Deepak Apartment

Lapsed

Mira Bhayandar (M Corp.), Thane 401105 |Promoter: Silver & Rashi Constructions

Residential / Group HousingRERAP51700009414
22 Aug 2017Registered with MahaRERA
25 Dec 2018Promised completion
31 Aug 2024Revised completionPushed back 5 years and 8 months
2Buildings
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Lapsed
Buildings
2
Land area for this project
854 sq m (9,191 sq ft)
Permissible built-up area
1,144 sq m (12,309 sq ft)
Sanctioned built-up area
0 sq m (0 sq ft)
Recreational open space
392 sq m (4,224 sq ft)
Address
New 54 H No 6 And 7PIN 401105
Designated bank account
Idbi Bank
Litigation declared by promoter
Yes
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.28552, 72.86930
Deepak Apartment is at latitude 19.28552, longitude 72.86930.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 5 years and 8 months

The latest completion date on record passed 2 years and 2 months ago.

Registered
22 Aug 2017
Promised
25 Dec 2018
Revised
31 Aug 2024

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5170000941422 Aug 201725 Dec 201831 Aug 2024Silver & Rashi ConstructionsProject page

2 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Building (P51700009414)——
Deepak Apartment9—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Deepak Apartment

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyGV PIPES0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)CONCRET0%
  • Storm Water DrainsCONCRET0%
  • Landscaping & Tree PlantingGRASS20%
  • Street LightingELECTICAL FITTING100%
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingCONCRET0%
  • Energy managemcntMETER ROOM0%
  • Fire protection and fire safety requirementsFIRE FIGTING EQUIPMENT0%
  • Electrical meter room, sub-station, receiving stationCONCRET50%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

26 documents held by Deedo, 29 filings listed on MahaRERA's project page

Form 1 (3)

Form 2 (3)

Title report

Encumbrance details

Show all 55 documentsShow fewer documents

Form B

Registration certificate

Commencement certificate (3)

Other (3)

Form 2A (2)

Form 5 (5)

Extension certificate

Layout plan

Allotment letter

Document library

  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM NO 1.pdf · uploaded 11 Aug 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM NO 2.pdf · uploaded 11 Aug 2017View
  • Building Plan Approval (IOD)plan - location and approved.pdf · uploaded 12 Aug 2017View
  • Copy of Layout Approval (in case of layout)plan - location and approved.pdf · uploaded 12 Aug 2017View
  • Declaration in FORM BFORM NO B AFFIDAVIT.pdf · uploaded 12 Aug 2017View
  • Copy of the legal title reportTITLE CERTIFICATE-FINAL.pdf · uploaded 12 Aug 2017View
  • Proforma of Allotment letterDRAFT AGREEMENT FINAL-RERA-OK-1.pdf · uploaded 12 Aug 2017View
  • Details of encumbrancesENCUBRANCES LETTER.pdf · uploaded 12 Aug 2017View
  • Commencement Certificates / NA Order for plotted developmentC C deepak apartment - final CC.pdf · uploaded 15 Nov 2019View
  • Disclosure of sold/ booked inventoryDisclosure - Copy.pdf · uploaded 10 Mar 2022View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 - Copy.pdf · uploaded 10 Mar 2022View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 - Copy.pdf · uploaded 10 Mar 2022View
  • Commencement Certificates / NA Order for plotted developmentDeepak CC (1).pdf · uploaded 12 Mar 2022View
  • Declaration about Commencement CertificateFormat D - Copy.pdf · uploaded 12 Mar 2022View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)Form 5 - Deepak 18.pdf · uploaded 12 Mar 2022View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form 5 - Deepak 19.pdf · uploaded 12 Mar 2022View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5 - Deepak 20.pdf · uploaded 12 Mar 2022View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 - Deepak 21.pdf · uploaded 12 Mar 2022View
  • CERSAI detailsCERSAI REPORT - Deepak.pdf · uploaded 12 Mar 2022View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 1 - Copy (1).pdf · uploaded 12 Mar 2022View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 - Deepak 22.pdf · uploaded 25 Mar 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)form 2a deepak.pdf · uploaded 23 Aug 2023View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)form 1 deepak.pdf · uploaded 23 Aug 2023View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)form 2 deepak.pdf · uploaded 23 Aug 2023View

Promoter documents

  • Declaration Form BFORM NO B AFFIDAVIT.pdf · uploaded 12 Aug 2017View
  • Legal Title reportTITLE CERTIFICATE-FINAL.pdf · uploaded 12 Aug 2017View

Technical documents

  • Building Plan Approvalplan - location and approved.pdfView
  • Layout Approvalplan - location and approved.pdfView

Proforma allotment letter

  • Proforma allotment letterDRAFT AGREEMENT FINAL-RERA-OK-1.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Mira-Bhayandar (M Corp.), Thane taluka

Survey, CTS, gat or plot numbers

77NEW 54 H NO 6NEW 54 H NO 6

As published on MahaRERA's project page

NEW 54 H NO 6 AND 7

Boundaries

North
H No 8
South
H No 5
East
Road
West
H No 3

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectB A C Planners & Engineers Pvt Ltd—

Source: MahaRERA project page. Contact details are not shown.