Wise City, South Block Phase I, Plot RZ8 Building 4 Wing F4
Certificate SignedWardoli, Raigarh 410206 |Promoter: Wadhwa Construction and Infrastructure Private Limited
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Buildings
- 1
- Unit types
- 1BHK, 2BHK205 units in all
- Address
- Survey No 1196 & 11917, 36 Mtr DP Road, Wadhwa Wise CityPIN 410206
- Designated bank account
- 85
- Developed in phases
- No
Location
Coordinates as published by MahaRERA
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion promised for 30 Dec 2026
- Registered
- 2 May 2018
- Promised
- 30 Dec 2026
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52000016274 | 2 May 2018 | 30 Dec 2026 | 30 Dec 2026 | Wadhwa Construction and Infrastructure Private Limited | Project page |
1 building
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Wise City, South Block Phase I, Plot RZ8 Building 4 Wing F4 | 27 | 205 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
168 of 205 units booked (82%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1BHK | 44.59 sq m · 480 sq ft | 4 | 0 |
| 2BHK | 45.85 sq m · 494 sq ft | 84 | 73 |
| 2BHK | 48.87 sq m · 526 sq ft | 16 | 16 |
| 2BHK | 58.32 sq m · 628 sq ft | 101 | 79 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
1 document held by Deedo, 122 filings listed on MahaRERA's project page
Finance
- PAN CardPAN WCIPL.pdf · uploaded 17 Apr 2018Source
Legal
- Legal Title report11.pdf · uploaded 17 Apr 2018Source
- Legal Title report12.pdf · uploaded 17 Apr 2018Source
- Legal Title report21.pdf · uploaded 17 Apr 2018Source
- Legal Title report22.pdf · uploaded 17 Apr 2018Source
- Legal Title report31.pdf · uploaded 17 Apr 2018Source
- Legal Title report32.pdf · uploaded 17 Apr 2018Source
Show all 123 documentsShow fewer documents
Legal
- Declaration Form BForm 8 - F4.pdf · uploaded 18 Apr 2018Source
- OtherCORRIGENDUM TO ADDITIONAL DISCLOSURE.pdf · uploaded 1 Jun 2018Source
- OtherCORRIGENDUM TO ADDITIONAL DISCLOSURE.pdf · uploaded 1 Jun 2018Source
- Legal Title reportTitleCertificate-LawPoint-29Nov2018-WithoutAnnexures.pdf · uploaded 1 Dec 2018Source
Migrated
- 1 PAN CardPAN WCIPL.pdf · uploaded 17 Apr 2018Source
- 1 Copy of the legal title report11.pdf · uploaded 17 Apr 2018Source
- 2 Copy of the legal title report12.pdf · uploaded 17 Apr 2018Source
- 3 Copy of the legal title report21.pdf · uploaded 17 Apr 2018Source
- 4 Copy of the legal title report22.pdf · uploaded 17 Apr 2018Source
- 5 Copy of the legal title report31.pdf · uploaded 17 Apr 2018Source
- 6 Copy of the legal title report32.pdf · uploaded 17 Apr 2018Source
- 1 Details of encumbrancesLtr-Encumbrances-Promoters-F4.pdf · uploaded 17 Apr 2018Source
- 1 Copy of Layout Approval (in case of layout)20180417_BUILDING F4 DOCKET.pdf · uploaded 17 Apr 2018Source
- 1 Building Plan Approval (IOD)STP Approval.pdf · uploaded 17 Apr 2018Source
- 1 Commencement Certificates / NA Order for plotted developmentITP Approval 13032018.pdf · uploaded 17 Apr 2018Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate_Building F4_31-03-18.pdf · uploaded 17 Apr 2018Source
- 1 Proforma of Allotment letterLtr-NoAgreement-F4.pdf · uploaded 17 Apr 2018Source
- 1 Declaration in FORM BForm 8 - F4.pdf · uploaded 18 Apr 2018Source
- 1 Certificates of CA (Form 3)Form 3_CA Certificate_Building F4_31-03-18_compressed.pdf · uploaded 20 Apr 2018Source
- 2 Copy of Layout Approval (in case of layout)Final Layout_F4.pdf · uploaded 23 May 2018Source
- 2 Commencement Certificates / NA Order for plotted developmentCC-11May2018-ilovepdf-compressed.pdf · uploaded 23 May 2018Source
- 1 OtherCORRIGENDUM TO ADDITIONAL DISCLOSURE.pdf · uploaded 1 Jun 2018Source
- 2 OtherCORRIGENDUM TO ADDITIONAL DISCLOSURE.pdf · uploaded 1 Jun 2018Source
- 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)F4.pdf · uploaded 6 Oct 2018Source
- 2 Certificates of CA (Form 3)S-09-2018-15Wise city-F4.pdf · uploaded 8 Oct 2018Source
- 3 Copy of Layout Approval (in case of layout)WING-F4.pdf · uploaded 21 Nov 2018Source
- 7 Copy of the legal title reportTitleCertificate-LawPoint-29Nov2018-WithoutAnnexures.pdf · uploaded 1 Dec 2018Source
- 2 Proforma of Allotment letterAgreementForSale-1Dec2018-Final-Clean.pdf · uploaded 1 Dec 2018Source
- 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineers Certificate_ Panvel Building F4-30-09-18.pdf · uploaded 8 Jan 2019Source
- 3 Certificates of CA (Form 3)Wing F4.pdf · uploaded 8 Jan 2019Source
- 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engg Certi-Panvel F4 Build.pdf · uploaded 5 Mar 2019Source
- 4 Certificates of CA (Form 3)Wing F4.pdf · uploaded 20 Mar 2019Source
- 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineers Certificate_Panvel Building F4-31-03-2019.pdf · uploaded 21 May 2019Source
- 3 Commencement Certificates / NA Order for plotted developmentAmended CC-16 Buildings-22052019_compressed.pdf · uploaded 11 Jul 2019Source
- 5 Certificates of CA (Form 3)310319-WingF4.pdf · uploaded 11 Jul 2019Source
- 2 Details of encumbrancesLtr-Encumbrances-Promoters-Common.pdf · uploaded 12 Jul 2019Source
- 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineers Certificate_Panvel building F4-30-06-2019.pdf · uploaded 11 Sep 2019Source
- 1 Annual Audit Report of Statutory CA (Form 5)Wing F4.pdf · uploaded 19 Oct 2019Source
- 6 Certificates of CA (Form 3)300619 - Wing F4_compressed.pdf · uploaded 31 Dec 2019Source
- 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineers Certificate_ Panvel Building F4-30-09-19.pdf · uploaded 27 Jan 2020Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)F4.pdf · uploaded 7 Mar 2020Source
- 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Wing F4.pdf · uploaded 7 Mar 2020Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Wing F4.pdf · uploaded 7 Mar 2020Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)F4.pdf · uploaded 7 Mar 2020Source
- 1 Details of Restarting of Construction work post lockdownPOst-Covid-WiseCity.pdf · uploaded 20 Jul 2020Source
- 9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate Wise City - Mar'20-F4.pdf · uploaded 16 Feb 2021Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)FORM 2A Dec 2020-F4.pdf · uploaded 17 Feb 2021Source
- 4 Commencement Certificates / NA Order for plotted developmentCIDCO_NAINA_Panvel_vardoli_ITP_BP-236_Amended perm_585_SAP_162_Amm1_CCLetter-13012021.pdf · uploaded 11 Mar 2021Source
- 10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM-2 Sept 2020_F4.pdf · uploaded 11 Mar 2021Source
- 1 Disclosure of sold/ booked inventoryF4.pdf · uploaded 1 Jul 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)F4.pdf · uploaded 2 Jul 2021Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)F4.pdf · uploaded 19 Jul 2021Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)F4.pdf · uploaded 19 Jul 2021Source
- 11 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Wise City F4.pdf · uploaded 20 Jul 2021Source
- 2 Disclosure of sold/ booked inventoryF4.pdf · uploaded 20 Oct 2021Source
- 12 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Wise City F4_SEP-2021.pdf · uploaded 25 Oct 2021Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)F4.pdf · uploaded 8 Nov 2021Source
- 7 Certificates of CA (Form 3)Certi_17 - Wing F4_compressed-compressed.pdf · uploaded 22 Nov 2021Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)F4.pdf · uploaded 3 Dec 2021Source
- 13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Wise City F4_DEC-2021.pdf · uploaded 14 Jan 2022Source
- 8 Certificates of CA (Form 3)Wise City - CA Certificate - F4 - Sept 20_compressed_compressed.pdf · uploaded 27 Jan 2022Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)F4.pdf · uploaded 5 Feb 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)F4.pdf · uploaded 14 Feb 2022Source
- 9 Certificates of CA (Form 3)F4.pdf · uploaded 16 Mar 2022Source
- 10 Certificates of CA (Form 3)F4.pdf · uploaded 29 Mar 2022Source
- 11 Certificates of CA (Form 3)F4.pdf · uploaded 31 Mar 2022Source
- 12 Certificates of CA (Form 3)F4.pdf · uploaded 1 Apr 2022Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)F4.pdf · uploaded 13 Apr 2022Source
- 3 Disclosure of sold/ booked inventoryF4.pdf · uploaded 16 Apr 2022Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)F4.pdf · uploaded 18 Apr 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Annexure F FORM 5 F4.pdf · uploaded 21 Apr 2022Source
- 14 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Wise City F4_March2022.pdf · uploaded 25 Apr 2022Source
- 1 Declaration about Commencement CertificateF4.pdf · uploaded 11 May 2022Source
- 13 Certificates of CA (Form 3)F4.pdf · uploaded 14 Nov 2022Source
- 1 Proforma of Agreement for saleAgreement for Sale.pdf · uploaded 22 Dec 2022Source
- 4 Copy of Layout Approval (in case of layout)Amended ITP Layout-20-05-2019.pdf · uploaded 26 Dec 2022Source
- 2 Building Plan Approval (IOD)Approved drawings_7th Sep 2022.pdf · uploaded 26 Dec 2022Source
- 5 Commencement Certificates / NA Order for plotted developmentCCLetter.pdf · uploaded 26 Dec 2022Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)F4.pdf · uploaded 4 Jan 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)F4.pdf · uploaded 5 Jan 2023Source
- 4 Disclosure of sold/ booked inventoryF4.pdf · uploaded 5 Jan 2023Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Annual Audit Report of Statutory CA (Form 5) (FY 2021-22) F4.pdf · uploaded 5 Jan 2023Source
- 15 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)F4.pdf · uploaded 6 Jan 2023Source
- 5 Copy of Layout Approval (in case of layout)2023-01-12 Wadhwa ITP Rev Master Layout.pdf · uploaded 16 Jan 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Annual Audit Report of Statutory CA (Form 5) (FY 2021-22) F4.pdf · uploaded 30 Jan 2023Source
- 14 Certificates of CA (Form 3)F4.pdf · uploaded 6 Feb 2023Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)F4.pdf · uploaded 17 Feb 2023Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)F4.pdf · uploaded 17 Feb 2023Source
- 5 Disclosure of sold/ booked inventoryF4.pdf · uploaded 17 Feb 2023Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)F4.pdf · uploaded 23 Mar 2023Source
- 16 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)F4.pdf · uploaded 23 Mar 2023Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)F4.pdf · uploaded 23 Mar 2023Source
- 6 Disclosure of sold/ booked inventoryF4.pdf · uploaded 23 Mar 2023Source
- 15 Certificates of CA (Form 3)F4.pdf · uploaded 28 Mar 2023Source
- 17 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)F4.pdf · uploaded 11 Apr 2023Source
- 16 Certificates of CA (Form 3)F4.pdf · uploaded 11 Apr 2023Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)F4.pdf · uploaded 3 May 2023Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Wing F4.pdf · uploaded 3 May 2023Source
- 7 Disclosure of sold/ booked inventoryWing F4.pdf · uploaded 3 May 2023Source
- 18 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)wing F4_001.pdf · uploaded 31 Oct 2023Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCIDCO_NAINA_Panvel_vardoli_ITP_BP-236_Amended perm_585_SAP_162_Amm4_OCC (3).pdf · uploaded 26 Dec 2023Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)Wing F4_001.pdf · uploaded 4 Jan 2024Source
- 19 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)F4.pdf · uploaded 11 Jan 2024Source
- 2 Architect’s Certificate on Completion of Project (Form 4)F4_001.pdf · uploaded 12 Jan 2024Source
- 17 Certificates of CA (Form 3)wing F4_001.pdf · uploaded 14 May 2024Source
- 8 Disclosure of sold/ booked inventoryF 4_001.pdf · uploaded 10 Jun 2024Source
Technical
- Document20180417_BUILDING F4 DOCKET.pdf · uploaded 17 Apr 2018Source
- DocumentSTP Approval.pdf · uploaded 17 Apr 2018Source
- DocumentFinal Layout_F4.pdf · uploaded 23 May 2018Source
- DocumentWING-F4.pdf · uploaded 21 Nov 2018Source
- DocumentApproved drawings_7th Sep 2022.pdf · uploaded 26 Dec 2022Source
- DocumentAmended ITP Layout-20-05-2019.pdf · uploaded 26 Dec 2022Source
- Document2023-01-12 Wadhwa ITP Rev Master Layout.pdf · uploaded 16 Jan 2023Source
Technical (Architect)
- DocumentWing F4_001.pdf · uploaded 4 Jan 2024Source
Technical (Engineer)
- DocumentF4.pdf · uploaded 11 Jan 2024Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Wardoli, Panvel taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- 18 Mtr Layout Road
- South
- Plot RZ8 Building 4 Wing F3
- East
- 18 Mtr Layout Road
- West
- Future Development
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Hiten Sethi Associates | — |
| Architect | Visionary Design Architects | — |
| Chartered accountant | Gmj & Co. | — |
| Engineer | S R Estimation | — |
| Other | Capacite infraprojects Ltd | — |
| Other | Mr Pragnesh Mehta | — |
| Registered real estate agent | 360 Realtors LLP | — |
| Registered real estate agent | CBRE South Asia Private Limited | — |
Show all 19 professionalsShow fewer professionals
| Role | Name | Registration no. |
|---|---|---|
| Registered real estate agent | Elara Marketing Services Private Limited | — |
| Registered real estate agent | FANM Property Services Pvt Ltd | — |
| Registered real estate agent | FITRR Technologies Pvt Ltd. | — |
| Registered real estate agent | HDFC Realty Limited | — |
| Registered real estate agent | ICICI Home Finance Company Limited | — |
| Registered real estate agent | Mustafa Mohammedhusain Kharawala | — |
| Registered real estate agent | Propertypistol Realty Private Limited | — |
| Registered real estate agent | Ramnarayan Phoolchandra Pathak | — |
| Registered real estate agent | Reliance Home Finance Limited | — |
| Registered real estate agent | Vaibhav Padmakar Shetye | — |
| Registered real estate agent | Vijay Associates Wadhwa | — |
Source: MahaRERA project page. Contact details are not shown.