Bhoomi Icon
Certificate SignedKoparkharane, Thane 400709 |Promoter: Fornax Realty
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Mixed
- Status on MahaRERA
- Certificate Signed
- RERA registrations
- 2
- Phases
- 2
- Buildings
- 2
- Unit types
- 2BHK, Office space, Shop, —196 units in all
- Address
- Plot No 28a, Plot No 28a, Sector 9, Kopar KhairanePIN 400709
- Designated bank account
- 76
- Developed in phases
- No
Location
Coordinates as published by MahaRERA
Also registered as
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 4 months
P51700026412- Registered
- 17 Sep 2020
- Promised
- 30 Jun 2026
- Revised
- 30 Oct 2026
Completion pushed back 4 months
PM1331012600795- Registered
- 15 Jun 2026
- Promised
- 31 Mar 2030
- Revised
- 31 Jul 2030
2 RERA registrations
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700026412 | 17 Sep 2020 | 30 Jun 2026 | 30 Oct 2026 | Fornax Realty | Project page |
| PM1331012600795 | 15 Jun 2026 | 31 Mar 2030 | 31 Jul 2030 | Fornax Realty | Project page |
2 buildings
Buildings and wings named in the registration
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
48 of 196 units booked (24%), as the promoter reported to MahaRERA
| RERA | Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|---|
| P51700026412 | A Wing | 2BHK | 57.56 sq m · 620 sq ft | 17 | 13 |
| P51700026412 | A Wing | 2BHK | 58.26 sq m · 627 sq ft | 17 | 14 |
| P51700026412 | A Wing | 2BHK | 59.41 sq m · 639 sq ft | 17 | 3 |
| P51700026412 | A Wing | 2BHK | 59.7 sq m · 643 sq ft | 17 | 9 |
| P51700026412 | A Wing | Office space | 18.39 sq m · 198 sq ft | 1 | 1 |
| P51700026412 | A Wing | Office space | 18.79 sq m · 202 sq ft | 1 | 1 |
| P51700026412 | A Wing | Office space | 19.18 sq m · 206 sq ft | 1 | 1 |
| P51700026412 | A Wing | Office space | 19.37 sq m · 208 sq ft | 1 | 1 |
Show all 25 unit rowsShow fewer unit rows
| RERA | Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|---|
| P51700026412 | A Wing | Office space | 20.25 sq m · 218 sq ft | 1 | 1 |
| P51700026412 | A Wing | Office space | 25.05 sq m · 270 sq ft | 1 | 0 |
| P51700026412 | A Wing | Office space | 25.8 sq m · 278 sq ft | 1 | 1 |
| P51700026412 | A Wing | Office space | 32.99 sq m · 355 sq ft | 1 | 0 |
| P51700026412 | A Wing | Office space | 34.15 sq m · 368 sq ft | 1 | 1 |
| P51700026412 | A Wing | Office space | 77.92 sq m · 839 sq ft | 1 | 0 |
| P51700026412 | A Wing | Shop | 13.71 sq m · 148 sq ft | 1 | 0 |
| P51700026412 | A Wing | Shop | 25.8 sq m · 278 sq ft | 1 | 0 |
| P51700026412 | A Wing | Shop | 25.8 sq m · 278 sq ft | 1 | 1 |
| P51700026412 | A Wing | Shop | 30.32 sq m · 326 sq ft | 1 | 0 |
| P51700026412 | A Wing | Shop | 30.71 sq m · 331 sq ft | 1 | 1 |
| P51700026412 | A Wing | Shop | 39.8 sq m · 428 sq ft | 1 | 0 |
| P51700026412 | A Wing | Shop | 49.32 sq m · 531 sq ft | 1 | 0 |
| P51700026412 | A Wing | Shop | 49.72 sq m · 535 sq ft | 1 | 0 |
| P51700026412 | A Wing | Shop | 59.51 sq m · 641 sq ft | 1 | 0 |
| P51700026412 | A Wing | Shop | 77.88 sq m · 838 sq ft | 1 | 0 |
| PM1331012600795 | B Wing | — | — | 108 | — |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
3 documents held by Deedo, 284 filings listed on MahaRERA's project page
Registration certificate (2)
Finance
Show all 287 documentsShow fewer documents
Legal
- Declaration Form BP51700026412 · FORM B AMBALAL JIVAN CHAMARIYA.pdf · uploaded 15 Sep 2020Source
- Declaration Form BP51700026412 · FORM B JASAWANTKUMAR JAIN.pdf · uploaded 15 Sep 2020Source
- Declaration Form BP51700026412 · FORM B PUNJA NARAN MENAT.pdf · uploaded 15 Sep 2020Source
- Declaration Form BP51700026412 · FORM B Affidavit Developer Final 17 05 2024_11zon.pdf · uploaded 23 May 2024Source
- OthersPM1331012600795 · Declaration about CC.pdf · uploaded 24 Mar 2026Source
- Declaration Form BPM1331012600795 · FORM B.pdf · uploaded 24 Mar 2026Source
- Declaration Form BPM1331012600795 · 1) Amalgamation -Modfiy Agreement 28A and 28B-1-10.pdf · uploaded 24 Mar 2026Source
- Declaration Form BPM1331012600795 · 2) Amalgamation -Modfiy Agreement 28A and 28B-11-20.pdf · uploaded 24 Mar 2026Source
- Declaration Form BPM1331012600795 · 3) Amalgamation -Modfiy Agreement 28A and 28B-21-30.pdf · uploaded 24 Mar 2026Source
- Declaration Form BPM1331012600795 · 4) Amalgamation -Modfiy Agreement 28A and 28B-31-36.pdf · uploaded 24 Mar 2026Source
- Declaration Form BPM1331012600795 · AGREEMENT TO LEASE 28B.pdf · uploaded 24 Mar 2026Source
- Declaration Form BPM1331012600795 · CIDCO ALLOTMENT LETTER 28B.pdf · uploaded 24 Mar 2026Source
- OthersPM1331012600795 · Disclosure of Interest in Other Real Estate Organisation 17 04 2026.pdf · uploaded 17 Apr 2026Source
- OthersPM1331012600795 · Disclosure of Interest in Other Real Estate Organisation 17 04 2026.pdf · uploaded 17 Apr 2026Source
- Declaration Form BPM1331012600795 · Legal Title Report 06 05 2026.pdf · uploaded 7 May 2026Source
- Declaration Form BP51700026412 · Legal Title Report 06 05 2026.pdf · uploaded 7 May 2026Source
- Declaration Form BP51700026412 · 1) Amalgamation -Modfiy Agreement 28A and 28B-1-10.pdf · uploaded 7 May 2026Source
- Declaration Form BP51700026412 · 2) Amalgamation -Modfiy Agreement 28A and 28B-11-20.pdf · uploaded 7 May 2026Source
- Declaration Form BP51700026412 · 3) Amalgamation -Modfiy Agreement 28A and 28B-21-30.pdf · uploaded 7 May 2026Source
- Declaration Form BP51700026412 · 4) Amalgamation -Modfiy Agreement 28A and 28B-31-36.pdf · uploaded 7 May 2026Source
- Declaration Form BP51700026412 · FORNAX AGREEMENT TO LEASE PLOT NO 35 no use.pdf · uploaded 7 May 2026Source
- Declaration Form BP51700026412 · RECTIFICATION DEED 28A_11zon.pdf · uploaded 7 May 2026Source
- Declaration Form BP51700026412 · Sanction Plan Highlighted.pdf · uploaded 7 May 2026Source
- Declaration Form BP51700026412 · Form B 21 05 2026.pdf · uploaded 23 May 2026Source
- Declaration Form BP51700026412 · FSI AREA A wing _Total Plot AREA Highlighted 27 05 2026.pdf · uploaded 27 May 2026Source
- Declaration Form BP51700026412 · Document No 4805 2026 3rd Modified Agreement.pdf · uploaded 7 Jul 2026Source
- Declaration Form BP51700026412 · Document No 13584 2023 AGREEMENT TO LEASE 28B.pdf · uploaded 7 Jul 2026Source
- Declaration Form BP51700026412 · Document No 14785 2023 SUPPLIMENTARY DEED 28A PART 1.pdf · uploaded 7 Jul 2026Source
- Declaration Form BP51700026412 · Document No 14785 2023 SUPPLIMENTARY DEED 28A PART 2.pdf · uploaded 7 Jul 2026Source
Migrated
- 1 PAN CardP51700026412 · PAN CARD.pdf · uploaded 15 Sep 2020Source
- 1 Copy of the legal title reportP51700026412 · SEARCH REPORT.pdf · uploaded 15 Sep 2020Source
- 2 Copy of the legal title reportP51700026412 · TITLE CERTIFICATE.pdf · uploaded 15 Sep 2020Source
- 1 Details of encumbrancesP51700026412 · Encumbrance letter.pdf · uploaded 15 Sep 2020Source
- 1 Copy of Layout Approval (in case of layout)P51700026412 · PLAN LAYOUT APPROVAL GROUND TO THIRD.pdf · uploaded 15 Sep 2020Source
- 2 Copy of Layout Approval (in case of layout)P51700026412 · PLAN LAYOUT APPROVAL FIFTH TO THITEEN.pdf · uploaded 15 Sep 2020Source
- 3 Copy of Layout Approval (in case of layout)P51700026412 · PLAN LAYOUT APPROVAL FORTEEN AND WHOLE.pdf · uploaded 15 Sep 2020Source
- 1 Building Plan Approval / NA Order for plotted developmentP51700026412 · Building Plan Approval.pdf · uploaded 15 Sep 2020Source
- 1 Commencement Certificates / NA Order for plotted developmentP51700026412 · Commencement Certificates.pdf · uploaded 15 Sep 2020Source
- 1 Declaration in FORM BP51700026412 · FORM B AMBALAL JIVAN CHAMARIYA.pdf · uploaded 15 Sep 2020Source
- 2 Declaration in FORM BP51700026412 · FORM B JASAWANTKUMAR JAIN.pdf · uploaded 15 Sep 2020Source
- 3 Declaration in FORM BP51700026412 · FORM B PUNJA NARAN MENAT.pdf · uploaded 15 Sep 2020Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700026412 · FORM 1 ARCHITECT CERTIFICATE.pdf · uploaded 15 Sep 2020Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700026412 · FORM 2 ENGINEER CERTIFICATE.pdf · uploaded 15 Sep 2020Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700026412 · FORM 3 CA CERTIFICATE.pdf · uploaded 15 Sep 2020Source
- 1 Proforma of Allotment letterP51700026412 · Proforma of the allotment letter and agreement for sale.pdf · uploaded 15 Sep 2020Source
- 4 Copy of Layout Approval (in case of layout)P51700026412 · Aprroved Plan Ground Floor_compressed.pdf · uploaded 18 Nov 2022Source
- 5 Copy of Layout Approval (in case of layout)P51700026412 · Aprroved Plan 1st Floor_compressed.pdf · uploaded 18 Nov 2022Source
- 6 Copy of Layout Approval (in case of layout)P51700026412 · Aprroved Plan 2nd to 14th Floor_compressed.pdf · uploaded 18 Nov 2022Source
- 7 Copy of Layout Approval (in case of layout)P51700026412 · Aprroved Plan -Terrace_compressed.pdf · uploaded 18 Nov 2022Source
- 2 Commencement Certificates / NA Order for plotted developmentP51700026412 · COMMENCEMENT CERTIFICATE.pdf · uploaded 18 Nov 2022Source
- 1 Declaration about Commencement CertificateP51700026412 · COMMENCEMENT CERTIFICATE.pdf · uploaded 18 Nov 2022Source
- 2 Declaration about Commencement CertificateP51700026412 · DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf · uploaded 18 Nov 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700026412 · Form 1 Architects Certificate_compressed.pdf · uploaded 18 Nov 2022Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700026412 · Form 2 Engineers Certificate_compressed.pdf · uploaded 18 Nov 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P51700026412 · Form 2A FY 2020-21.pdf · uploaded 18 Nov 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P51700026412 · Form 2A FY 2021-22.pdf · uploaded 18 Nov 2022Source
- 1 Disclosure of sold/ booked inventoryP51700026412 · DISCLOSURE OF SOLD INVENTORY.pdf · uploaded 18 Nov 2022Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700026412 · FORM-3 CA CERTIFICATE Compressed.pdf · uploaded 18 Nov 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P51700026412 · Form 5 FY 2020-21.pdf · uploaded 18 Nov 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P51700026412 · Form 5 FY 2021-22.pdf · uploaded 18 Nov 2022Source
- 1 Proforma of Agreement for saleP51700026412 · Proforma of Agreement for sale.pdf · uploaded 18 Nov 2022Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700026412 · FORM I.pdf · uploaded 9 Feb 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700026412 · FORM II.pdf · uploaded 9 Feb 2023Source
- 2 Disclosure of sold/ booked inventoryP51700026412 · Sold Unsold Inventory Details.pdf · uploaded 9 Feb 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700026412 · FORM III_compressed.pdf · uploaded 9 Feb 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700026412 · FORM 1.pdf · uploaded 12 Jul 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700026412 · FORM 2.pdf · uploaded 12 Jul 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P51700026412 · Form 2A.pdf · uploaded 12 Jul 2023Source
- 3 Disclosure of sold/ booked inventoryP51700026412 · DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf · uploaded 12 Jul 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700026412 · FORM 3_compressed.pdf · uploaded 12 Jul 2023Source
- 2 Details of encumbrancesP51700026412 · ENCUMBRANCE CERTIFICATE.pdf · uploaded 24 Nov 2023Source
- 8 Copy of Layout Approval (in case of layout)P51700026412 · APPROVED PLAN GRND TO 19TH FLOOR-1_compressed.pdf · uploaded 24 Nov 2023Source
- 9 Copy of Layout Approval (in case of layout)P51700026412 · APPROVED PLAN GRND TO 19TH FLOOR-2_compressed.pdf · uploaded 24 Nov 2023Source
- 10 Copy of Layout Approval (in case of layout)P51700026412 · APPROVED PLAN GRND TO 19TH FLOOR-3_compressed.pdf · uploaded 24 Nov 2023Source
- 11 Copy of Layout Approval (in case of layout)P51700026412 · APPROVED PLAN GRND TO 19TH FLOOR-4_compressed.pdf · uploaded 24 Nov 2023Source
- 12 Copy of Layout Approval (in case of layout)P51700026412 · APPROVED PLAN GRND TO 19TH FLOOR-5_compressed.pdf · uploaded 24 Nov 2023Source
- 3 Commencement Certificates / NA Order for plotted developmentP51700026412 · Revised Commencement Certifcate.pdf · uploaded 24 Nov 2023Source
- 3 Declaration about Commencement CertificateP51700026412 · DECLARATION ABOUT COMMENCEMNT CERTIFICATE.pdf · uploaded 24 Nov 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700026412 · FORM 1.pdf · uploaded 24 Nov 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700026412 · FORM 2_compressed.pdf · uploaded 24 Nov 2023Source
- 4 Disclosure of sold/ booked inventoryP51700026412 · SOLD UNSOLD INVENTORY.pdf · uploaded 24 Nov 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700026412 · FORM 3-compressed.pdf · uploaded 24 Nov 2023Source
- 2 Proforma of Agreement for saleP51700026412 · Draft Sale Agreement.pdf · uploaded 24 Nov 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700026412 · FORM 1.pdf · uploaded 12 Jan 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700026412 · FORM 2 A G GOKHALE.pdf · uploaded 12 Jan 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700026412 · Form 3 CA Certificate_.pdf · uploaded 12 Jan 2024Source
- 4 Declaration in FORM BP51700026412 · FORM B Affidavit Developer Final 17 05 2024_11zon.pdf · uploaded 23 May 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700026412 · FORM 1-Architech Certificate 31 12 2023.pdf · uploaded 23 May 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700026412 · FORM 1 as on 31 03 2024.pdf · uploaded 23 May 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700026412 · FORM 2 31 12 2023 P.pdf · uploaded 23 May 2024Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700026412 · FORM 2 31 03 2024.pdf · uploaded 23 May 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P51700026412 · FORM 2A Quality Assurance certificate NEW 31 03 2023.pdf · uploaded 23 May 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P51700026412 · FORM 2A Quality Assurance certificate NEW 31 03 2024.pdf · uploaded 23 May 2024Source
- 1 CERSAI detailsP51700026412 · CERSAI_Search_Report_200306627320_For_Asset_Based_Search_14_05_2024_20_46_05_454.pdf · uploaded 23 May 2024Source
- 5 Disclosure of sold/ booked inventoryP51700026412 · Sold Inventory-Final_11zon.pdf · uploaded 23 May 2024Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsP51700026412 · RERA Disclosure -JJ.pdf · uploaded 23 May 2024Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsP51700026412 · RERA Disclosure P.pdf · uploaded 23 May 2024Source
- 3 Disclosure of Interest in Other Real Estate OrganizationsP51700026412 · RERA Disclosure-AC.pdf · uploaded 23 May 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P51700026412 · FORNAX REALTY FORM 5 AS ON 31 03 2023.pdf · uploaded 23 May 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P51700026412 · FORNAX REALTY FORM 5 AS ON 31 03 2024.pdf · uploaded 23 May 2024Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP51700026412 · Declaration about seperate bank for real estate project.pdf · uploaded 23 May 2024Source
- 2 CERSAI detailsP51700026412 · CERSAI_Search_Report_200308005583_For_Debtor_Based_Search_final.pdf · uploaded 24 May 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700026412 · FORM 3_as on 31 12 2023.pdf · uploaded 24 May 2024Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700026412 · FORM 3 as on 31 03 2024.pdf · uploaded 24 May 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700026412 · FORM 1 as on 30 06 2024.pdf · uploaded 8 Nov 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700026412 · Form 3 as on 30 06 2024_compressed.pdf · uploaded 8 Nov 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700026412 · FORM 2 as on 30 06 2024.pdf · uploaded 8 Nov 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700026412 · FORM 1 ARCHITECT CERTIFICATE 30 09 24.pdf · uploaded 16 Nov 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700026412 · FORM 2 ENGINEERS CERTIFICATE 30 09 2024.pdf · uploaded 16 Nov 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700026412 · FORM 1 ARCHITECT CERTIFICATE 30 09 24.pdf · uploaded 16 Nov 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700026412 · FORM 2 ENGINEERS CERTIFICATE 30 09 2024.pdf · uploaded 16 Nov 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700026412 · FORM 3 Q2 30 09 2024_11zon.pdf · uploaded 27 Dec 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700026412 · FORM 1 Architect Certificate-31 12 2024.pdf · uploaded 5 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700026412 · FORM 3 - 31 12 2024_11zon.pdf · uploaded 5 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700026412 · FORM 2-Engineer's Certificate.pdf · uploaded 5 Feb 2025Source
- Form 1P51700026412 · FORM 1 as on 31 03 2025.pdf · uploaded 5 Jun 2025Source
- Form 2P51700026412 · FORM 2 ENGINEERS CERTIFICATE 31 03 2025.pdf · uploaded 5 Jun 2025Source
- Form 3P51700026412 · FORM 3 - Q4 31 13 2025.pdf · uploaded 5 Jun 2025Source
- Disclosure of Sold and Booked InventoryP51700026412 · Sold Inventory Table Final 31 03 2025.pdf · uploaded 5 Jun 2025Source
- Self-declaration of Quarterly ProgressP51700026412 · Self Declaration as on 31 03 2025.pdf · uploaded 5 Jun 2025Source
- Withdrawal Update Form 1P51700026412 · FORM 1 as on 31 03 2025.pdf · uploaded 5 Jun 2025Source
- Withdrawal Update Form 2P51700026412 · FORM 2 ENGINEERS CERTIFICATE 31 03 2025.pdf · uploaded 5 Jun 2025Source
- Withdrawal Update Form 3P51700026412 · FORM 3 - Q4 31 13 2025.pdf · uploaded 5 Jun 2025Source
- Form 5 (FY 2023-2024)P51700026412 · FORNAX REALTY FORM 5 AS ON 31 03 2024.pdf · uploaded 1 Jul 2025Source
- Form 5 (FY 2024-2025)P51700026412 · Form 5 - as on 31 03 2025.pdf · uploaded 1 Jul 2025Source
- Form 1P51700026412 · FORM 1 as on 30 06 2024.pdf · uploaded 2 Jul 2025Source
- Form 1P51700026412 · FORM 1 as on 30 09 2024.pdf · uploaded 2 Jul 2025Source
- Form 1P51700026412 · FORM 1 as on 31 12 2024.pdf · uploaded 2 Jul 2025Source
- Form 1P51700026412 · FORM 1 30 06 2023.pdf · uploaded 2 Jul 2025Source
- Form 1P51700026412 · Form 1 30 09 2023.pdf · uploaded 2 Jul 2025Source
- Form 1P51700026412 · Form 1 31 12 2023.pdf · uploaded 2 Jul 2025Source
- Form 1P51700026412 · Form 1 31 03 2024.pdf · uploaded 2 Jul 2025Source
- Form 2P51700026412 · FORM 2 as on 30 06 2024.pdf · uploaded 2 Jul 2025Source
- Form 2P51700026412 · FORM 2 ENGINEERS CERTIFICATE 30 09 2024.pdf · uploaded 2 Jul 2025Source
- Form 2P51700026412 · FORM 2-Engineer's Certificate 31 12 2024.pdf · uploaded 2 Jul 2025Source
- Form 2P51700026412 · FORM 2 30 06 2023.pdf · uploaded 2 Jul 2025Source
- Form 2P51700026412 · Form 2 30 09 2023.pdf · uploaded 2 Jul 2025Source
- Form 2P51700026412 · Form 2 31 12 2023.pdf · uploaded 2 Jul 2025Source
- Form 2P51700026412 · FORM 2 31 03 2024.pdf · uploaded 2 Jul 2025Source
- Form 3P51700026412 · Form 3 as on 30 06 2024_compressed.pdf · uploaded 2 Jul 2025Source
- Form 3P51700026412 · FORM 3 Q2 30 09 2024_11zon.pdf · uploaded 2 Jul 2025Source
- Form 3P51700026412 · FORM 3 - 31 12 2024_11zon.pdf · uploaded 2 Jul 2025Source
- Form 3P51700026412 · Form 3 30 06 2023.pdf · uploaded 2 Jul 2025Source
- Form 3P51700026412 · Form 3 30 09 2023.pdf · uploaded 2 Jul 2025Source
- Form 3P51700026412 · FORM 3_as on 31 12 2023.pdf · uploaded 2 Jul 2025Source
- Form 3P51700026412 · FORM 3 as on 31 03 2024.pdf · uploaded 2 Jul 2025Source
- Disclosure of Sold and Booked InventoryP51700026412 · SOLD INVENTORY 30 06 2024.pdf · uploaded 2 Jul 2025Source
- Disclosure of Sold and Booked InventoryP51700026412 · SOLD INVENTORY 30 09 2024.pdf · uploaded 2 Jul 2025Source
- Disclosure of Sold and Booked InventoryP51700026412 · SOLD INVENTORY 31 12 2024.pdf · uploaded 2 Jul 2025Source
- Disclosure of Sold and Booked InventoryP51700026412 · SOLD UNSOLD INVENTORY 30 06 2023.pdf · uploaded 2 Jul 2025Source
- Disclosure of Sold and Booked InventoryP51700026412 · SOLD INVENTORY 30 09 2023.pdf · uploaded 2 Jul 2025Source
- Disclosure of Sold and Booked InventoryP51700026412 · SOLD INVENTORY 31 12 2023.pdf · uploaded 2 Jul 2025Source
- Disclosure of Sold and Booked InventoryP51700026412 · SOLD INVENTORY 31 03 2024.pdf · uploaded 2 Jul 2025Source
- Self-declaration of Quarterly ProgressP51700026412 · Self Declaration 30 06 2024.pdf · uploaded 2 Jul 2025Source
- Self-declaration of Quarterly ProgressP51700026412 · Self Declaration 30 09 2024.pdf · uploaded 2 Jul 2025Source
- Self-declaration of Quarterly ProgressP51700026412 · Self Declaration 31 12 2024.pdf · uploaded 2 Jul 2025Source
- Form 2A (FY 2022-2023)P51700026412 · FORM 2A Quality Assurance certificate NEW 31.03.2024.pdf · uploaded 2 Jul 2025Source
- Form 2A (FY 2023-2024)P51700026412 · Form 2A (FY 2023-2024) · uploaded 2 Jul 2025Source
- Form 1P51700026412 · Form 1 31 03 2023.pdf · uploaded 3 Jul 2025Source
- Form 1P51700026412 · Form 1 31 12 2022.pdf · uploaded 3 Jul 2025Source
- Form 1P51700026412 · Form 1 30 09 2022.pdf · uploaded 3 Jul 2025Source
- Form 1P51700026412 · Form 1 30 06 2022.pdf · uploaded 3 Jul 2025Source
- Form 2P51700026412 · Form 2 31 03 2023.pdf · uploaded 3 Jul 2025Source
- Form 2P51700026412 · Form 2 31 12 2022.pdf · uploaded 3 Jul 2025Source
- Form 2P51700026412 · Form 2 30 09 2022.pdf · uploaded 3 Jul 2025Source
- Form 2P51700026412 · Form 2 30 06 2022.pdf · uploaded 3 Jul 2025Source
- Form 3P51700026412 · Form 3 CA CERTIFICATE 31 03 2023.pdf · uploaded 3 Jul 2025Source
- Form 3P51700026412 · Form 3 31 12 2022.pdf · uploaded 3 Jul 2025Source
- Form 3P51700026412 · Form 3 30 09 2022.pdf · uploaded 3 Jul 2025Source
- Form 3P51700026412 · Form 3 30 06 2022.pdf · uploaded 3 Jul 2025Source
- Disclosure of Sold and Booked InventoryP51700026412 · SOLD UNSOLD INVENTORY 31 03 2023.pdf · uploaded 3 Jul 2025Source
- Disclosure of Sold and Booked InventoryP51700026412 · SOLD UNSOLD INVENTORY 31 12 2022.pdf · uploaded 3 Jul 2025Source
- Disclosure of Sold and Booked InventoryP51700026412 · SOLD UNSOLD INVENTORY 30 09 2022.pdf · uploaded 3 Jul 2025Source
- Disclosure of Sold and Booked InventoryP51700026412 · SOLD UNSOLD INVENTORY 30 06 2022.pdf · uploaded 3 Jul 2025Source
- Form 2A (FY 2024-2025)P51700026412 · FORM 2A Quality Assurance certificate NEW 31.03.2024.pdf · uploaded 3 Jul 2025Source
- Form 5 (FY 2020-2021)P51700026412 · Form 5 31 03 2021.pdf · uploaded 3 Jul 2025Source
- Form 5 (FY 2021-2022)P51700026412 · Form 5 31 03 2022.pdf · uploaded 3 Jul 2025Source
- Form 5 (FY 2022-2023)P51700026412 · Form 5 31 03 2023.pdf · uploaded 3 Jul 2025Source
- Withdrawal Update Form 1P51700026412 · FORM 1 - Q1 30 06 2025.pdf · uploaded 3 Dec 2025Source
- Withdrawal Update Form 2P51700026412 · FORM 2 30 06 2025.pdf · uploaded 3 Dec 2025Source
- Withdrawal Update Form 3P51700026412 · Form 3 30 06 2025.pdf · uploaded 3 Dec 2025Source
- Withdrawal Update Form 1P51700026412 · FORM 1 Q2 30 09 2025.pdf · uploaded 26 Dec 2025Source
- Withdrawal Update Form 1P51700026412 · FORM 1 Q2 30 09 2025.pdf · uploaded 26 Dec 2025Source
- Withdrawal Update Form 2P51700026412 · FORM 2 Q2 30 09 2025.pdf · uploaded 26 Dec 2025Source
- Withdrawal Update Form 2P51700026412 · FORM 2 Q2 30 09 2025.pdf · uploaded 26 Dec 2025Source
- Withdrawal Update Form 3P51700026412 · FORM 3 Q2 30 09 2025.pdf · uploaded 26 Dec 2025Source
- Withdrawal Update Form 3P51700026412 · FORM 3 Q2 30 09 2025.pdf · uploaded 26 Dec 2025Source
- Withdrawal Update Form 1P51700026412 · FORM 1 Q2 30 09 2025.pdf · uploaded 27 Dec 2025Source
- Withdrawal Update Form 2P51700026412 · FORM 2 Q2 30 09 2025.pdf · uploaded 27 Dec 2025Source
- Withdrawal Update Form 3P51700026412 · FORM 3 Q2 30 09 2025.pdf · uploaded 27 Dec 2025Source
- Withdrawal Update Form 1P51700026412 · FORM 1 Q2 30 09 2025.pdf · uploaded 3 Jan 2026Source
- Withdrawal Update Form 2P51700026412 · FORM 2 Q2 30 09 2025.pdf · uploaded 3 Jan 2026Source
- Withdrawal Update Form 3P51700026412 · FORM 3 Q2 30 09 2025.pdf · uploaded 3 Jan 2026Source
- Withdrawal Update Form 1P51700026412 · FORM 1 as on 31 12 2025.pdf · uploaded 23 Feb 2026Source
- Withdrawal Update Form 2P51700026412 · FORM 2 Q3 31 12 2025.pdf · uploaded 23 Feb 2026Source
- Withdrawal Update Form 3P51700026412 · FORM 3 as on 31 12 25 Q3.pdf · uploaded 23 Feb 2026Source
- Withdrawal Update Form 1P51700026412 · FORM 1 as on 31 12 2025.pdf · uploaded 29 May 2026Source
- Withdrawal Update Form 2P51700026412 · FORM 2 Q3 31 12 2025.pdf · uploaded 29 May 2026Source
- Withdrawal Update Form 3P51700026412 · FORM 3 29 05 2026_compressed.pdf · uploaded 29 May 2026Source
- Withdrawal Update Form 1P51700026412 · FORM 1 - Q4 31 03 2026.pdf · uploaded 31 Jul 2026Source
- Withdrawal Update Form 2P51700026412 · FORM 2 - Q4 31 03 2026.pdf · uploaded 31 Jul 2026Source
- Withdrawal Update Form 3P51700026412 · FORM 3 - Q4 31 03 2026_compressed.pdf · uploaded 31 Jul 2026Source
- Withdrawal Update Form 1PM1331012600795 · FORM 1 Q1 30 06 2026 WING B.pdf · uploaded 24 Aug 2026Source
- Withdrawal Update Form 2PM1331012600795 · FORM 2 Q1 30 06 2026 WING B.pdf · uploaded 24 Aug 2026Source
- Withdrawal Update Form 3PM1331012600795 · FORM 3 Q1 30 06 2026 WING B.pdf · uploaded 24 Aug 2026Source
- Withdrawal Update Form 1P51700026412 · FORM 1 Q1 30 06 2026.pdf · uploaded 24 Aug 2026Source
- Withdrawal Update Form 2P51700026412 · FORM 2 Q1 30 06 2026.pdf · uploaded 24 Aug 2026Source
- Withdrawal Update Form 3P51700026412 · FORM 3 Q1 30 06 2026.pdf · uploaded 24 Aug 2026Source
- Withdrawal Update Form 1PM1331012600795 · FORM 1 22 08 2026.pdf · uploaded 25 Aug 2026Source
- Withdrawal Update Form 2PM1331012600795 · FORM 2 22 08 2026.pdf · uploaded 25 Aug 2026Source
- Withdrawal Update Form 3PM1331012600795 · FORM 3 22 08 2026.pdf · uploaded 25 Aug 2026Source
- Withdrawal Update Form 1PM1331012600795 · FORM 1 and Work Progress Certificate.pdf · uploaded 11 Sep 2026Source
- Withdrawal Update Form 2PM1331012600795 · FORM 2 22 08 2026.pdf · uploaded 11 Sep 2026Source
- Withdrawal Update Form 3PM1331012600795 · FORM 3 22 08 2026.pdf · uploaded 11 Sep 2026Source
Planning Authority
- DocumentPM1331012600795 · Cert_RB_595314_4472Zty7Sign.pdf · uploaded 12 Jun 2026Source
- DocumentPM1331012600795 · 1768682910_NMMCC-24-ENTRY-67114_R1.html · uploaded 12 Jun 2026Source
- DocumentPM1331012600795 · 1768682910_NMMCC-24-ENTRY-67114_R1.pdf_8_12DSE_Sign.pdfSign.pdf · uploaded 12 Jun 2026Source
- DocumentPM1331012600795 · W9YVPCx4Zh2nd_ACC.pdf · uploaded 12 Jun 2026Source
- DocumentPM1331012600795 · kBpjDOA2lZFORNAX_28A__28B_MODIFEID_AGRMNT.pdf · uploaded 12 Jun 2026Source
- DocumentPM1331012600795 · W9YVPCx4Zh2ND_ACC_DRG.pdf · uploaded 12 Jun 2026Source
Technical
- DocumentP51700026412 · PLAN LAYOUT APPROVAL GROUND TO THIRD.pdf · uploaded 15 Sep 2020Source
- DocumentP51700026412 · PLAN LAYOUT APPROVAL FIFTH TO THITEEN.pdf · uploaded 15 Sep 2020Source
- DocumentP51700026412 · PLAN LAYOUT APPROVAL FORTEEN AND WHOLE.pdf · uploaded 15 Sep 2020Source
- DocumentP51700026412 · Building Plan Approval.pdf · uploaded 15 Sep 2020Source
- DocumentP51700026412 · Aprroved Plan Ground Floor_compressed.pdf · uploaded 18 Nov 2022Source
- DocumentP51700026412 · Aprroved Plan 1st Floor_compressed.pdf · uploaded 18 Nov 2022Source
- DocumentP51700026412 · Aprroved Plan 2nd to 14th Floor_compressed.pdf · uploaded 18 Nov 2022Source
- DocumentP51700026412 · Aprroved Plan -Terrace_compressed.pdf · uploaded 18 Nov 2022Source
- DocumentP51700026412 · APPROVED PLAN GRND TO 19TH FLOOR-1_compressed.pdf · uploaded 24 Nov 2023Source
- DocumentP51700026412 · APPROVED PLAN GRND TO 19TH FLOOR-2_compressed.pdf · uploaded 24 Nov 2023Source
- DocumentP51700026412 · APPROVED PLAN GRND TO 19TH FLOOR-3_compressed.pdf · uploaded 24 Nov 2023Source
- DocumentP51700026412 · APPROVED PLAN GRND TO 19TH FLOOR-4_compressed.pdf · uploaded 24 Nov 2023Source
- DocumentP51700026412 · APPROVED PLAN GRND TO 19TH FLOOR-5_compressed.pdf · uploaded 24 Nov 2023Source
- DocumentPM1331012600795 · CC DRG-1.pdf · uploaded 24 Mar 2026Source
- DocumentPM1331012600795 · CC DRG-2.pdf · uploaded 24 Mar 2026Source
- DocumentPM1331012600795 · CC DRG-3.pdf · uploaded 24 Mar 2026Source
- DocumentPM1331012600795 · CC DRG-4.pdf · uploaded 24 Mar 2026Source
- DocumentPM1331012600795 · CC DRG-5.pdf · uploaded 24 Mar 2026Source
- DocumentPM1331012600795 · CC DRG-6.pdf · uploaded 24 Mar 2026Source
- DocumentPM1331012600795 · CC DRG-7.pdf · uploaded 24 Mar 2026Source
- DocumentPM1331012600795 · CC DRG-8.pdf · uploaded 24 Mar 2026Source
- DocumentPM1331012600795 · CC DRG-9.pdf · uploaded 24 Mar 2026Source
- DocumentPM1331012600795 · CC DRG-10.pdf · uploaded 24 Mar 2026Source
- DocumentPM1331012600795 · CC DRG-1.pdf · uploaded 24 Mar 2026Source
- DocumentPM1331012600795 · Annexure A 23 02 2026.pdf · uploaded 24 Mar 2026Source
- OthersPM1331012600795 · FORM 1-ARCHITECT CERTIFICATE.pdf · uploaded 24 Mar 2026Source
- OthersPM1331012600795 · FORM 2 - 28B.pdf · uploaded 24 Mar 2026Source
- OthersPM1331012600795 · FORNAX REALTY PANCARD.pdf · uploaded 24 Mar 2026Source
- OthersPM1331012600795 · GST REGISTRATION CERTIFICATE.pdf · uploaded 24 Mar 2026Source
- DocumentP51700026412 · CC DRG-1.pdf · uploaded 25 Mar 2026Source
- DocumentP51700026412 · CC DRG-2.pdf · uploaded 25 Mar 2026Source
- DocumentP51700026412 · CC DRG-3.pdf · uploaded 25 Mar 2026Source
- DocumentP51700026412 · CC DRG-4.pdf · uploaded 25 Mar 2026Source
- DocumentP51700026412 · CC DRG-5.pdf · uploaded 25 Mar 2026Source
- DocumentP51700026412 · CC DRG-6.pdf · uploaded 25 Mar 2026Source
- DocumentP51700026412 · CC DRG-7.pdf · uploaded 25 Mar 2026Source
- DocumentP51700026412 · CC DRG-8.pdf · uploaded 25 Mar 2026Source
- DocumentP51700026412 · CC DRG-9.pdf · uploaded 25 Mar 2026Source
- DocumentP51700026412 · CC DRG-10.pdf · uploaded 25 Mar 2026Source
- OthersPM1331012600795 · Highleted CAR Parking details.pdf · uploaded 14 Apr 2026Source
- OthersPM1331012600795 · CIDCO ALLOTMENT LETTER 28B.pdf · uploaded 27 May 2026Source
- OthersPM1331012600795 · AGREEMENT TO LEASE 28B.pdf · uploaded 27 May 2026Source
- OthersPM1331012600795 · CC DRG-Highlited Final.pdf · uploaded 27 May 2026Source
- OthersPM1331012600795 · CC DRG-1 Highlited 2.pdf · uploaded 27 May 2026Source
- OthersPM1331012600795 · Recreational Open Space.pdf · uploaded 27 May 2026Source
- OthersPM1331012600795 · Declaration from archtitect.pdf · uploaded 28 May 2026Source
- DocumentP51700026412 · CC DRG-1HIGHLIGHTED Final.pdf · uploaded 4 Jun 2026Source
Technical (Architect)
- DocumentP51700026412 · FORM 1 as on 30 06 2024.pdf · uploaded 8 Nov 2024Source
- DocumentP51700026412 · FORM 1 ARCHITECT CERTIFICATE 30 09 24.pdf · uploaded 16 Nov 2024Source
- DocumentP51700026412 · FORM 1 ARCHITECT CERTIFICATE 30 09 24.pdf · uploaded 16 Nov 2024Source
- DocumentP51700026412 · FORM 1 Architect Certificate-31 12 2024.pdf · uploaded 5 Feb 2025Source
- DocumentP51700026412 · FORM 1 Q1 30 06 2026.pdf · uploaded 24 Aug 2026Source
- DocumentPM1331012600795 · FORM 1 and Work Progress Certificate.pdf · uploaded 11 Sep 2026Source
Technical (Engineer)
- DocumentP51700026412 · FORM 2 as on 30 06 2024.pdf · uploaded 8 Nov 2024Source
- DocumentP51700026412 · FORM 2 ENGINEERS CERTIFICATE 30 09 2024.pdf · uploaded 16 Nov 2024Source
- DocumentP51700026412 · FORM 2 ENGINEERS CERTIFICATE 30 09 2024.pdf · uploaded 16 Nov 2024Source
- DocumentP51700026412 · FORM 2-Engineer's Certificate.pdf · uploaded 5 Feb 2025Source
- DocumentP51700026412 · FORM 2 Q1 30 06 2026.pdf · uploaded 24 Aug 2026Source
- DocumentPM1331012600795 · FORM 2 22 08 2026.pdf · uploaded 25 Aug 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Koparkharane, Thane taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- 15 Mtrs Wide Road
- South
- Plot No 27
- East
- Plot No 28b
- West
- 24 Mtrs Wide Road
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. | RERA |
|---|---|---|---|
| Architect | Atul Patel | — | P51700026412 |
| Architect | Atul Patel | — | PM1331012600795 |
| Architect | Atul Patel Architects | — | P51700026412 |
| Chartered accountant | Pinky Jha | — | PM1331012600795 |
| Chartered accountant | Pinky Jha | — | P51700026412 |
| Chartered accountant | Vishal Shethiya | — | PM1331012600795 |
| Chartered accountant | Vishal Shethiya | — | P51700026412 |
| Engineer | A G GOKHALE and ASSOCIATES | — | P51700026412 |
| Engineer | A G GOKHALE and ASSOCIATES | — | PM1331012600795 |
| Other | Rohit Vishwakarma | — | P51700026412 |
Source: MahaRERA project page. Contact details are not shown.