Corner Stone

Certificate Signed

Chikanghar, Thane 421301 |Promoter: Sarvodaya Amrut LLP

14 Dec 2021Registered with MahaRERA
31 Dec 2026Promised completion
30 Apr 2027Revised completionPushed back 4 months
4Buildings
300Units registered180 booked (60%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Buildings
4
Unit types
1BHK, 2BHK, Office space, Shop300 units in all
Address
Survey No.31, Hissa No. 05, Gholap Nagar, Kalyan WestPIN 421301
Designated bank account
76
Developed in phases
Yes

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 4 months

Registered
14 Dec 2021
Promised
31 Dec 2026
Revised
30 Apr 2027

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5170003217514 Dec 202131 Dec 202630 Apr 2027Sarvodaya Amrut LLPProject page

4 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Building 1-A wing19100
Building 1-B Wing19145
Building 2-C Wing1926
Building 2-D Wing2029

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

180 of 300 units booked (60%), as the promoter reported to MahaRERA

1BHK · 144 units2BHK · 104 unitsOffice space · 28 unitsShop · 24 units
BuildingTypeCarpet areaUnitsBooked
Building 1-A wing1BHK39.95 sq m · 430 sq ft44
Building 1-A wing1BHK41.16 sq m · 443 sq ft95
Building 1-A wing1BHK42.74 sq m · 460 sq ft246
Building 1-A wing1BHK43.29 sq m · 466 sq ft10
Building 1-A wing1BHK43.76 sq m · 471 sq ft10
Building 1-A wing1BHK44.13 sq m · 475 sq ft169
Building 1-A wing2BHK58.82 sq m · 633 sq ft2322
Building 1-A wingOffice space30.66 sq m · 330 sq ft11
Show all 71 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
Building 1-A wingOffice space34.31 sq m · 369 sq ft11
Building 1-A wingOffice space34.39 sq m · 370 sq ft11
Building 1-A wingOffice space37.96 sq m · 409 sq ft10
Building 1-A wingOffice space37.96 sq m · 409 sq ft11
Building 1-A wingOffice space42.79 sq m · 461 sq ft10
Building 1-A wingOffice space42.8 sq m · 461 sq ft10
Building 1-A wingOffice space43.17 sq m · 465 sq ft10
Building 1-A wingOffice space43.21 sq m · 465 sq ft10
Building 1-A wingOffice space53.38 sq m · 575 sq ft10
Building 1-A wingOffice space53.67 sq m · 578 sq ft11
Building 1-A wingOffice space168.12 sq m · 1,810 sq ft10
Building 1-A wingOffice space168.19 sq m · 1,810 sq ft11
Building 1-A wingShop13.92 sq m · 150 sq ft11
Building 1-A wingShop15.2 sq m · 164 sq ft11
Building 1-A wingShop15.89 sq m · 171 sq ft11
Building 1-A wingShop26.39 sq m · 284 sq ft11
Building 1-A wingShop26.61 sq m · 286 sq ft11
Building 1-A wingShop27.14 sq m · 292 sq ft11
Building 1-A wingShop38.56 sq m · 415 sq ft11
Building 1-A wingShop43.81 sq m · 472 sq ft11
Building 1-A wingShop169.69 sq m · 1,827 sq ft10
Building 1-B Wing1BHK39.95 sq m · 430 sq ft44
Building 1-B Wing1BHK41.16 sq m · 443 sq ft123
Building 1-B Wing1BHK41.81 sq m · 450 sq ft2922
Building 1-B Wing1BHK42.74 sq m · 460 sq ft259
Building 1-B Wing1BHK44.13 sq m · 475 sq ft195
Building 1-B Wing2BHK58.82 sq m · 633 sq ft2622
Building 1-B WingOffice space30.65 sq m · 330 sq ft11
Building 1-B WingOffice space35.89 sq m · 386 sq ft11
Building 1-B WingOffice space35.91 sq m · 387 sq ft10
Building 1-B WingOffice space39.14 sq m · 421 sq ft10
Building 1-B WingOffice space42.7 sq m · 460 sq ft10
Building 1-B WingOffice space42.79 sq m · 461 sq ft10
Building 1-B WingOffice space43.76 sq m · 471 sq ft10
Building 1-B WingOffice space43.8 sq m · 471 sq ft10
Building 1-B WingOffice space44.18 sq m · 476 sq ft10
Building 1-B WingOffice space53.49 sq m · 576 sq ft11
Building 1-B WingOffice space53.55 sq m · 576 sq ft10
Building 1-B WingOffice space57.67 sq m · 621 sq ft10
Building 1-B WingOffice space57.7 sq m · 621 sq ft10
Building 1-B WingOffice space83.28 sq m · 896 sq ft10
Building 1-B WingOffice space95.69 sq m · 1,030 sq ft10
Building 1-B WingShop14.8 sq m · 159 sq ft11
Building 1-B WingShop18.35 sq m · 198 sq ft11
Building 1-B WingShop23.69 sq m · 255 sq ft33
Building 1-B WingShop23.75 sq m · 256 sq ft11
Building 1-B WingShop23.88 sq m · 257 sq ft11
Building 1-B WingShop26.53 sq m · 286 sq ft11
Building 1-B WingShop26.57 sq m · 286 sq ft11
Building 1-B WingShop28.53 sq m · 307 sq ft11
Building 1-B WingShop31.28 sq m · 337 sq ft11
Building 1-B WingShop36.52 sq m · 393 sq ft11
Building 1-B WingShop58.6 sq m · 631 sq ft10
Building 1-B WingShop86 sq m · 926 sq ft10
Building 1-B WingShop117.47 sq m · 1,264 sq ft10
Building 2-C Wing2BHK45.26 sq m · 487 sq ft118
Building 2-C Wing2BHK50.89 sq m · 548 sq ft97
Building 2-C Wing2BHK58.05 sq m · 625 sq ft63
Building 2-D Wing2BHK45.26 sq m · 487 sq ft1212
Building 2-D Wing2BHK50.89 sq m · 548 sq ft76
Building 2-D Wing2BHK58.05 sq m · 625 sq ft64
Building 2-D Wing2BHK58.83 sq m · 633 sq ft20
Building 2-D Wing2BHK62.75 sq m · 675 sq ft20

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 181 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPAN SALLP.pdf · uploaded 2 Dec 2021Source

Legal

  • Legal Title reportSALLP Title Rera .pdf · uploaded 2 Dec 2021Source
  • Declaration Form BSALLP Affidavit Rera 1 .pdf · uploaded 2 Dec 2021Source

Migrated

  • 1 PAN CardPAN SALLP.pdf · uploaded 2 Dec 2021Source
  • 1 Copy of the legal title reportSALLP Title Rera .pdf · uploaded 2 Dec 2021Source
  • 1 Details of encumbrancesSALLP NO ENCUMBARNCE.pdf · uploaded 2 Dec 2021Source
  • 1 Copy of Layout Approval (in case of layout)PLAN 1.pdf · uploaded 2 Dec 2021Source
Show all 182 documentsShow fewer documents

Migrated

  • 1 Building Plan Approval / NA Order for plotted developmentPLAN 1.pdf · uploaded 2 Dec 2021Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC Krushi.pdf · uploaded 2 Dec 2021Source
  • 1 Declaration in FORM BSALLP Affidavit Rera 1 .pdf · uploaded 2 Dec 2021Source
  • 1 CERSAI detailsCERSAI_Search Report -Sarvodaya Amrut.pdf · uploaded 2 Dec 2021Source
  • 1 Declaration about Commencement CertificateDocument 4 (1).pdf · uploaded 3 Dec 2021Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Revised Form 3 Sarvodya Amrut.pdf · uploaded 3 Dec 2021Source
  • 1 Proforma of Allotment letterAgreement For Sale_Sarvodaya Amrut LLP_Sarvodaya Amrut.pdf · uploaded 3 Dec 2021Source
  • 2 Proforma of Allotment letterAllotment Letter_Sarvodaya Amrut LLP_Sarvodaya Amrut.pdf · uploaded 3 Dec 2021Source
  • 2 Copy of Layout Approval (in case of layout)Plan copy SALLP 10022022 new_rotated_compressed-1-2.pdf · uploaded 15 Feb 2022Source
  • 2 Building Plan Approval / NA Order for plotted developmentPlan copy SALLP 10022022 new_rotated_compressed-3-5.pdf · uploaded 15 Feb 2022Source
  • 3 Building Plan Approval / NA Order for plotted developmentPlan copy SALLP 10022022 new_rotated_compressed-6-9.pdf · uploaded 15 Feb 2022Source
  • 2 Commencement Certificates / NA Order for plotted developmentCC SALLP 10022022 new_compressed.pdf · uploaded 15 Feb 2022Source
  • 3 Proforma of Allotment letterAgreement For Sale_Sarvodaya Amrut LLP (1).pdf · uploaded 15 Feb 2022Source
  • 2 Details of encumbrancesNo Encumbrance Dues.pdf · uploaded 17 Oct 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 bldg 1 wing A and B.pdf · uploaded 6 Apr 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 bldg 2 Wing C and D.pdf · uploaded 6 Apr 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 final_compressed.pdf · uploaded 6 Apr 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 SALLP Corner Stone FY 21-22.pdf · uploaded 21 Apr 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)SALLP Jan22 to mar22.pdf · uploaded 29 Apr 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)01-01-2022 Dec 21.pdf · uploaded 9 Aug 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)01-01-2022.pdf · uploaded 9 Aug 2023Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)01-01-20222021.pdf · uploaded 9 Aug 2023Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 March 22.pdf · uploaded 9 Aug 2023Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)June 22.pdf · uploaded 9 Aug 2023Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 DEC 22.pdf · uploaded 9 Aug 2023Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)DEC 22.pdf · uploaded 9 Aug 2023Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)March 2023.pdf · uploaded 9 Aug 2023Source
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 DEC 22.pdf · uploaded 9 Aug 2023Source
  • 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)04-04-2023.pdf · uploaded 9 Aug 2023Source
  • 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)June 2023.pdf · uploaded 9 Aug 2023Source
  • 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)June 23.pdf · uploaded 9 Aug 2023Source
  • 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)SALLP June 23.pdf · uploaded 9 Aug 2023Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)June 23.pdf · uploaded 9 Aug 2023Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)June 2023.pdf · uploaded 9 Aug 2023Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)SALLP June 23.pdf · uploaded 9 Aug 2023Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)SEPT 22.pdf · uploaded 9 Aug 2023Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 SALLP June 23.pdf · uploaded 9 Aug 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFORMAT A CORNER STONE.pdf · uploaded 10 Aug 2023Source
  • 16 Architect’s Certificate of Percentage of Completion of Work (Form 1)SEPT 22.pdf · uploaded 18 Aug 2023Source
  • 3 a Details of encumbrances concerned to FinanceTO WHOMSOEVER IT MAY CONCERN 08-08-2023.pdf · uploaded 2 Sep 2023Source
  • 1 b Details of encumbrances concerned to LegalTO WHOMSOEVER IT MAY CONCERN 08-08-2023.pdf · uploaded 2 Sep 2023Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsANNEXURE A OF SARVODAYA AMRUT LLP 09-08-2023.pdf · uploaded 2 Sep 2023Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsANNEXURE A OF RAMESH AMRUTLAL MEHTA 09-08-2023.pdf · uploaded 2 Sep 2023Source
  • 3 Disclosure of Interest in Other Real Estate OrganizationsANNEXURE A OF DEEPAK RAMESH MEHTA 09-08-2023.pdf · uploaded 2 Sep 2023Source
  • 4 Disclosure of Interest in Other Real Estate OrganizationsANNEXURE A OF RUCHIT KETAN MEHTA 09-08-2023.pdf · uploaded 2 Sep 2023Source
  • 5 Disclosure of Interest in Other Real Estate OrganizationsANNEXURE A OF PRAFUL MANISH SHAH 09-08-2023.pdf · uploaded 2 Sep 2023Source
  • 6 Disclosure of Interest in Other Real Estate OrganizationsANNEXURE A OF BHARAT KESHAVJI CHHEDA 09-08-2023.pdf · uploaded 2 Sep 2023Source
  • 4 a Details of encumbrances concerned to FinanceEncumbrance (Finance).pdf · uploaded 8 Sep 2023Source
  • 2 b Details of encumbrances concerned to LegalEncumbrance (Finance).pdf · uploaded 8 Sep 2023Source
  • 1 Proforma of Agreement for saleAFS.pdf · uploaded 8 Sep 2023Source
  • 17 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Corner stone Bldg No 2 Wing C 03-10-2023.pdf · uploaded 13 Dec 2023Source
  • 18 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Corner stone Bldg No 2 Wing D 03-10-2023.pdf · uploaded 13 Dec 2023Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 of Sarvodaya Amrut LLP 13-12-2023.pdf · uploaded 13 Dec 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Enginners Certificate 170122.pdf · uploaded 14 Dec 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)engineers certificate 10-4-22.pdf · uploaded 14 Dec 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 of SALLP 14-12-2023.pdf · uploaded 14 Dec 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)DocScanner Dec 16, 2023 June 22.pdf · uploaded 16 Dec 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)DocScanner Dec 16, 2023 Sept 22.pdf · uploaded 16 Dec 2023Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)engineers certificate 13-01-23.pdf · uploaded 16 Dec 2023Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 SALLP March 23.pdf · uploaded 16 Dec 2023Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 SALLP June 23.pdf · uploaded 16 Dec 2023Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)engineers certficate 16-10-23.pdf · uploaded 16 Dec 2023Source
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)June 22 Form 3.pdf · uploaded 19 Dec 2023Source
  • 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)Sep 22 Form 3.pdf · uploaded 19 Dec 2023Source
  • 19 Architect’s Certificate of Percentage of Completion of Work (Form 1)SALLP FORM 1 DEC.pdf · uploaded 26 Feb 2024Source
  • 20 Architect’s Certificate of Percentage of Completion of Work (Form 1)SALLP DEC.pdf · uploaded 26 Feb 2024Source
  • 21 Architect’s Certificate of Percentage of Completion of Work (Form 1)SALLP 1 DEC.pdf · uploaded 26 Feb 2024Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)cornerstoneEngineer certificates Dec 23.pdf · uploaded 26 Feb 2024Source
  • 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Q3 23-24.pdf · uploaded 26 Feb 2024Source
  • 22 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 of Corner Stone Building No 1 Wing A - B 11-04-2024.pdf · uploaded 27 Apr 2024Source
  • 23 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 of Corner Stone Building No 2 Wing C 11-04-2024.pdf · uploaded 27 Apr 2024Source
  • 24 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 of Corner Stone Building No 2 Wing D 11-04-2024.pdf · uploaded 27 Apr 2024Source
  • 25 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 of Corner Stone Building No 1 Wing A - B 11-04-2024.pdf · uploaded 27 Apr 2024Source
  • 26 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 of Corner Stone Building No 2 Wing C 11-04-2024.pdf · uploaded 27 Apr 2024Source
  • 27 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 of Corner Stone Building No 2 Wing D 11-04-2024.pdf · uploaded 27 Apr 2024Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 March 24 SALLP.pdf · uploaded 6 Jun 2024Source
  • 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 SALLP March 24.pdf · uploaded 6 Jun 2024Source
  • 28 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 of Corner Stone Bldg 1 WIng A - B 10-07-2024.pdf · uploaded 19 Jul 2024Source
  • 29 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 of Corner Stone Bldg 2 WIng C 10-07-2024.pdf · uploaded 19 Jul 2024Source
  • 30 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 of Corner Stone Bldg 2 WIng D 10-07-2024.pdf · uploaded 19 Jul 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 June 24.pdf · uploaded 23 Oct 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Corner Stone 14-07-2024.pdf · uploaded 23 Oct 2024Source
  • 1 Deviation Report with respect to Allotment letterSA LLP Deviation Report (Allotment).pdf · uploaded 24 Oct 2024Source
  • 1 Deviation Report with respect to model copy of AgreementSA LLP Deviation Report (AFS).pdf · uploaded 24 Oct 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)CA form 5 23-24 SALLP.pdf · uploaded 5 Dec 2024Source
  • 1 Proforma of Agreement for saleAFS Cornerstone Resi 24-12-2024.pdf · uploaded 4 Jan 2025Source
  • Form 5 (FY 2021-2022)21-22 SALLP.pdf · uploaded 5 Jul 2025Source
  • Form 5 (FY 2022-2023)22-23_SALLP.pdf · uploaded 5 Jul 2025Source
  • Form 5 (FY 2023-2024)23-34_SALLP.pdf · uploaded 5 Jul 2025Source
  • Form 101-01-2022 Wing A, B, C, D, E Completed Dec 21.pdf · uploaded 10 Jul 2025Source
  • Form 2Enginners Certificate 17-01-2022 Dec 21.pdf · uploaded 10 Jul 2025Source
  • Form 3SALLP oct 21 to dec21.pdf · uploaded 10 Jul 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure of Sold Unsold Inventory.pdf · uploaded 10 Jul 2025Source
  • Form 1Form 1 March 22.pdf · uploaded 10 Jul 2025Source
  • Form 2engineers certificate 10-4-22 March 22.pdf · uploaded 10 Jul 2025Source
  • Form 3SALLP Jan22 to mar22.pdf · uploaded 10 Jul 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure of Sold Unsold Inventory.pdf · uploaded 10 Jul 2025Source
  • Form 1June 22 Completed.pdf · uploaded 10 Jul 2025Source
  • Form 2Dec 16, 2023 June 22 FORM 2.pdf · uploaded 10 Jul 2025Source
  • Form 3June 22 Form 3.pdf · uploaded 10 Jul 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure of Sold Unsold Inventory.pdf · uploaded 10 Jul 2025Source
  • Form 1Oct 22 Complete.pdf · uploaded 10 Jul 2025Source
  • Form 2Dec 16, 2023 Sept 22 FORM 2.pdf · uploaded 10 Jul 2025Source
  • Form 3Sep 22 Form 3.pdf · uploaded 10 Jul 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure of Sold Unsold Inventory.pdf · uploaded 10 Jul 2025Source
  • Form 1DEC 22 Completed.pdf · uploaded 10 Jul 2025Source
  • Form 2engineers certificate 13-01-23 Dec 22.pdf · uploaded 10 Jul 2025Source
  • Form 32 CA Certificate on Project Cost & Fund withdrawal (Form 3) Dec 22.pdf · uploaded 10 Jul 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure of Sold Unsold Inventory.pdf · uploaded 10 Jul 2025Source
  • Form 104-04-2023 Completed.pdf · uploaded 10 Jul 2025Source
  • Form 2FORM 2 SALLP March 23.pdf · uploaded 10 Jul 2025Source
  • Form 3Form 3 March 23.pdf · uploaded 10 Jul 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure of Sold Unsold Inventory.pdf · uploaded 10 Jul 2025Source
  • Form 1June 2023 Complete.pdf · uploaded 10 Jul 2025Source
  • Form 2FORM 2 SALLP June 23.pdf · uploaded 10 Jul 2025Source
  • Form 3Form 3 SALLP June 23.pdf · uploaded 10 Jul 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure of Sold Unsold Inventory.pdf · uploaded 10 Jul 2025Source
  • Form 1Form 1 Corner stone Bldg No 1 Wing A & B 03-10-2023 Completed.pdf · uploaded 10 Jul 2025Source
  • Form 2engineers certficate 16-10-23.pdf · uploaded 10 Jul 2025Source
  • Form 3Form 3 of Sarvodaya Amrut LLP Sept 2023.pdf · uploaded 10 Jul 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure of Sold Unsold Inventory.pdf · uploaded 10 Jul 2025Source
  • Form 1SALLP FORM 1 DEC Wing A, B, C & D Completed Dec 23.pdf · uploaded 10 Jul 2025Source
  • Form 2cornerstoneEngineer certificates Dec 23.pdf · uploaded 10 Jul 2025Source
  • Form 3Form 3 Q3 23-24 Dec 23.pdf · uploaded 10 Jul 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure of Sold Unsold Inventory.pdf · uploaded 10 Jul 2025Source
  • Form 1Form 1 of Corner Stone Building No 1 Wing A, B, C & D 11-04-2024 Completed.pdf · uploaded 10 Jul 2025Source
  • Form 2FORM 2 March 24 SALLP.pdf · uploaded 10 Jul 2025Source
  • Form 3Form 3 SALLP March 24.pdf · uploaded 10 Jul 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure of Sold Unsold Inventory.pdf · uploaded 10 Jul 2025Source
  • Form 1Form 1 of Corner Stone Bldg 1 WIng A, B, C & D 10-07-2024 Completed.pdf · uploaded 10 Jul 2025Source
  • Form 2Form 2 Corner Stone 14-07-2024.pdf · uploaded 10 Jul 2025Source
  • Form 3Form 3 June 24.pdf · uploaded 10 Jul 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure of Sold Unsold Inventory.pdf · uploaded 10 Jul 2025Source
  • Form 1Form 1 Sept 2024.pdf · uploaded 20 Jan 2026Source
  • Form 2Engineer certificates sept 24.pdf · uploaded 20 Jan 2026Source
  • Form 3RERA Form 3 Coner Stone Sept 2024.pdf · uploaded 20 Jan 2026Source
  • Disclosure of Sold and Booked InventoryList of Sold and Unsold Inventory Sept 24.pdf · uploaded 20 Jan 2026Source
  • Form 1Form 1 Dec 24.pdf · uploaded 20 Jan 2026Source
  • Form 2Engineer certificates Dec 24.pdf · uploaded 20 Jan 2026Source
  • Form 3RERA Form 3 Coner Stone Dec 2024.pdf · uploaded 20 Jan 2026Source
  • Disclosure of Sold and Booked InventoryList of Sold and Unsold Inventory Dec 24.pdf · uploaded 20 Jan 2026Source
  • Form 1Form 1 March 2025.pdf · uploaded 21 Jan 2026Source
  • Form 2Engineer certificates March 25 signed.pdf · uploaded 21 Jan 2026Source
  • Form 3FORM 3 SALLP March 25 Singned.pdf · uploaded 21 Jan 2026Source
  • Disclosure of Sold and Booked InventoryList of Sold unsold units March 25.pdf · uploaded 21 Jan 2026Source
  • Form 1Form1 June 2025.pdf · uploaded 21 Jan 2026Source
  • Form 2Engineer certificates June 25 Signed.pdf · uploaded 21 Jan 2026Source
  • Form 3Form 3 June 2025 Cornerstone Signed.pdf · uploaded 21 Jan 2026Source
  • Disclosure of Sold and Booked InventoryList of Sold unsold units June 25.pdf · uploaded 21 Jan 2026Source
  • Form 1Form 1 Q2.pdf · uploaded 15 May 2026Source
  • Form 2Cornerstone form 2 sept 25.pdf · uploaded 15 May 2026Source
  • Form 3Form 3 Cornerstone Sept 2025.pdf · uploaded 15 May 2026Source
  • Disclosure of Sold and Booked InventoryList of Sold Unsold Inventory Sept 2025.pdf · uploaded 15 May 2026Source
  • Form 1Form 1 Q III.pdf · uploaded 15 May 2026Source
  • Form 2Form 2 of Sarvodaya Amrut LLP.pdf · uploaded 15 May 2026Source
  • Form 3Form 3 of Sarvodaya Amrut LLP.pdf · uploaded 15 May 2026Source
  • Disclosure of Sold and Booked InventoryList of Sold and Unsold Units Dec 2025.pdf · uploaded 15 May 2026Source
  • Form 5 (FY 2024-2025)Form 5 Cornerestone.pdf · uploaded 18 May 2026Source
  • Form 1Cornerstone Form 1 March 2026.pdf · uploaded 16 Jun 2026Source
  • Form 2Cornerstone Form 2 March 2026.pdf · uploaded 16 Jun 2026Source
  • Form 3Cornerstone Form 3 March 2026 new.pdf · uploaded 16 Jun 2026Source
  • Disclosure of Sold and Booked InventoryCornerstone Inventory March 26.pdf · uploaded 16 Jun 2026Source
  • Form 1Form 1 of Corner Stone June 26.pdf · uploaded 15 Sep 2026Source
  • Form 2Cornerstone Engineer certificates June 26.pdf · uploaded 15 Sep 2026Source
  • Form 3Form 3 Cornerstone30062026 Final.pdf · uploaded 15 Sep 2026Source
  • Disclosure of Sold and Booked InventoryInventory Q1 FY 26-27.pdf · uploaded 15 Sep 2026Source

Technical

  • DocumentPLAN 1.pdf · uploaded 2 Dec 2021Source
  • DocumentPLAN 1.pdf · uploaded 2 Dec 2021Source
  • DocumentPlan copy SALLP 10022022 new_rotated_compressed-1-2.pdf · uploaded 15 Feb 2022Source
  • DocumentPlan copy SALLP 10022022 new_rotated_compressed-3-5.pdf · uploaded 15 Feb 2022Source
  • DocumentPlan copy SALLP 10022022 new_rotated_compressed-6-9.pdf · uploaded 15 Feb 2022Source

Technical (Architect)

  • DocumentForm 1 of Corner Stone Bldg 2 WIng D 10-07-2024.pdf · uploaded 19 Jul 2024Source

Technical (Engineer)

  • DocumentFORM 2 March 24 SALLP.pdf · uploaded 6 Jun 2024Source
  • DocumentForm 2 Corner Stone 14-07-2024.pdf · uploaded 23 Oct 2024Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Chikanghar, Kalyan taluka

Survey, CTS, gat or plot numbers

Hissa No. 05Survey No.31

Boundaries

North
18 Mtr Wide DP Road
South
Plot
East
18 Mtr Wide DP Road
West
12 Mtr Wide DP Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectBeyond I Design Studio—
Chartered accountantJigar Sangani—
Chartered accountantRutuja Narsingh & Associates—
EngineerDevendra More—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology