Corner Stone
Certificate SignedChikanghar, Thane 421301 |Promoter: Sarvodaya Amrut LLP
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Buildings
- 4
- Unit types
- 1BHK, 2BHK, Office space, Shop300 units in all
- Address
- Survey No.31, Hissa No. 05, Gholap Nagar, Kalyan WestPIN 421301
- Designated bank account
- 76
- Developed in phases
- Yes
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 4 months
- Registered
- 14 Dec 2021
- Promised
- 31 Dec 2026
- Revised
- 30 Apr 2027
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700032175 | 14 Dec 2021 | 31 Dec 2026 | 30 Apr 2027 | Sarvodaya Amrut LLP | Project page |
4 buildings
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Building 1-A wing | 19 | 100 |
| Building 1-B Wing | 19 | 145 |
| Building 2-C Wing | 19 | 26 |
| Building 2-D Wing | 20 | 29 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
180 of 300 units booked (60%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Building 1-A wing | 1BHK | 39.95 sq m · 430 sq ft | 4 | 4 |
| Building 1-A wing | 1BHK | 41.16 sq m · 443 sq ft | 9 | 5 |
| Building 1-A wing | 1BHK | 42.74 sq m · 460 sq ft | 24 | 6 |
| Building 1-A wing | 1BHK | 43.29 sq m · 466 sq ft | 1 | 0 |
| Building 1-A wing | 1BHK | 43.76 sq m · 471 sq ft | 1 | 0 |
| Building 1-A wing | 1BHK | 44.13 sq m · 475 sq ft | 16 | 9 |
| Building 1-A wing | 2BHK | 58.82 sq m · 633 sq ft | 23 | 22 |
| Building 1-A wing | Office space | 30.66 sq m · 330 sq ft | 1 | 1 |
Show all 71 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Building 1-A wing | Office space | 34.31 sq m · 369 sq ft | 1 | 1 |
| Building 1-A wing | Office space | 34.39 sq m · 370 sq ft | 1 | 1 |
| Building 1-A wing | Office space | 37.96 sq m · 409 sq ft | 1 | 0 |
| Building 1-A wing | Office space | 37.96 sq m · 409 sq ft | 1 | 1 |
| Building 1-A wing | Office space | 42.79 sq m · 461 sq ft | 1 | 0 |
| Building 1-A wing | Office space | 42.8 sq m · 461 sq ft | 1 | 0 |
| Building 1-A wing | Office space | 43.17 sq m · 465 sq ft | 1 | 0 |
| Building 1-A wing | Office space | 43.21 sq m · 465 sq ft | 1 | 0 |
| Building 1-A wing | Office space | 53.38 sq m · 575 sq ft | 1 | 0 |
| Building 1-A wing | Office space | 53.67 sq m · 578 sq ft | 1 | 1 |
| Building 1-A wing | Office space | 168.12 sq m · 1,810 sq ft | 1 | 0 |
| Building 1-A wing | Office space | 168.19 sq m · 1,810 sq ft | 1 | 1 |
| Building 1-A wing | Shop | 13.92 sq m · 150 sq ft | 1 | 1 |
| Building 1-A wing | Shop | 15.2 sq m · 164 sq ft | 1 | 1 |
| Building 1-A wing | Shop | 15.89 sq m · 171 sq ft | 1 | 1 |
| Building 1-A wing | Shop | 26.39 sq m · 284 sq ft | 1 | 1 |
| Building 1-A wing | Shop | 26.61 sq m · 286 sq ft | 1 | 1 |
| Building 1-A wing | Shop | 27.14 sq m · 292 sq ft | 1 | 1 |
| Building 1-A wing | Shop | 38.56 sq m · 415 sq ft | 1 | 1 |
| Building 1-A wing | Shop | 43.81 sq m · 472 sq ft | 1 | 1 |
| Building 1-A wing | Shop | 169.69 sq m · 1,827 sq ft | 1 | 0 |
| Building 1-B Wing | 1BHK | 39.95 sq m · 430 sq ft | 4 | 4 |
| Building 1-B Wing | 1BHK | 41.16 sq m · 443 sq ft | 12 | 3 |
| Building 1-B Wing | 1BHK | 41.81 sq m · 450 sq ft | 29 | 22 |
| Building 1-B Wing | 1BHK | 42.74 sq m · 460 sq ft | 25 | 9 |
| Building 1-B Wing | 1BHK | 44.13 sq m · 475 sq ft | 19 | 5 |
| Building 1-B Wing | 2BHK | 58.82 sq m · 633 sq ft | 26 | 22 |
| Building 1-B Wing | Office space | 30.65 sq m · 330 sq ft | 1 | 1 |
| Building 1-B Wing | Office space | 35.89 sq m · 386 sq ft | 1 | 1 |
| Building 1-B Wing | Office space | 35.91 sq m · 387 sq ft | 1 | 0 |
| Building 1-B Wing | Office space | 39.14 sq m · 421 sq ft | 1 | 0 |
| Building 1-B Wing | Office space | 42.7 sq m · 460 sq ft | 1 | 0 |
| Building 1-B Wing | Office space | 42.79 sq m · 461 sq ft | 1 | 0 |
| Building 1-B Wing | Office space | 43.76 sq m · 471 sq ft | 1 | 0 |
| Building 1-B Wing | Office space | 43.8 sq m · 471 sq ft | 1 | 0 |
| Building 1-B Wing | Office space | 44.18 sq m · 476 sq ft | 1 | 0 |
| Building 1-B Wing | Office space | 53.49 sq m · 576 sq ft | 1 | 1 |
| Building 1-B Wing | Office space | 53.55 sq m · 576 sq ft | 1 | 0 |
| Building 1-B Wing | Office space | 57.67 sq m · 621 sq ft | 1 | 0 |
| Building 1-B Wing | Office space | 57.7 sq m · 621 sq ft | 1 | 0 |
| Building 1-B Wing | Office space | 83.28 sq m · 896 sq ft | 1 | 0 |
| Building 1-B Wing | Office space | 95.69 sq m · 1,030 sq ft | 1 | 0 |
| Building 1-B Wing | Shop | 14.8 sq m · 159 sq ft | 1 | 1 |
| Building 1-B Wing | Shop | 18.35 sq m · 198 sq ft | 1 | 1 |
| Building 1-B Wing | Shop | 23.69 sq m · 255 sq ft | 3 | 3 |
| Building 1-B Wing | Shop | 23.75 sq m · 256 sq ft | 1 | 1 |
| Building 1-B Wing | Shop | 23.88 sq m · 257 sq ft | 1 | 1 |
| Building 1-B Wing | Shop | 26.53 sq m · 286 sq ft | 1 | 1 |
| Building 1-B Wing | Shop | 26.57 sq m · 286 sq ft | 1 | 1 |
| Building 1-B Wing | Shop | 28.53 sq m · 307 sq ft | 1 | 1 |
| Building 1-B Wing | Shop | 31.28 sq m · 337 sq ft | 1 | 1 |
| Building 1-B Wing | Shop | 36.52 sq m · 393 sq ft | 1 | 1 |
| Building 1-B Wing | Shop | 58.6 sq m · 631 sq ft | 1 | 0 |
| Building 1-B Wing | Shop | 86 sq m · 926 sq ft | 1 | 0 |
| Building 1-B Wing | Shop | 117.47 sq m · 1,264 sq ft | 1 | 0 |
| Building 2-C Wing | 2BHK | 45.26 sq m · 487 sq ft | 11 | 8 |
| Building 2-C Wing | 2BHK | 50.89 sq m · 548 sq ft | 9 | 7 |
| Building 2-C Wing | 2BHK | 58.05 sq m · 625 sq ft | 6 | 3 |
| Building 2-D Wing | 2BHK | 45.26 sq m · 487 sq ft | 12 | 12 |
| Building 2-D Wing | 2BHK | 50.89 sq m · 548 sq ft | 7 | 6 |
| Building 2-D Wing | 2BHK | 58.05 sq m · 625 sq ft | 6 | 4 |
| Building 2-D Wing | 2BHK | 58.83 sq m · 633 sq ft | 2 | 0 |
| Building 2-D Wing | 2BHK | 62.75 sq m · 675 sq ft | 2 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
1 document held by Deedo, 181 filings listed on MahaRERA's project page
Show all 182 documentsShow fewer documents
Migrated
- 1 Building Plan Approval / NA Order for plotted developmentPLAN 1.pdf · uploaded 2 Dec 2021Source
- 1 Commencement Certificates / NA Order for plotted developmentCC Krushi.pdf · uploaded 2 Dec 2021Source
- 1 Declaration in FORM BSALLP Affidavit Rera 1 .pdf · uploaded 2 Dec 2021Source
- 1 CERSAI detailsCERSAI_Search Report -Sarvodaya Amrut.pdf · uploaded 2 Dec 2021Source
- 1 Declaration about Commencement CertificateDocument 4 (1).pdf · uploaded 3 Dec 2021Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Revised Form 3 Sarvodya Amrut.pdf · uploaded 3 Dec 2021Source
- 1 Proforma of Allotment letterAgreement For Sale_Sarvodaya Amrut LLP_Sarvodaya Amrut.pdf · uploaded 3 Dec 2021Source
- 2 Proforma of Allotment letterAllotment Letter_Sarvodaya Amrut LLP_Sarvodaya Amrut.pdf · uploaded 3 Dec 2021Source
- 2 Copy of Layout Approval (in case of layout)Plan copy SALLP 10022022 new_rotated_compressed-1-2.pdf · uploaded 15 Feb 2022Source
- 2 Building Plan Approval / NA Order for plotted developmentPlan copy SALLP 10022022 new_rotated_compressed-3-5.pdf · uploaded 15 Feb 2022Source
- 3 Building Plan Approval / NA Order for plotted developmentPlan copy SALLP 10022022 new_rotated_compressed-6-9.pdf · uploaded 15 Feb 2022Source
- 2 Commencement Certificates / NA Order for plotted developmentCC SALLP 10022022 new_compressed.pdf · uploaded 15 Feb 2022Source
- 3 Proforma of Allotment letterAgreement For Sale_Sarvodaya Amrut LLP (1).pdf · uploaded 15 Feb 2022Source
- 2 Details of encumbrancesNo Encumbrance Dues.pdf · uploaded 17 Oct 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 bldg 1 wing A and B.pdf · uploaded 6 Apr 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 bldg 2 Wing C and D.pdf · uploaded 6 Apr 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 final_compressed.pdf · uploaded 6 Apr 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 SALLP Corner Stone FY 21-22.pdf · uploaded 21 Apr 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)SALLP Jan22 to mar22.pdf · uploaded 29 Apr 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)01-01-2022 Dec 21.pdf · uploaded 9 Aug 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)01-01-2022.pdf · uploaded 9 Aug 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)01-01-20222021.pdf · uploaded 9 Aug 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 March 22.pdf · uploaded 9 Aug 2023Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)June 22.pdf · uploaded 9 Aug 2023Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 DEC 22.pdf · uploaded 9 Aug 2023Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)DEC 22.pdf · uploaded 9 Aug 2023Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)March 2023.pdf · uploaded 9 Aug 2023Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 DEC 22.pdf · uploaded 9 Aug 2023Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)04-04-2023.pdf · uploaded 9 Aug 2023Source
- 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)June 2023.pdf · uploaded 9 Aug 2023Source
- 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)June 23.pdf · uploaded 9 Aug 2023Source
- 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)SALLP June 23.pdf · uploaded 9 Aug 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)June 23.pdf · uploaded 9 Aug 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)June 2023.pdf · uploaded 9 Aug 2023Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)SALLP June 23.pdf · uploaded 9 Aug 2023Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)SEPT 22.pdf · uploaded 9 Aug 2023Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 SALLP June 23.pdf · uploaded 9 Aug 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFORMAT A CORNER STONE.pdf · uploaded 10 Aug 2023Source
- 16 Architect’s Certificate of Percentage of Completion of Work (Form 1)SEPT 22.pdf · uploaded 18 Aug 2023Source
- 3 a Details of encumbrances concerned to FinanceTO WHOMSOEVER IT MAY CONCERN 08-08-2023.pdf · uploaded 2 Sep 2023Source
- 1 b Details of encumbrances concerned to LegalTO WHOMSOEVER IT MAY CONCERN 08-08-2023.pdf · uploaded 2 Sep 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsANNEXURE A OF SARVODAYA AMRUT LLP 09-08-2023.pdf · uploaded 2 Sep 2023Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsANNEXURE A OF RAMESH AMRUTLAL MEHTA 09-08-2023.pdf · uploaded 2 Sep 2023Source
- 3 Disclosure of Interest in Other Real Estate OrganizationsANNEXURE A OF DEEPAK RAMESH MEHTA 09-08-2023.pdf · uploaded 2 Sep 2023Source
- 4 Disclosure of Interest in Other Real Estate OrganizationsANNEXURE A OF RUCHIT KETAN MEHTA 09-08-2023.pdf · uploaded 2 Sep 2023Source
- 5 Disclosure of Interest in Other Real Estate OrganizationsANNEXURE A OF PRAFUL MANISH SHAH 09-08-2023.pdf · uploaded 2 Sep 2023Source
- 6 Disclosure of Interest in Other Real Estate OrganizationsANNEXURE A OF BHARAT KESHAVJI CHHEDA 09-08-2023.pdf · uploaded 2 Sep 2023Source
- 4 a Details of encumbrances concerned to FinanceEncumbrance (Finance).pdf · uploaded 8 Sep 2023Source
- 2 b Details of encumbrances concerned to LegalEncumbrance (Finance).pdf · uploaded 8 Sep 2023Source
- 1 Proforma of Agreement for saleAFS.pdf · uploaded 8 Sep 2023Source
- 17 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Corner stone Bldg No 2 Wing C 03-10-2023.pdf · uploaded 13 Dec 2023Source
- 18 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Corner stone Bldg No 2 Wing D 03-10-2023.pdf · uploaded 13 Dec 2023Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 of Sarvodaya Amrut LLP 13-12-2023.pdf · uploaded 13 Dec 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Enginners Certificate 170122.pdf · uploaded 14 Dec 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)engineers certificate 10-4-22.pdf · uploaded 14 Dec 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 of SALLP 14-12-2023.pdf · uploaded 14 Dec 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)DocScanner Dec 16, 2023 June 22.pdf · uploaded 16 Dec 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)DocScanner Dec 16, 2023 Sept 22.pdf · uploaded 16 Dec 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)engineers certificate 13-01-23.pdf · uploaded 16 Dec 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 SALLP March 23.pdf · uploaded 16 Dec 2023Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 SALLP June 23.pdf · uploaded 16 Dec 2023Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)engineers certficate 16-10-23.pdf · uploaded 16 Dec 2023Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)June 22 Form 3.pdf · uploaded 19 Dec 2023Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)Sep 22 Form 3.pdf · uploaded 19 Dec 2023Source
- 19 Architect’s Certificate of Percentage of Completion of Work (Form 1)SALLP FORM 1 DEC.pdf · uploaded 26 Feb 2024Source
- 20 Architect’s Certificate of Percentage of Completion of Work (Form 1)SALLP DEC.pdf · uploaded 26 Feb 2024Source
- 21 Architect’s Certificate of Percentage of Completion of Work (Form 1)SALLP 1 DEC.pdf · uploaded 26 Feb 2024Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)cornerstoneEngineer certificates Dec 23.pdf · uploaded 26 Feb 2024Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Q3 23-24.pdf · uploaded 26 Feb 2024Source
- 22 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 of Corner Stone Building No 1 Wing A - B 11-04-2024.pdf · uploaded 27 Apr 2024Source
- 23 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 of Corner Stone Building No 2 Wing C 11-04-2024.pdf · uploaded 27 Apr 2024Source
- 24 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 of Corner Stone Building No 2 Wing D 11-04-2024.pdf · uploaded 27 Apr 2024Source
- 25 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 of Corner Stone Building No 1 Wing A - B 11-04-2024.pdf · uploaded 27 Apr 2024Source
- 26 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 of Corner Stone Building No 2 Wing C 11-04-2024.pdf · uploaded 27 Apr 2024Source
- 27 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 of Corner Stone Building No 2 Wing D 11-04-2024.pdf · uploaded 27 Apr 2024Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 March 24 SALLP.pdf · uploaded 6 Jun 2024Source
- 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 SALLP March 24.pdf · uploaded 6 Jun 2024Source
- 28 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 of Corner Stone Bldg 1 WIng A - B 10-07-2024.pdf · uploaded 19 Jul 2024Source
- 29 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 of Corner Stone Bldg 2 WIng C 10-07-2024.pdf · uploaded 19 Jul 2024Source
- 30 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 of Corner Stone Bldg 2 WIng D 10-07-2024.pdf · uploaded 19 Jul 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 June 24.pdf · uploaded 23 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Corner Stone 14-07-2024.pdf · uploaded 23 Oct 2024Source
- 1 Deviation Report with respect to Allotment letterSA LLP Deviation Report (Allotment).pdf · uploaded 24 Oct 2024Source
- 1 Deviation Report with respect to model copy of AgreementSA LLP Deviation Report (AFS).pdf · uploaded 24 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)CA form 5 23-24 SALLP.pdf · uploaded 5 Dec 2024Source
- 1 Proforma of Agreement for saleAFS Cornerstone Resi 24-12-2024.pdf · uploaded 4 Jan 2025Source
- Form 5 (FY 2021-2022)21-22 SALLP.pdf · uploaded 5 Jul 2025Source
- Form 5 (FY 2022-2023)22-23_SALLP.pdf · uploaded 5 Jul 2025Source
- Form 5 (FY 2023-2024)23-34_SALLP.pdf · uploaded 5 Jul 2025Source
- Form 101-01-2022 Wing A, B, C, D, E Completed Dec 21.pdf · uploaded 10 Jul 2025Source
- Form 2Enginners Certificate 17-01-2022 Dec 21.pdf · uploaded 10 Jul 2025Source
- Form 3SALLP oct 21 to dec21.pdf · uploaded 10 Jul 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of Sold Unsold Inventory.pdf · uploaded 10 Jul 2025Source
- Form 1Form 1 March 22.pdf · uploaded 10 Jul 2025Source
- Form 2engineers certificate 10-4-22 March 22.pdf · uploaded 10 Jul 2025Source
- Form 3SALLP Jan22 to mar22.pdf · uploaded 10 Jul 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of Sold Unsold Inventory.pdf · uploaded 10 Jul 2025Source
- Form 1June 22 Completed.pdf · uploaded 10 Jul 2025Source
- Form 2Dec 16, 2023 June 22 FORM 2.pdf · uploaded 10 Jul 2025Source
- Form 3June 22 Form 3.pdf · uploaded 10 Jul 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of Sold Unsold Inventory.pdf · uploaded 10 Jul 2025Source
- Form 1Oct 22 Complete.pdf · uploaded 10 Jul 2025Source
- Form 2Dec 16, 2023 Sept 22 FORM 2.pdf · uploaded 10 Jul 2025Source
- Form 3Sep 22 Form 3.pdf · uploaded 10 Jul 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of Sold Unsold Inventory.pdf · uploaded 10 Jul 2025Source
- Form 1DEC 22 Completed.pdf · uploaded 10 Jul 2025Source
- Form 2engineers certificate 13-01-23 Dec 22.pdf · uploaded 10 Jul 2025Source
- Form 32 CA Certificate on Project Cost & Fund withdrawal (Form 3) Dec 22.pdf · uploaded 10 Jul 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of Sold Unsold Inventory.pdf · uploaded 10 Jul 2025Source
- Form 104-04-2023 Completed.pdf · uploaded 10 Jul 2025Source
- Form 2FORM 2 SALLP March 23.pdf · uploaded 10 Jul 2025Source
- Form 3Form 3 March 23.pdf · uploaded 10 Jul 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of Sold Unsold Inventory.pdf · uploaded 10 Jul 2025Source
- Form 1June 2023 Complete.pdf · uploaded 10 Jul 2025Source
- Form 2FORM 2 SALLP June 23.pdf · uploaded 10 Jul 2025Source
- Form 3Form 3 SALLP June 23.pdf · uploaded 10 Jul 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of Sold Unsold Inventory.pdf · uploaded 10 Jul 2025Source
- Form 1Form 1 Corner stone Bldg No 1 Wing A & B 03-10-2023 Completed.pdf · uploaded 10 Jul 2025Source
- Form 2engineers certficate 16-10-23.pdf · uploaded 10 Jul 2025Source
- Form 3Form 3 of Sarvodaya Amrut LLP Sept 2023.pdf · uploaded 10 Jul 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of Sold Unsold Inventory.pdf · uploaded 10 Jul 2025Source
- Form 1SALLP FORM 1 DEC Wing A, B, C & D Completed Dec 23.pdf · uploaded 10 Jul 2025Source
- Form 2cornerstoneEngineer certificates Dec 23.pdf · uploaded 10 Jul 2025Source
- Form 3Form 3 Q3 23-24 Dec 23.pdf · uploaded 10 Jul 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of Sold Unsold Inventory.pdf · uploaded 10 Jul 2025Source
- Form 1Form 1 of Corner Stone Building No 1 Wing A, B, C & D 11-04-2024 Completed.pdf · uploaded 10 Jul 2025Source
- Form 2FORM 2 March 24 SALLP.pdf · uploaded 10 Jul 2025Source
- Form 3Form 3 SALLP March 24.pdf · uploaded 10 Jul 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of Sold Unsold Inventory.pdf · uploaded 10 Jul 2025Source
- Form 1Form 1 of Corner Stone Bldg 1 WIng A, B, C & D 10-07-2024 Completed.pdf · uploaded 10 Jul 2025Source
- Form 2Form 2 Corner Stone 14-07-2024.pdf · uploaded 10 Jul 2025Source
- Form 3Form 3 June 24.pdf · uploaded 10 Jul 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of Sold Unsold Inventory.pdf · uploaded 10 Jul 2025Source
- Form 1Form 1 Sept 2024.pdf · uploaded 20 Jan 2026Source
- Form 2Engineer certificates sept 24.pdf · uploaded 20 Jan 2026Source
- Form 3RERA Form 3 Coner Stone Sept 2024.pdf · uploaded 20 Jan 2026Source
- Disclosure of Sold and Booked InventoryList of Sold and Unsold Inventory Sept 24.pdf · uploaded 20 Jan 2026Source
- Form 1Form 1 Dec 24.pdf · uploaded 20 Jan 2026Source
- Form 2Engineer certificates Dec 24.pdf · uploaded 20 Jan 2026Source
- Form 3RERA Form 3 Coner Stone Dec 2024.pdf · uploaded 20 Jan 2026Source
- Disclosure of Sold and Booked InventoryList of Sold and Unsold Inventory Dec 24.pdf · uploaded 20 Jan 2026Source
- Form 1Form 1 March 2025.pdf · uploaded 21 Jan 2026Source
- Form 2Engineer certificates March 25 signed.pdf · uploaded 21 Jan 2026Source
- Form 3FORM 3 SALLP March 25 Singned.pdf · uploaded 21 Jan 2026Source
- Disclosure of Sold and Booked InventoryList of Sold unsold units March 25.pdf · uploaded 21 Jan 2026Source
- Form 1Form1 June 2025.pdf · uploaded 21 Jan 2026Source
- Form 2Engineer certificates June 25 Signed.pdf · uploaded 21 Jan 2026Source
- Form 3Form 3 June 2025 Cornerstone Signed.pdf · uploaded 21 Jan 2026Source
- Disclosure of Sold and Booked InventoryList of Sold unsold units June 25.pdf · uploaded 21 Jan 2026Source
- Form 1Form 1 Q2.pdf · uploaded 15 May 2026Source
- Form 2Cornerstone form 2 sept 25.pdf · uploaded 15 May 2026Source
- Form 3Form 3 Cornerstone Sept 2025.pdf · uploaded 15 May 2026Source
- Disclosure of Sold and Booked InventoryList of Sold Unsold Inventory Sept 2025.pdf · uploaded 15 May 2026Source
- Form 1Form 1 Q III.pdf · uploaded 15 May 2026Source
- Form 2Form 2 of Sarvodaya Amrut LLP.pdf · uploaded 15 May 2026Source
- Form 3Form 3 of Sarvodaya Amrut LLP.pdf · uploaded 15 May 2026Source
- Disclosure of Sold and Booked InventoryList of Sold and Unsold Units Dec 2025.pdf · uploaded 15 May 2026Source
- Form 5 (FY 2024-2025)Form 5 Cornerestone.pdf · uploaded 18 May 2026Source
- Form 1Cornerstone Form 1 March 2026.pdf · uploaded 16 Jun 2026Source
- Form 2Cornerstone Form 2 March 2026.pdf · uploaded 16 Jun 2026Source
- Form 3Cornerstone Form 3 March 2026 new.pdf · uploaded 16 Jun 2026Source
- Disclosure of Sold and Booked InventoryCornerstone Inventory March 26.pdf · uploaded 16 Jun 2026Source
- Form 1Form 1 of Corner Stone June 26.pdf · uploaded 15 Sep 2026Source
- Form 2Cornerstone Engineer certificates June 26.pdf · uploaded 15 Sep 2026Source
- Form 3Form 3 Cornerstone30062026 Final.pdf · uploaded 15 Sep 2026Source
- Disclosure of Sold and Booked InventoryInventory Q1 FY 26-27.pdf · uploaded 15 Sep 2026Source
Technical
- DocumentPLAN 1.pdf · uploaded 2 Dec 2021Source
- DocumentPLAN 1.pdf · uploaded 2 Dec 2021Source
- DocumentPlan copy SALLP 10022022 new_rotated_compressed-1-2.pdf · uploaded 15 Feb 2022Source
- DocumentPlan copy SALLP 10022022 new_rotated_compressed-3-5.pdf · uploaded 15 Feb 2022Source
- DocumentPlan copy SALLP 10022022 new_rotated_compressed-6-9.pdf · uploaded 15 Feb 2022Source
Technical (Architect)
- DocumentForm 1 of Corner Stone Bldg 2 WIng D 10-07-2024.pdf · uploaded 19 Jul 2024Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Chikanghar, Kalyan taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- 18 Mtr Wide DP Road
- South
- Plot
- East
- 18 Mtr Wide DP Road
- West
- 12 Mtr Wide DP Road
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Beyond I Design Studio | — |
| Chartered accountant | Jigar Sangani | — |
| Chartered accountant | Rutuja Narsingh & Associates | — |
| Engineer | Devendra More | — |
Source: MahaRERA project page. Contact details are not shown.