Shiwnari, Ratnagiri 415712 |Promoter: Pprom Developers Private Limited

Residential / Group HousingRERAP52800052874
5 Oct 2023Registered with MahaRERA
31 Dec 2030Promised completion
30 Apr 2031Revised completionPushed back 4 months
56Buildings
56Units registered0 booked (0%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Buildings
56
Unit types
Bungalow56 units in all
Address
Gut No 299, Gut No 337, Village Shivnari, DapoliPIN 415712
Designated bank account
82
Developed in phases
Yes

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 4 months

Registered
5 Oct 2023
Promised
31 Dec 2030
Revised
30 Apr 2031

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P528000528745 Oct 202331 Dec 203030 Apr 2031Pprom Developers Private LimitedProject page

56 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
A-111
A-1011
A-1111
A-211
A-311
A-411
A-511
A-611
Show all 56 buildingsShow fewer buildings
BuildingSanctioned floorsUnits
A-711
A-811
A-911
B-111
B-211
B-311
C-111
C-1011
C-1111
C-1211
C-1311
C-1411
C-211
C-311
C-411
C-511
C-611
C-711
C-811
C-911
D1-D211
E1-E211
F-121
F-221
F-321
F-421
F-521
F-621
G-121
G-221
H-111
I-121
I-1021
I-1121
I-1221
I-221
I-321
I-421
I-521
I-621
I-721
I-821
I-921
J-121
K-121
K-221
K-321
K-421

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 of 56 units booked (0%), as the promoter reported to MahaRERA

Bungalow · 56 units
BuildingTypeCarpet areaUnitsBooked
A-1Bungalow57.5 sq m · 619 sq ft10
A-10Bungalow58 sq m · 624 sq ft10
A-11Bungalow58 sq m · 624 sq ft10
A-2Bungalow58 sq m · 624 sq ft10
A-3Bungalow58 sq m · 624 sq ft10
A-4Bungalow58 sq m · 624 sq ft10
A-5Bungalow58 sq m · 624 sq ft10
A-6Bungalow58 sq m · 624 sq ft10
Show all 56 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
A-7Bungalow58 sq m · 624 sq ft10
A-8Bungalow58 sq m · 624 sq ft10
A-9Bungalow58 sq m · 624 sq ft10
B-1Bungalow58 sq m · 624 sq ft10
B-2Bungalow58 sq m · 624 sq ft10
B-3Bungalow58 sq m · 624 sq ft10
C-1Bungalow58 sq m · 624 sq ft10
C-10Bungalow58 sq m · 624 sq ft10
C-11Bungalow58 sq m · 624 sq ft10
C-12Bungalow58 sq m · 624 sq ft10
C-13Bungalow58 sq m · 624 sq ft10
C-14Bungalow58 sq m · 624 sq ft10
C-2Bungalow58 sq m · 624 sq ft10
C-3Bungalow58 sq m · 624 sq ft10
C-4Bungalow58 sq m · 624 sq ft10
C-5Bungalow58 sq m · 624 sq ft10
C-6Bungalow58 sq m · 624 sq ft10
C-7Bungalow58 sq m · 624 sq ft10
C-8Bungalow58 sq m · 624 sq ft10
C-9Bungalow58 sq m · 624 sq ft10
D1-D2Bungalow58 sq m · 624 sq ft10
E1-E2Bungalow58 sq m · 624 sq ft10
F-1Bungalow86 sq m · 926 sq ft10
F-2Bungalow86 sq m · 926 sq ft10
F-3Bungalow86 sq m · 926 sq ft10
F-4Bungalow86 sq m · 926 sq ft10
F-5Bungalow86 sq m · 926 sq ft10
F-6Bungalow86 sq m · 926 sq ft10
G-1Bungalow89 sq m · 958 sq ft10
G-2Bungalow89 sq m · 958 sq ft10
H-1Bungalow92 sq m · 990 sq ft10
I-1Bungalow92 sq m · 990 sq ft10
I-10Bungalow88 sq m · 947 sq ft10
I-11Bungalow88 sq m · 947 sq ft10
I-12Bungalow88 sq m · 947 sq ft10
I-2Bungalow88 sq m · 947 sq ft10
I-3Bungalow88 sq m · 947 sq ft10
I-4Bungalow88 sq m · 947 sq ft10
I-5Bungalow88 sq m · 947 sq ft10
I-6Bungalow88 sq m · 947 sq ft10
I-7Bungalow88 sq m · 947 sq ft10
I-8Bungalow88 sq m · 947 sq ft10
I-9Bungalow88 sq m · 947 sq ft10
J-1Bungalow88 sq m · 947 sq ft10
K-1Bungalow214 sq m · 2,303 sq ft10
K-2Bungalow214 sq m · 2,303 sq ft10
K-3Bungalow214 sq m · 2,303 sq ft10
K-4Bungalow214 sq m · 2,303 sq ft10

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 119 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardDEVELOPERS PAN CARD.pdf · uploaded 29 Oct 2022Source

Legal

  • Legal Title reportFORMAT A.pdf · uploaded 20 Nov 2022Source
  • Declaration Form BSelf Declaration sandeep Sir_compressed.pdf · uploaded 20 Nov 2022Source
  • Other – LegalF TYPE STRUCTURE NEW.pdf · uploaded 8 Dec 2022Source
  • Other – Legal7 12 extract of land.pdf · uploaded 24 Jul 2023Source

Migrated

  • 1 PAN CardDEVELOPERS PAN CARD.pdf · uploaded 29 Oct 2022Source
  • 1 a Details of encumbrances concerned to FinanceENCUMBERANCE LETTER_NAKSHATRA.pdf · uploaded 29 Oct 2022Source
Show all 120 documentsShow fewer documents

Migrated

  • 1 b Details of encumbrances concerned to LegalENCUMBERANCE LETTER_NAKSHATRA.pdf · uploaded 29 Oct 2022Source
  • 1 Copy of Layout Approval (in case of layout)NA ORDER.pdf · uploaded 29 Oct 2022Source
  • 1 Building Plan Approval / NA Order for plotted developmentTYPE F G H I.pdf · uploaded 29 Oct 2022Source
  • 2 Building Plan Approval / NA Order for plotted developmentTYPE A B C D E.pdf · uploaded 29 Oct 2022Source
  • 1 Commencement Certificates / NA Order for plotted developmentNA ORDER A B TYPE.pdf · uploaded 29 Oct 2022Source
  • 2 Commencement Certificates / NA Order for plotted developmentNA ORDER C D TYPE.pdf · uploaded 29 Oct 2022Source
  • 3 Commencement Certificates / NA Order for plotted developmentNA ORDER TYPE E G.pdf · uploaded 29 Oct 2022Source
  • 4 Commencement Certificates / NA Order for plotted developmentF TYPE STRUCTURE NEW.pdf · uploaded 29 Oct 2022Source
  • 5 Commencement Certificates / NA Order for plotted developmentNA ORDER H I TYPE.pdf · uploaded 29 Oct 2022Source
  • 6 Commencement Certificates / NA Order for plotted developmentNA ORDER J K TYPE.pdf · uploaded 29 Oct 2022Source
  • 7 Commencement Certificates / NA Order for plotted developmentR G NA ORDER.pdf · uploaded 29 Oct 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECVT CERTIFICATE NAKSHATRA-rotated.pdf · uploaded 8 Nov 2022Source
  • 1 Copy of the legal title reportFORMAT A.pdf · uploaded 20 Nov 2022Source
  • 1 Declaration in FORM BSelf Declaration sandeep Sir_compressed.pdf · uploaded 20 Nov 2022Source
  • 1 Deviation Report with respect to Allotment letterno deviation.pdf · uploaded 1 Dec 2022Source
  • 1 Deviation Report with respect to model copy of Agreementno deviation.pdf · uploaded 1 Dec 2022Source
  • 1 Other – LegalF TYPE STRUCTURE NEW.pdf · uploaded 8 Dec 2022Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsDirector Disclosure (1).pdf · uploaded 9 Mar 2023Source
  • 1 CERSAI detailsSelf Declaration.pdf · uploaded 15 Jun 2023Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 NAKSHATRA.pdf · uploaded 15 Jun 2023Source
  • 2 a Details of encumbrances concerned to Financelegal declaration.pdf · uploaded 6 Jul 2023Source
  • 2 b Details of encumbrances concerned to Legallegal declaration.pdf · uploaded 6 Jul 2023Source
  • 1 Proforma of Agreement for saleNakshatra Agreement Draft copy.pdf · uploaded 24 Jul 2023Source
  • 1 Proforma of Allotment letterAnnexure 1Model.pdf · uploaded 24 Jul 2023Source
  • 2 Other – Legal7 12 extract of land.pdf · uploaded 24 Jul 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameBANK ACCOUNT DECLARATION.pdf · uploaded 4 Aug 2023Source
  • 3 Building Plan Approval / NA Order for plotted developmentA TYPE 22082023.pdf · uploaded 28 Aug 2023Source
  • 4 Building Plan Approval / NA Order for plotted developmentC TYPE 22082023.pdf · uploaded 28 Aug 2023Source
  • 5 Building Plan Approval / NA Order for plotted developmentD TYPE 22082023.pdf · uploaded 28 Aug 2023Source
  • 6 Building Plan Approval / NA Order for plotted developmentE TYPE 22082023.pdf · uploaded 28 Aug 2023Source
  • 7 Building Plan Approval / NA Order for plotted developmentF TYPE 22082023.pdf · uploaded 28 Aug 2023Source
  • 8 Building Plan Approval / NA Order for plotted developmentG TYPE 22082023.pdf · uploaded 28 Aug 2023Source
  • 9 Building Plan Approval / NA Order for plotted developmentH TYPE 22082023.pdf · uploaded 28 Aug 2023Source
  • 10 Building Plan Approval / NA Order for plotted developmentI TYPE 22082023.pdf · uploaded 28 Aug 2023Source
  • 11 Building Plan Approval / NA Order for plotted developmentJ TYPE 22082023.pdf · uploaded 28 Aug 2023Source
  • 12 Building Plan Approval / NA Order for plotted developmentK TYPE 22082023.pdf · uploaded 28 Aug 2023Source
  • 2 Copy of Layout Approval (in case of layout)NAKSHTRA LAYOUT 10092023.pdf · uploaded 12 Sep 2023Source
  • 13 Building Plan Approval / NA Order for plotted developmentB TYPE 22082023.pdf · uploaded 12 Sep 2023Source
  • 1 Declaration about Commencement CertificateRERA DOC FORM D.pdf · uploaded 12 Sep 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERT NAKSHATRA 2023 (1).pdf · uploaded 6 Feb 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)NAKSHATRA ENGINEER CERTIFICATE DEC 2023.pdf · uploaded 6 Feb 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate nakshatra.pdf · uploaded 6 Feb 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Nakshatra Form 2 Egineer's certificate on cost incurred on project(form 3)_compressed.pdf · uploaded 11 May 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Nakshatra Form 3.pdf · uploaded 11 May 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 29 Jul 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)From 2_compressed.pdf · uploaded 29 Jul 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)From 3.pdf · uploaded 29 Jul 2024Source
  • 1 Home Buyer /Allottee Grievance Redressal CellGirveance cell draft-nakshatra.pdf · uploaded 29 Jul 2024Source
  • 1 Disclosure of sold/ booked inventorydisclosure of sold inventory-Nakshatra(Q1).pdf · uploaded 6 Aug 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)From-2_compressed.pdf · uploaded 28 Oct 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)From-1.pdf · uploaded 28 Oct 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Nakshtra Form 3 CA certificate.pdf · uploaded 28 Oct 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)From-2_compressed.pdf · uploaded 28 Oct 2024Source
  • 3 Disclosure of sold/ booked inventorydisclosure of book inventory.pdf · uploaded 28 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)architect certificate-Q3-Indradhanu.pdf · uploaded 21 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA certificate Indradhanu Form 3-Dec 24.pdf · uploaded 21 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Indradhanu 31-12-24 rera.pdf · uploaded 21 Jan 2025Source
  • 1 Disclosure of sold/ booked inventorydisclosure o sold inventory-Q3-Indradhanu.pdf · uploaded 21 Jan 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate-Naskhatra-Q3.pdf · uploaded 26 Jan 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA certificate-Nakshtra-Form 3 -Dec 24.pdf · uploaded 26 Jan 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate-Q3-Nakshatra_compressed.pdf · uploaded 26 Jan 2025Source
  • 2 Disclosure of sold/ booked inventorySOLD and UNSOLD INVENTORY.pdf · uploaded 26 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate-Nakshatra-Q4.pdf · uploaded 25 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Self delecration as per order.pdf · uploaded 25 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Nakshatra Engineer Certificate March 25.pdf · uploaded 25 Apr 2025Source
  • 1 Disclosure of sold/ booked inventorydisclosure of unsold inventory-Q4.pdf · uploaded 25 Apr 2025Source
  • Form 1Form 1.pdf · uploaded 6 Oct 2025Source
  • Form 2Form 2.pdf · uploaded 6 Oct 2025Source
  • Form 3Form 3.pdf · uploaded 6 Oct 2025Source
  • Disclosure of Sold and Booked InventorySold and Unsold Inventory.pdf · uploaded 6 Oct 2025Source
  • Form 1Form 1.pdf · uploaded 29 Oct 2025Source
  • Form 2Form 2.pdf · uploaded 29 Oct 2025Source
  • Form 3Form 3.pdf · uploaded 29 Oct 2025Source
  • Disclosure of Sold and Booked InventorySold inventory_merged.pdf · uploaded 29 Oct 2025Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 2 Nov 2025Source
  • Withdrawal Update Form 2Form 2 Nakshatra.pdf · uploaded 2 Nov 2025Source
  • Withdrawal Update Form 3Nakshtra-CA certificate-Form 3 New (1).pdf · uploaded 2 Nov 2025Source
  • Withdrawal Update Form 1Architect certificateDec25.pdf · uploaded 11 Feb 2026Source
  • Withdrawal Update Form 2Engineer certificateDec25.pdf · uploaded 11 Feb 2026Source
  • Withdrawal Update Form 3CA certificate Nakshtra Form 3 New Dec25.pdf · uploaded 11 Feb 2026Source
  • Withdrawal Update Form 1Form 1 March Nakshatra.pdf · uploaded 15 May 2026Source
  • Withdrawal Update Form 2Form 2 updated_compressed.pdf · uploaded 15 May 2026Source
  • Withdrawal Update Form 3Form 3 (5).pdf · uploaded 15 May 2026Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 13 Aug 2026Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 13 Aug 2026Source
  • Withdrawal Update Form 3Form 3.pdf · uploaded 13 Aug 2026Source

Technical

  • DocumentTYPE F G H I.pdf · uploaded 29 Oct 2022Source
  • DocumentNA ORDER.pdf · uploaded 29 Oct 2022Source
  • DocumentTYPE A B C D E.pdf · uploaded 29 Oct 2022Source
  • DocumentA TYPE 22082023.pdf · uploaded 28 Aug 2023Source
  • DocumentC TYPE 22082023.pdf · uploaded 28 Aug 2023Source
  • DocumentD TYPE 22082023.pdf · uploaded 28 Aug 2023Source
  • DocumentE TYPE 22082023.pdf · uploaded 28 Aug 2023Source
  • DocumentF TYPE 22082023.pdf · uploaded 28 Aug 2023Source
  • DocumentG TYPE 22082023.pdf · uploaded 28 Aug 2023Source
  • DocumentH TYPE 22082023.pdf · uploaded 28 Aug 2023Source
  • DocumentI TYPE 22082023.pdf · uploaded 28 Aug 2023Source
  • DocumentJ TYPE 22082023.pdf · uploaded 28 Aug 2023Source
  • DocumentK TYPE 22082023.pdf · uploaded 28 Aug 2023Source
  • DocumentNAKSHTRA LAYOUT 10092023.pdf · uploaded 12 Sep 2023Source
  • DocumentB TYPE 22082023.pdf · uploaded 12 Sep 2023Source

Technical (Architect)

  • DocumentFrom-2_compressed.pdf · uploaded 28 Oct 2024Source
  • DocumentFrom-1.pdf · uploaded 28 Oct 2024Source
  • Documentarchitect certificate-Q3-Indradhanu.pdf · uploaded 21 Jan 2025Source
  • DocumentArchitect Certificate-Naskhatra-Q3.pdf · uploaded 26 Jan 2025Source
  • DocumentArchitect Certificate-Nakshatra-Q4.pdf · uploaded 25 Apr 2025Source
  • DocumentForm 1.pdf · uploaded 29 Jul 2026Source

Technical (Engineer)

  • DocumentFrom-2_compressed.pdf · uploaded 28 Oct 2024Source
  • DocumentIndradhanu 31-12-24 rera.pdf · uploaded 21 Jan 2025Source
  • DocumentEngineer Certificate-Q3-Nakshatra_compressed.pdf · uploaded 26 Jan 2025Source
  • DocumentNakshatra Engineer Certificate March 25.pdf · uploaded 25 Apr 2025Source
  • DocumentForm 2.pdf · uploaded 13 Aug 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Shiwnari, Dapoli taluka

Survey, CTS, gat or plot numbers

Gut No 299Gut No 337

Boundaries

North
Gut No 341
South
Gut No 300
East
Gut No 338
West
Gut No 297

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectJoshi Saigaonkar Associates—
Chartered accountantSane Garg & Associates LLP—
EngineerGNR Consulting Engineers—

Source: MahaRERA project page. Contact details are not shown.