Mangeshi Tulip
Certificate SignedGandhare, Thane 421301 |Promoter: Mangesh Dashrath Gaikar
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Buildings
- 3
- Unit types
- 2BHK, Shop, 1BHK184 units in all
- Address
- Survey No 7 Hissa 1, Vasant Vally Road, Vasant VallyPIN 421301
- Designated bank account
- 51
- Developed in phases
- Yes
Location
Coordinates as published by MahaRERA
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion promised for 30 Jul 2026
The latest completion date on record passed 3 months ago.
- Registered
- 2 Dec 2022
- Promised
- 30 Jul 2026
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700047949 | 2 Dec 2022 | 30 Jul 2026 | 30 Jul 2026 | Mangesh Dashrath Gaikar | Project page |
3 buildings
Buildings and wings named in the registration
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
76 of 184 units booked (41%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A1 | 2BHK | 47.53 sq m · 512 sq ft | 60 | 13 |
| A1 | Shop | 8.16 sq m · 88 sq ft | 2 | 1 |
| A1 | Shop | 10.86 sq m · 117 sq ft | 2 | 0 |
| A1 | Shop | 13.35 sq m · 144 sq ft | 2 | 1 |
| A1 | Shop | 13.8 sq m · 149 sq ft | 2 | 2 |
| A2 | 2BHK | 48.3 sq m · 520 sq ft | 6 | 5 |
| A3 | 1BHK | 37.1 sq m · 399 sq ft | 3 | 1 |
| A3 | 1BHK | 39.55 sq m · 426 sq ft | 38 | 19 |
Show all 21 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A3 | 2BHK | 8.09 sq m · 87 sq ft | 1 | 1 |
| A3 | 2BHK | 48.45 sq m · 522 sq ft | 20 | 7 |
| A3 | 2BHK | 48.5 sq m · 522 sq ft | 20 | 8 |
| A3 | 2BHK | 48.9 sq m · 526 sq ft | 17 | 10 |
| A3 | Shop | 5.99 sq m · 64 sq ft | 1 | 1 |
| A3 | Shop | 8.62 sq m · 93 sq ft | 1 | 0 |
| A3 | Shop | 8.84 sq m · 95 sq ft | 1 | 1 |
| A3 | Shop | 10.73 sq m · 115 sq ft | 1 | 1 |
| A3 | Shop | 12.33 sq m · 133 sq ft | 2 | 2 |
| A3 | Shop | 13.42 sq m · 144 sq ft | 1 | 0 |
| A3 | Shop | 14.49 sq m · 156 sq ft | 2 | 1 |
| A3 | Shop | 14.99 sq m · 161 sq ft | 1 | 1 |
| A3 | Shop | 16.01 sq m · 172 sq ft | 1 | 1 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
1 document held by Deedo, 153 filings listed on MahaRERA's project page
Finance
- PAN CardPan Card .pdf · uploaded 14 Aug 2022Source
Legal
Migrated
- 1 PAN CardPan Card .pdf · uploaded 14 Aug 2022Source
- 1 Copy of the legal title reportTitlee certificate.pdf · uploaded 14 Aug 2022Source
- 1 a Details of encumbrances concerned to Financeno encumbrances finance.pdf · uploaded 14 Aug 2022Source
- 1 b Details of encumbrances concerned to Legalno encumbrances legal.pdf · uploaded 14 Aug 2022Source
Show all 154 documentsShow fewer documents
Migrated
- 1 Copy of Layout Approval (in case of layout)1.pdf · uploaded 14 Aug 2022Source
- 1 Building Plan Approval / NA Order for plotted development2.pdf · uploaded 14 Aug 2022Source
- 2 Building Plan Approval / NA Order for plotted development3.pdf · uploaded 14 Aug 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentSKM_C364e22021908010_compressed.pdf · uploaded 14 Aug 2022Source
- 2 Commencement Certificates / NA Order for plotted developmentSKM_C364e22021908160_compressed.pdf · uploaded 14 Aug 2022Source
- 3 Commencement Certificates / NA Order for plotted development118.pdf · uploaded 14 Aug 2022Source
- 1 Declaration about Commencement Certificatedeclaration of commencement.pdf · uploaded 14 Aug 2022Source
- 1 Declaration in FORM BForm B.pdf · uploaded 14 Aug 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architects certificate.pdf · uploaded 14 Aug 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer certificate.pdf · uploaded 14 Aug 2022Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the samedeclaration of bank.pdf · uploaded 14 Aug 2022Source
- 1 Deviation Report with respect to Allotment letterdeclaration of allotment.pdf · uploaded 14 Aug 2022Source
- 1 Deviation Report with respect to model copy of Agreementdeclaration of agreement.pdf · uploaded 14 Aug 2022Source
- 1 CERSAI detailscersai declaration.pdf · uploaded 18 Aug 2022Source
- 1 Proforma of Allotment letterTulip AFS.pdf · uploaded 3 Sep 2022Source
- 1 Proforma of Agreement for saleTulip AFS.pdf · uploaded 3 Sep 2022Source
- 2 Proforma of Agreement for saleALLOTMENT LETTER.pdf · uploaded 3 Sep 2022Source
- 2 Proforma of Allotment letterALLOTMENT LETTER.pdf · uploaded 3 Sep 2022Source
- 3 Proforma of Allotment letterletter.pdf · uploaded 3 Sep 2022Source
- 3 Proforma of Agreement for saleletter.pdf · uploaded 3 Sep 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 final.pdf · uploaded 16 Nov 2022Source
- 2 a Details of encumbrances concerned to FinanceAdobe Scan 08 May 2023.pdf · uploaded 8 May 2023Source
- 2 b Details of encumbrances concerned to LegalAdobe Scan 08 May 2023.pdf · uploaded 8 May 2023Source
- 1 Disclosure of sold/ booked inventoryDisclosure of Sold Unsold_compressed.pdf · uploaded 9 May 2023Source
- 2 Disclosure of sold/ booked inventorySold Unsold details_compressed.pdf · uploaded 8 Jul 2023Source
- 4 Proforma of Agreement for saleagreement tulip.pdf · uploaded 11 Aug 2023Source
- 5 Proforma of Agreement for saleGetUserDocumentFileContent.pdf · uploaded 21 Aug 2023Source
- 3 Disclosure of sold/ booked inventoryDiscolsure of sold inventory Tulip_compressed.pdf · uploaded 23 Apr 2024Source
- 1 Disclosure of sold/ booked inventorySold details_compressed.pdf · uploaded 30 Jan 2025Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOC Tulip.pdf · uploaded 25 Apr 2025Source
- Occupational CertificateTulip Full OC.pdf · uploaded 16 May 2025Source
- Occupational Certificate20250110095855.pdf · uploaded 16 May 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A 2022-23.pdf · uploaded 22 Jul 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 2022-23 tulip final.pdf · uploaded 22 Jul 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A Final.pdf · uploaded 22 Jul 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 2023-24 tulip.pdf · uploaded 22 Jul 2025Source
- Form 2A (FY 2022-2023)Form 2A 2022-23.pdf · uploaded 22 Jul 2025Source
- Form 2A (FY 2023-2024)Form 2A Final.pdf · uploaded 22 Jul 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Mar 2023.pdf · uploaded 23 Jul 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 June 2023.pdf · uploaded 23 Jul 2025Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Sept 2023.pdf · uploaded 23 Jul 2025Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Dec 2023.pdf · uploaded 23 Jul 2025Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Mar 2024.pdf · uploaded 23 Jul 2025Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 June 2024.pdf · uploaded 23 Jul 2025Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Sept 2024.pdf · uploaded 23 Jul 2025Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Dec 2024.pdf · uploaded 23 Jul 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Dec 2022.pdf · uploaded 23 Jul 2025Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Form 3 Tulip Dec 23 final.pdf · uploaded 23 Jul 2025Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Form 3 Tulip Dec 24 final.pdf · uploaded 23 Jul 2025Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Form 3 Tulip Sep 24 final.pdf · uploaded 23 Jul 2025Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Form 3 Tulip June 24 final.pdf · uploaded 23 Jul 2025Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Form 3 Tulip Mar 24 final.pdf · uploaded 23 Jul 2025Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Form 3 Tulip Sept 23 final.pdf · uploaded 23 Jul 2025Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Form 3 Tulip June 23 final.pdf · uploaded 23 Jul 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Form 3 Tulip Mar 23 final.pdf · uploaded 23 Jul 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Form 3 Tulip Dec 22 final.pdf · uploaded 23 Jul 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 23 Jul 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 23 Jul 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 23 Jul 2025Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 23 Jul 2025Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 23 Jul 2025Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 23 Jul 2025Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 23 Jul 2025Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 23 Jul 2025Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 23 Jul 2025Source
- Form 1Form 1 Dec 2022.pdf · uploaded 23 Jul 2025Source
- Form 2Form 2.pdf · uploaded 23 Jul 2025Source
- Form 3CA Certificate Form 3 Tulip Dec 22 final.pdf · uploaded 23 Jul 2025Source
- Disclosure of Sold and Booked InventorySold unsold final.pdf · uploaded 23 Jul 2025Source
- Form 1Form 1 Mar 2023.pdf · uploaded 23 Jul 2025Source
- Form 2Form 2.pdf · uploaded 23 Jul 2025Source
- Form 3CA Certificate Form 3 Tulip Mar 23 final.pdf · uploaded 23 Jul 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of Sold Unsold.pdf · uploaded 23 Jul 2025Source
- Form 1Form 1 June 2023.pdf · uploaded 23 Jul 2025Source
- Form 2Form 2.pdf · uploaded 23 Jul 2025Source
- Form 3CA Certificate Form 3 Tulip June 23 final.pdf · uploaded 23 Jul 2025Source
- Disclosure of Sold and Booked InventorySold Unsold details.pdf · uploaded 23 Jul 2025Source
- Form 1Form 1 Sept 2023.pdf · uploaded 23 Jul 2025Source
- Form 2Form 2.pdf · uploaded 23 Jul 2025Source
- Form 3CA Certificate Form 3 Tulip Sept 23 final.pdf · uploaded 23 Jul 2025Source
- Disclosure of Sold and Booked InventorySold Unsold List Tulip.pdf · uploaded 23 Jul 2025Source
- Form 1Form 1 Dec 2023.pdf · uploaded 23 Jul 2025Source
- Form 2Form 2.pdf · uploaded 23 Jul 2025Source
- Form 3CA Certificate Form 3 Tulip Dec 23 final.pdf · uploaded 23 Jul 2025Source
- Disclosure of Sold and Booked InventorySold Unsold List Tulip.pdf · uploaded 23 Jul 2025Source
- Form 1Form 1 Mar 2024.pdf · uploaded 23 Jul 2025Source
- Form 2Form 2.pdf · uploaded 23 Jul 2025Source
- Form 3CA Certificate Form 3 Tulip Mar 24 final.pdf · uploaded 23 Jul 2025Source
- Disclosure of Sold and Booked InventoryDiscolsure of sold inventory Tulip.pdf · uploaded 23 Jul 2025Source
- Form 1Form 1 June 2024.pdf · uploaded 23 Jul 2025Source
- Form 2Form 2.pdf · uploaded 23 Jul 2025Source
- Form 3CA Certificate Form 3 Tulip June 24 final.pdf · uploaded 23 Jul 2025Source
- Disclosure of Sold and Booked InventorySold Unsold Final.pdf · uploaded 23 Jul 2025Source
- Form 1Form 1 Sept 2024.pdf · uploaded 23 Jul 2025Source
- Form 2Form 2.pdf · uploaded 23 Jul 2025Source
- Form 3CA Certificate Form 3 Tulip Sep 24 final.pdf · uploaded 23 Jul 2025Source
- Disclosure of Sold and Booked InventorySold unsold final.pdf · uploaded 23 Jul 2025Source
- Form 1Form 1 Dec 2024.pdf · uploaded 23 Jul 2025Source
- Form 2Form 2.pdf · uploaded 23 Jul 2025Source
- Form 3CA Certificate Form 3 Tulip Dec 24 final.pdf · uploaded 23 Jul 2025Source
- Disclosure of Sold and Booked InventorySold details.pdf · uploaded 23 Jul 2025Source
- 1 Building Plan Approval / NA Order for plotted developmentTulip Plan_compressed.pdf · uploaded 24 Jul 2025Source
- 2 Building Plan Approval / NA Order for plotted developmentTulip A1 Plan_compressed.pdf · uploaded 24 Jul 2025Source
- 3 Building Plan Approval / NA Order for plotted developmentTulip A3 Plan_compressed.pdf · uploaded 24 Jul 2025Source
- 4 Building Plan Approval / NA Order for plotted development1 (1)_compressed.pdf · uploaded 24 Jul 2025Source
- 5 Building Plan Approval / NA Order for plotted development1 (2)_compressed.pdf · uploaded 24 Jul 2025Source
- 6 Building Plan Approval / NA Order for plotted development1 (3)_compressed.pdf · uploaded 24 Jul 2025Source
- 7 Building Plan Approval / NA Order for plotted development1 (4)_compressed.pdf · uploaded 24 Jul 2025Source
- 8 Building Plan Approval / NA Order for plotted development1 (5)_compressed.pdf · uploaded 24 Jul 2025Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentTulip oc mail_merged.pdf · uploaded 24 Jul 2025Source
- Form 2A (FY 2024-2025)Form 2A.pdf · uploaded 24 Jul 2025Source
- Form 1Architect Certificate Form 1 Tulip Mar 2025.pdf · uploaded 24 Sep 2025Source
- Form 2ENGINEER'S CERTIFICATE Tulip Mar 2025 Final.pdf · uploaded 24 Sep 2025Source
- Form 3CERTIFICATE ON RERA FORM 3 MANGESHI TULIP Sign.pdf · uploaded 24 Sep 2025Source
- Disclosure of Sold and Booked InventorySold-Booked Inventory Tulip Mar 2025.pdf · uploaded 24 Sep 2025Source
Technical
- Document1.pdf · uploaded 14 Aug 2022Source
- Document2.pdf · uploaded 14 Aug 2022Source
- Document3.pdf · uploaded 14 Aug 2022Source
- DocumentTulip Plan_compressed.pdf · uploaded 24 Jul 2025Source
- DocumentTulip A1 Plan_compressed.pdf · uploaded 24 Jul 2025Source
- DocumentTulip A3 Plan_compressed.pdf · uploaded 24 Jul 2025Source
- Document1 (1)_compressed.pdf · uploaded 24 Jul 2025Source
- Document1 (2)_compressed.pdf · uploaded 24 Jul 2025Source
- Document1 (3)_compressed.pdf · uploaded 24 Jul 2025Source
- Document1 (4)_compressed.pdf · uploaded 24 Jul 2025Source
- Document1 (5)_compressed.pdf · uploaded 24 Jul 2025Source
Technical (Architect)
- DocumentForm 1 Architects certificate.pdf · uploaded 14 Aug 2022Source
- DocumentForm 1 Dec 2022.pdf · uploaded 23 Jul 2025Source
- DocumentForm 1 Mar 2023.pdf · uploaded 23 Jul 2025Source
- DocumentForm 1 June 2023.pdf · uploaded 23 Jul 2025Source
- DocumentForm 1 Sept 2023.pdf · uploaded 23 Jul 2025Source
- DocumentForm 1 Dec 2023.pdf · uploaded 23 Jul 2025Source
- DocumentForm 1 Mar 2024.pdf · uploaded 23 Jul 2025Source
- DocumentForm 1 June 2024.pdf · uploaded 23 Jul 2025Source
- DocumentForm 1 Sept 2024.pdf · uploaded 23 Jul 2025Source
- DocumentForm 1 Dec 2024.pdf · uploaded 23 Jul 2025Source
Technical (Engineer)
- DocumentForm 2 Engineer certificate.pdf · uploaded 14 Aug 2022Source
- DocumentForm 2.pdf · uploaded 23 Jul 2025Source
- DocumentForm 2.pdf · uploaded 23 Jul 2025Source
- DocumentForm 2.pdf · uploaded 23 Jul 2025Source
- DocumentForm 2.pdf · uploaded 23 Jul 2025Source
- DocumentForm 2.pdf · uploaded 23 Jul 2025Source
- DocumentForm 2.pdf · uploaded 23 Jul 2025Source
- DocumentForm 2.pdf · uploaded 23 Jul 2025Source
- DocumentForm 2.pdf · uploaded 23 Jul 2025Source
- DocumentForm 2.pdf · uploaded 23 Jul 2025Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Gandhare, Kalyan taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- 24 meter wide road
- South
- Vrindravan Palm
- East
- Kavita Pearl
- West
- home
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Vitan Consultant | — |
| Chartered accountant | INS And Associates | — |
| Engineer | Dipali Patil | — |
| Other | V K Buildcon | — |
Source: MahaRERA project page. Contact details are not shown.