Skip to content

Seasons One

Certificate Signed

Chikanghar, Thane 421301 |Promoter: Unique Enterprises

5 Apr 2022Registered with MahaRERA
31 Dec 2028Promised completion
30 Apr 2029Revised completionPushed back 4 months
1Building
182Units registered73 booked (40%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Buildings
1
Unit types
1RK, 2BHK, 3BHK, Office space, Shop182 units in all
Address
Surevy No 6, Hissa No 7, Surevy No 7, Hissa No 3/4/1, 3/4/2, 3/4/4., Opposite Kokan Ratna Hotel, Kalyan WestPIN 421301
Designated bank account
220
Developed in phases
No

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.25133, 73.15333
Seasons One is at latitude 19.25133, longitude 73.15333.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 4 months

Registered
5 Apr 2022
Promised
31 Dec 2028
Revised
30 Apr 2029

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P517000344555 Apr 202231 Dec 202830 Apr 2029Unique EnterprisesProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Seasons One32182

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

73 of 182 units booked (40%), as the promoter reported to MahaRERA

1RK · 46 units2BHK · 51 units3BHK · 61 unitsOffice space · 22 unitsShop · 2 units
TypeCarpet areaUnitsBooked
1RK26.2 sq m · 282 sq ft229
1RK26.53 sq m · 286 sq ft10
1RK28.8 sq m · 310 sq ft177
1RK31.51 sq m · 339 sq ft53
1RK31.55 sq m · 340 sq ft10
2BHK63.32 sq m · 682 sq ft1913
2BHK63.36 sq m · 682 sq ft155
2BHK67.55 sq m · 727 sq ft81
Show all 28 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
2BHK67.59 sq m · 728 sq ft72
2BHK68.04 sq m · 732 sq ft11
2BHK68.19 sq m · 734 sq ft10
3BHK87.51 sq m · 942 sq ft3817
3BHK88.28 sq m · 950 sq ft21
3BHK97.08 sq m · 1,045 sq ft165
3BHK97.79 sq m · 1,053 sq ft43
3BHK102.02 sq m · 1,098 sq ft11
Office space33.84 sq m · 364 sq ft20
Office space36.12 sq m · 389 sq ft20
Office space37.17 sq m · 400 sq ft21
Office space37.47 sq m · 403 sq ft40
Office space38.68 sq m · 416 sq ft21
Office space39.83 sq m · 429 sq ft20
Office space40.19 sq m · 433 sq ft20
Office space42.9 sq m · 462 sq ft20
Office space45.35 sq m · 488 sq ft20
Office space48.12 sq m · 518 sq ft21
Shop407.93 sq m · 4,391 sq ft11
Shop462.93 sq m · 4,983 sq ft11

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 120 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN Card1 PAN Card (5).pdf · uploaded 24 Mar 2022Source

Legal

  • Legal Title reportTitle report.pdf · uploaded 26 Mar 2022Source
  • Declaration Form BFORM B.pdf · uploaded 26 Mar 2022Source

Migrated

  • 1 PAN Card1 PAN Card (5).pdf · uploaded 24 Mar 2022Source
  • 1 Details of encumbrances1 Details of encumbrances (1).pdf · uploaded 24 Mar 2022Source
  • 1 Copy of Layout Approval (in case of layout)1 Copy of Layout Approval (in case of layout) (5).pdf · uploaded 24 Mar 2022Source
  • 2 Copy of Layout Approval (in case of layout)2 Copy of Layout Approval (in case of layout) (1).pdf · uploaded 24 Mar 2022Source
Show all 121 documentsShow fewer documents

Migrated

  • 3 Copy of Layout Approval (in case of layout)3 Copy of Layout Approval (in case of layout).pdf · uploaded 24 Mar 2022Source
  • 4 Copy of Layout Approval (in case of layout)4 Copy of Layout Approval (in case of layout).pdf · uploaded 24 Mar 2022Source
  • 5 Copy of Layout Approval (in case of layout)5 Copy of Layout Approval (in case of layout).pdf · uploaded 24 Mar 2022Source
  • 1 Building Plan Approval / NA Order for plotted development1 Copy of Layout Approval (in case of layout) (5).pdf · uploaded 24 Mar 2022Source
  • 2 Building Plan Approval / NA Order for plotted development2 Copy of Layout Approval (in case of layout) (1).pdf · uploaded 24 Mar 2022Source
  • 3 Building Plan Approval / NA Order for plotted development3 Copy of Layout Approval (in case of layout).pdf · uploaded 24 Mar 2022Source
  • 4 Building Plan Approval / NA Order for plotted development4 Copy of Layout Approval (in case of layout).pdf · uploaded 24 Mar 2022Source
  • 5 Building Plan Approval / NA Order for plotted development5 Copy of Layout Approval (in case of layout).pdf · uploaded 24 Mar 2022Source
  • 1 Commencement Certificates / NA Order for plotted development1 Commencement Certificates _ NA Order for plotted development (2).pdf · uploaded 24 Mar 2022Source
  • 1 Declaration about Commencement Certificate1 Declaration about Commencement Certificate (1).pdf · uploaded 24 Mar 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)1 Architect’s Certificate of Percentage of Completion of Work (Form 1) (2).pdf · uploaded 24 Mar 2022Source
  • 1 CERSAI details1 CERSAI details (2).pdf · uploaded 24 Mar 2022Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)1 CA Certificate on Project Cost And Fund withdrawal (Form 3) (7).pdf · uploaded 24 Mar 2022Source
  • 1 Proforma of Allotment letter1 Proforma of the allotment letter and agreement for sale (2).pdf · uploaded 24 Mar 2022Source
  • 2 Proforma of Allotment letter2 Proforma of the allotment letter and agreement for sale (2).pdf · uploaded 24 Mar 2022Source
  • 1 Copy of the legal title reportTitle report.pdf · uploaded 26 Mar 2022Source
  • 1 Declaration in FORM BFORM B.pdf · uploaded 26 Mar 2022Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect certificate.pdf · uploaded 8 Jul 2022Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer certificate.pdf · uploaded 8 Jul 2022Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA certificate (1).pdf · uploaded 12 Jul 2022Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT FORM 1.pdf · uploaded 17 Oct 2022Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER FORM 2.pdf · uploaded 17 Oct 2022Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA FORM 3.pdf · uploaded 17 Oct 2022Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 18 Jan 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 18 Jan 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)FORM 2A.pdf · uploaded 18 Jan 2023Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 18 Jan 2023Source
  • 1 Proforma of Agreement for salesale_agreement.pdf · uploaded 18 Jan 2023Source
  • 6 Copy of Layout Approval (in case of layout)Plans 1-2.pdf · uploaded 13 Apr 2023Source
  • 7 Copy of Layout Approval (in case of layout)Plans 3-4.pdf · uploaded 13 Apr 2023Source
  • 8 Copy of Layout Approval (in case of layout)Plans 5-7.pdf · uploaded 13 Apr 2023Source
  • 6 Building Plan Approval / NA Order for plotted developmentPlans 1-2.pdf · uploaded 13 Apr 2023Source
  • 7 Building Plan Approval / NA Order for plotted developmentPlans 3-4.pdf · uploaded 13 Apr 2023Source
  • 8 Building Plan Approval / NA Order for plotted developmentPlans 5-7.pdf · uploaded 13 Apr 2023Source
  • 2 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 13 Apr 2023Source
  • 2 Proforma of Agreement for saleAgreement for sale.pdf · uploaded 13 Apr 2023Source
  • 3 Proforma of Agreement for salesale agreement.pdf · uploaded 14 Apr 2023Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1.pdf · uploaded 20 Apr 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers certificate.pdf · uploaded 20 Apr 2023Source
  • 2 Details of encumbrancesENCUMBRANCE FOR LOAN.pdf · uploaded 19 May 2023Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A.pdf · uploaded 19 May 2023Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate.pdf · uploaded 19 May 2023Source
  • 4 Proforma of Agreement for saleFlat_Sale_Master File LATEST.pdf · uploaded 9 Jun 2023Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects certificate.pdf · uploaded 17 Jul 2023Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)engineer certificate.pdf · uploaded 17 Jul 2023Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect certificate.pdf · uploaded 16 Oct 2023Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer certificate.pdf · uploaded 16 Oct 2023Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate 06 23.pdf · uploaded 27 Oct 2023Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA certificate 09 23.pdf · uploaded 27 Oct 2023Source
  • 3 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 25 Nov 2023Source
  • 9 Copy of Layout Approval (in case of layout)Plans_1-3.pdf · uploaded 28 Nov 2023Source
  • 10 Copy of Layout Approval (in case of layout)Plans_4-end.pdf · uploaded 28 Nov 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 FY 22-23.pdf · uploaded 7 Dec 2023Source
  • 5 Proforma of Agreement for saleSale_Agreement_Dated.pdf · uploaded 13 Dec 2023Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate Dec 23.pdf · uploaded 18 Jan 2024Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate Dec 23.pdf · uploaded 18 Jan 2024Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)23 Q4 Form 3 CA Certificate.pdf · uploaded 23 Feb 2024Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1.pdf · uploaded 20 Apr 2024Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 26 Jul 2024Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 26 Jul 2024Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1.pdf · uploaded 17 Aug 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1.pdf · uploaded 18 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2.pdf · uploaded 18 Oct 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3.pdf · uploaded 23 Oct 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_certificate_qtr-2.pdf · uploaded 18 Dec 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2.pdf · uploaded 13 Jan 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)form 5 23-24.pdf · uploaded 13 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 14 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_certificate.pdf · uploaded 8 Feb 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1.pdf · uploaded 9 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2.pdf · uploaded 9 Apr 2025Source
  • Withdrawal Update Form 1architect form 1 june 25.pdf · uploaded 12 Nov 2025Source
  • Withdrawal Update Form 2form2 june 25.pdf · uploaded 12 Nov 2025Source
  • Withdrawal Update Form 3form3 season one june 25.pdf · uploaded 12 Nov 2025Source
  • Withdrawal Update Form 1Architect_certificate.pdf · uploaded 19 Nov 2025Source
  • Withdrawal Update Form 2engineer_certificate.pdf · uploaded 19 Nov 2025Source
  • Withdrawal Update Form 3form3 season one final.pdf · uploaded 19 Nov 2025Source
  • Withdrawal Update Form 1Architect_certificate.pdf · uploaded 13 Feb 2026Source
  • Withdrawal Update Form 2Engineering_certificate_qtr-3.pdf · uploaded 13 Feb 2026Source
  • Withdrawal Update Form 3CA_certificate.pdf · uploaded 13 Feb 2026Source
  • Withdrawal Update Form 1architech_certicates.pdf · uploaded 8 May 2026Source
  • Withdrawal Update Form 2Engineer_Certificate.pdf · uploaded 8 May 2026Source
  • Withdrawal Update Form 3form 3 04 05 26.pdf · uploaded 8 May 2026Source
  • Withdrawal Update Form 1form 1.pdf · uploaded 1 Aug 2026Source
  • Withdrawal Update Form 2form 2.pdf · uploaded 1 Aug 2026Source
  • Withdrawal Update Form 3form 3.pdf · uploaded 1 Aug 2026Source

Technical

  • Document1 Copy of Layout Approval (in case of layout) (5).pdf · uploaded 24 Mar 2022Source
  • Document2 Copy of Layout Approval (in case of layout) (1).pdf · uploaded 24 Mar 2022Source
  • Document3 Copy of Layout Approval (in case of layout).pdf · uploaded 24 Mar 2022Source
  • Document4 Copy of Layout Approval (in case of layout).pdf · uploaded 24 Mar 2022Source
  • Document5 Copy of Layout Approval (in case of layout).pdf · uploaded 24 Mar 2022Source
  • Document1 Copy of Layout Approval (in case of layout) (5).pdf · uploaded 24 Mar 2022Source
  • Document2 Copy of Layout Approval (in case of layout) (1).pdf · uploaded 24 Mar 2022Source
  • Document3 Copy of Layout Approval (in case of layout).pdf · uploaded 24 Mar 2022Source
  • Document4 Copy of Layout Approval (in case of layout).pdf · uploaded 24 Mar 2022Source
  • Document5 Copy of Layout Approval (in case of layout).pdf · uploaded 24 Mar 2022Source
  • DocumentPlans 1-2.pdf · uploaded 13 Apr 2023Source
  • DocumentPlans 3-4.pdf · uploaded 13 Apr 2023Source
  • DocumentPlans 5-7.pdf · uploaded 13 Apr 2023Source
  • DocumentPlans 1-2.pdf · uploaded 13 Apr 2023Source
  • DocumentPlans 3-4.pdf · uploaded 13 Apr 2023Source
  • DocumentPlans 5-7.pdf · uploaded 13 Apr 2023Source
  • DocumentPlans_1-3.pdf · uploaded 28 Nov 2023Source
  • DocumentPlans_4-end.pdf · uploaded 28 Nov 2023Source
  • DocumentPLANS HIGHLIGHTED.pdf · uploaded 8 Dec 2025Source

Technical (Architect)

  • Documentform 1.pdf · uploaded 18 Oct 2024Source
  • DocumentFORM 1.pdf · uploaded 14 Jan 2025Source
  • Documentform 1.pdf · uploaded 9 Apr 2025Source
  • Documentform 1.pdf · uploaded 25 Jul 2026Source

Technical (Engineer)

  • Documentform 2.pdf · uploaded 18 Oct 2024Source
  • Documentform 2.pdf · uploaded 13 Jan 2025Source
  • Documentform 2.pdf · uploaded 9 Apr 2025Source
  • Documentform 2.pdf · uploaded 25 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Chikanghar, Kalyan taluka

Survey, CTS, gat or plot numbers

3/4/23/4/4HISSA NO 3/4/1HISSA NO 7SUREVY NO 6SUREVY NO 7

Boundaries

North
Season Spring Co Op Hsg Soc
South
30 M Road
East
Maya Apartment
West
Sairam Apartment

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectCreations Architect Andinterior Designers—
Chartered accountantvijay kavrani—
Chartered accountantWatwaniand Associates—
EngineerVikas Ghokhle—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology