdf · uploaded 29 Feb 2024View
  • Copy of the legal title reportTitle Certificate.pdf · uploaded 29 Feb 2024View
  • Proforma of Agreement for saleRera Draft Agreement- Savariya Construction Co.pdf · uploaded 29 Feb 2024View
  • a Details of encumbrances concerned to Finance1 b Details of encumbrances concerned to Legal.pdf · uploaded 20 Mar 2024View
  • b Details of encumbrances concerned to Legal1 b Details of encumbrances concerned to Legal.pdf · uploaded 20 Mar 2024View
  • Other – LegalPartnership Deed.pdf · uploaded 20 Mar 2024View

Promoter documents

  • Declaration Form BForm B.pdf · uploaded 30 Sep 2023View
  • Legal Title reportTitle Certificate.pdf · uploaded 29 Feb 2024View

Technical documents

  • Layout ApprovalLayout.pdfView
  • Building Plan ApprovalBldg Plan_compressed.pdfView

Other legal documents

  • Other – LegalPartnership Deed.pdfView

Proforma allotment letter

  • Proforma allotment letterAllotment Letter_compressed.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Mira-Bhayandar (M Corp.), Thane taluka

Survey, CTS, gat or plot numbers

647648648648649649649650650650651651651652652652CTS NO 647CTS NO 647

As published on MahaRERA's project page

CTS NO 647,648,649,650,651,652

Boundaries

North
Uma Govind Bldg
South
Yash Datt Bunglow
East
Ekveera Tower
West
Gajanan Bhavan

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectMario E Correa—
Chartered accountantR D Lukad—
EngineerProtech Consultant—

Source: MahaRERA project page. Contact details are not shown.

Data through11 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology