Neptune Swarajya Sector 1-A4

NCLT insolvency listing

Kalyan-Dombivali (M Corp.), Thane 421102 |Promoter: Neptune Developers Limited

Residential / Group HousingRERAP51700009803
22 Aug 2017Registered with MahaRERA
30 Jun 2018Promised completion
1Building
55Units registered
1MahaRERA listings and orders

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
1 BHK55 units in all
Land area for this project
219 sq m (2,357 sq ft)
Permissible built-up area
1,287 sq m (13,851 sq ft)
Sanctioned built-up area
1,287 sq m (13,851 sq ft)
Recreational open space
10,372 sq m (1,11,642 sq ft)
Address
S No 13, 23, 4, 5, 6 And OthersPIN 421102
Designated bank account
Central Bank Of India
Litigation declared by promoter
Yes
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.27833, 73.18688
Neptune Swarajya Sector 1-A4 is at latitude 19.27833, longitude 73.18688.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Jun 2018

The latest completion date on record passed 8 years and 4 months ago.

Registered
22 Aug 2017
Promised
30 Jun 2018

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5170000980322 Aug 201730 Jun 2018—Neptune Developers LimitedProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
A4855

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

55 units registered

1 BHK · 55 units
TypeCarpet areaUnits
1 BHK20.93 sq m · 225 sq ft55

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

A4

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises96%
  • Sanitary Fittings within the flats / premises89%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks91%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.83%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.97%

Common areas and amenities

  • Internal Roads & FootpathsWORK DONE100%
  • Water SupplyWORK DONE100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)WORK DONE100%
  • Storm Water DrainsWORK DONE100%
  • Landscaping & Tree PlantingONLY TREE PLANTATION100%
  • Street LightingWORK DONE100%
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterWORK DONE100%
  • Solid Waste Management And DisposalWORK DONE100%
  • Water conservation /Rain water harvestingWORK DONE100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsWORK DONE100%
  • Electrical meter room, sub-station, receiving stationWORK DONE100%
  • Aggregate area of recreational Open Spaceto be done75%
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

20 documents held by Deedo, 27 filings listed on MahaRERA's project page

Title report (3)

Encumbrance details

Commencement certificate

Form B

Form 1

Allotment letter (3)

Show all 47 documentsShow fewer documents

Allotment letter (3)

Registration certificate

Form 4 (2)

Form 5

Other (4)

Layout plan

Building plan

Document library

  • Copy of the legal title reportAmbivali Title Part 1 - Sec 1, 2, 2C.pdf · uploaded 30 Jul 2017View
  • Copy of the legal title reportAmbivali Title Part 2 - Sec 1, 2, 2C.pdf · uploaded 30 Jul 2017View
  • Copy of the legal title reportAmbivali Title Part 3 - Sec 1, 2, 2C.pdf · uploaded 30 Jul 2017View
  • Details of encumbrancesA4.PDF · uploaded 30 Jul 2017View
  • Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 30 Jul 2017View
  • Proforma of Allotment letterDraft Allotment _Neptune Swarajya_ _A4_.pdf · uploaded 30 Jul 2017View
  • Proforma of Allotment letterTo Whomsoever it MAy Concern A4.PDF · uploaded 30 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect's Certificate Ambi A4.PDF · uploaded 30 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)A4.PDF · uploaded 30 Jul 2017View
  • Declaration in FORM BFROM 'B' A4.PDF · uploaded 30 Jul 2017View
  • OtherSector 1 Letter.PDF · uploaded 30 Jul 2017View
  • Building Plan Approval (IOD)CC A4 COMPRESSED.pdf · uploaded 30 Jul 2017View
  • Commencement Certificates / NA Order for plotted developmentCC B10 A1 3 4 5 compressed new1.pdf · uploaded 30 Jul 2017View
  • Proforma of Allotment letterSwarajya Sector 1 Draft Agreement.pdf · uploaded 31 Mar 2018View
  • Certificates of Architect (Form 4)building A4.pdf · uploaded 23 Apr 2018View
  • Certificates of Architect (Form 4)OC Copy.pdf · uploaded 23 Apr 2018View
  • Certificates of CA (Form 5)SECTOR-1 A4.PDF · uploaded 11 Feb 2019View
  • OtherNCLT Order dt 16-07-21_compressed.pdf · uploaded 6 Apr 2022View

Promoter documents

  • Legal Title reportAmbivali Title Part 1 - Sec 1, 2, 2C.pdf · uploaded 30 Jul 2017View
  • Legal Title reportAmbivali Title Part 2 - Sec 1, 2, 2C.pdf · uploaded 30 Jul 2017View
  • Legal Title reportAmbivali Title Part 3 - Sec 1, 2, 2C.pdf · uploaded 30 Jul 2017View
  • Declaration Form BFROM 'B' A4.PDF · uploaded 30 Jul 2017View

Technical documents

  • Building Plan ApprovalCC A4 COMPRESSED.pdfView
  • Layout ApprovalLayout.pdfView

Other legal documents

  • OtherSector 1 Letter.PDFView
  • OtherNCLT Order dt 16-07-21_compressed.pdfView

Proforma allotment letter

  • Proforma allotment letterTo Whomsoever it MAy Concern A4.PDFView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

What MahaRERA has published about this project. A listing records what the authority published; it is not a judgment of the project.

  • Listed as an NCLT insolvency projectMatched by RERA number

    Listed as NCLT project: NEPTUNE SWARAJYA SECTOR 1-A4

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Kalyan-Dombivali (M Corp.), Kalyan taluka

Survey, CTS, gat or plot numbers

132/32323444555666S NO 1/3S NO 13

As published on MahaRERA's project page

S NO 13, 23,4,5,6 AND OTHERS

Boundaries

North
Proposed 30m Dp Road
South
Raiway Track
East
Proposed 24m Dp Road
West
Survey No 75 And 76

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAnil R Nirgude—

Source: MahaRERA project page. Contact details are not shown.

Data through11 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project page · MahaRERA regulatory lists and ordersData through is when MahaRERA's project page was last read.Methodology