Wise City, South Block Phase I, Plot RZ8 Building 4 Wing F3

Certificate Signed

Wardoli, Raigarh 410206 |Promoter: Wadhwa Construction and Infrastructure Private Limited

Residential / Group HousingRERAP52000016524
21 May 2018Registered with MahaRERA
30 Dec 2026Promised completion
1Building
205Units registered140 booked (68%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Buildings
1
Unit types
1BHK, 2BHK205 units in all
Address
Survey 119/6, 119/17, 36 Mtr DP Road, Wadhwa Wise CityPIN 410206
Designated bank account
85
Developed in phases
No

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 18.96528, 73.19750
Wise City, South Block Phase I, Plot RZ8 Building 4 Wing F3 is at latitude 18.96528, longitude 73.19750.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Dec 2026

Registered
21 May 2018
Promised
30 Dec 2026

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5200001652421 May 201830 Dec 202630 Dec 2026Wadhwa Construction and Infrastructure Private LimitedProject page

1 building

Buildings and wings named in the registration

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

140 of 205 units booked (68%), as the promoter reported to MahaRERA

1BHK · 4 units2BHK · 201 units
TypeCarpet areaUnitsBooked
1BHK44.59 sq m · 480 sq ft40
2BHK45.85 sq m · 494 sq ft8471
2BHK48.87 sq m · 526 sq ft1615
2BHK58.32 sq m · 628 sq ft10154

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 160 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPAN WCIPL.pdf · uploaded 28 Apr 2018Source

Legal

  • Legal Title report11.pdf · uploaded 28 Apr 2018Source
  • Legal Title report12.pdf · uploaded 28 Apr 2018Source
  • Legal Title report21.pdf · uploaded 28 Apr 2018Source
  • Legal Title report22.pdf · uploaded 28 Apr 2018Source
  • Legal Title report31.pdf · uploaded 28 Apr 2018Source
  • Legal Title report32.pdf · uploaded 28 Apr 2018Source
Show all 161 documentsShow fewer documents

Legal

  • Declaration Form BDeclaration-F3.pdf · uploaded 3 May 2018Source
  • OtherAdditionalDisclosures.pdf · uploaded 15 May 2018Source
  • Declaration Form BJDA-1-ilovepdf-compressed.pdf · uploaded 15 May 2018Source
  • Declaration Form BJDA-2-ilovepdf-compressed.pdf · uploaded 15 May 2018Source
  • Declaration Form BJDA-3-ilovepdf-compressed.pdf · uploaded 15 May 2018Source
  • OtherCORRIGENDUM TO ADDITIONAL DISCLOSURE.pdf · uploaded 1 Jun 2018Source
  • Legal Title reportTitleCertificate-LawPoint-29Nov2018-WithoutAnnexures.pdf · uploaded 1 Dec 2018Source

Migrated

  • 1 PAN CardPAN WCIPL.pdf · uploaded 28 Apr 2018Source
  • 1 Copy of the legal title report11.pdf · uploaded 28 Apr 2018Source
  • 2 Copy of the legal title report12.pdf · uploaded 28 Apr 2018Source
  • 3 Copy of the legal title report21.pdf · uploaded 28 Apr 2018Source
  • 4 Copy of the legal title report22.pdf · uploaded 28 Apr 2018Source
  • 5 Copy of the legal title report31.pdf · uploaded 28 Apr 2018Source
  • 6 Copy of the legal title report32.pdf · uploaded 28 Apr 2018Source
  • 1 Details of encumbrancesLtr-Encumbrances-Promoters-F3.pdf · uploaded 3 May 2018Source
  • 1 Declaration in FORM BDeclaration-F3.pdf · uploaded 3 May 2018Source
  • 1 Building Plan Approval (IOD)IOD-13Mar2018.pdf · uploaded 14 May 2018Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC-11May2018-ilovepdf-compressed.pdf · uploaded 14 May 2018Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Certificate-Engineer_Panvel Building F3_31-03-18.pdf · uploaded 14 May 2018Source
  • 1 Copy of Layout Approval (in case of layout)Final Layout_F3.pdf · uploaded 15 May 2018Source
  • 2 Declaration in FORM BJDA-1-ilovepdf-compressed.pdf · uploaded 15 May 2018Source
  • 3 Declaration in FORM BJDA-2-ilovepdf-compressed.pdf · uploaded 15 May 2018Source
  • 4 Declaration in FORM BJDA-3-ilovepdf-compressed.pdf · uploaded 15 May 2018Source
  • 1 Certificates of CA (Form 3)Form 3_CA Certificate_F3_31-03-18.pdf · uploaded 15 May 2018Source
  • 1 Proforma of Allotment letterLtr-NoAgreement-F3.pdf · uploaded 15 May 2018Source
  • 1 OtherAdditionalDisclosures.pdf · uploaded 15 May 2018Source
  • 2 OtherCORRIGENDUM TO ADDITIONAL DISCLOSURE.pdf · uploaded 1 Jun 2018Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)F3.pdf · uploaded 6 Oct 2018Source
  • 2 Certificates of CA (Form 3)S-09-2018-14Wise city-F3.pdf · uploaded 8 Oct 2018Source
  • 2 Copy of Layout Approval (in case of layout)WING-F3.pdf · uploaded 21 Nov 2018Source
  • 7 Copy of the legal title reportTitleCertificate-LawPoint-29Nov2018-WithoutAnnexures.pdf · uploaded 1 Dec 2018Source
  • 2 Proforma of Allotment letterAgreementForSale-1Dec2018-Final-Clean.pdf · uploaded 1 Dec 2018Source
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineers Certificate_ Panvel Building F3-30-09-18.pdf · uploaded 8 Jan 2019Source
  • 3 Certificates of CA (Form 3)Wing F3.pdf · uploaded 8 Jan 2019Source
  • 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engg Certi-Panvel F3 Build.pdf · uploaded 5 Mar 2019Source
  • 4 Certificates of CA (Form 3)Wing F3.pdf · uploaded 20 Mar 2019Source
  • 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineers Certificate_Panvel Building F3-31-03-2019.pdf · uploaded 21 May 2019Source
  • 2 Commencement Certificates / NA Order for plotted developmentAmended CC-16 Buildings-22052019_compressed.pdf · uploaded 11 Jul 2019Source
  • 5 Certificates of CA (Form 3)310319-WingF3.pdf · uploaded 11 Jul 2019Source
  • 2 Details of encumbrancesLtr-Encumbrances-Promoters-Common.pdf · uploaded 12 Jul 2019Source
  • 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineers Certificate_ Panvel Build F3-30-06-19.pdf · uploaded 11 Sep 2019Source
  • 1 Annual Audit Report of Statutory CA (Form 5)Wing F3.pdf · uploaded 19 Oct 2019Source
  • 6 Certificates of CA (Form 3)300619 - Wing F3_compressed.pdf · uploaded 31 Dec 2019Source
  • 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineers Certificate_ Panvel Building F3-30-09-19.pdf · uploaded 27 Jan 2020Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)F3.pdf · uploaded 7 Mar 2020Source
  • 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Wing F3.pdf · uploaded 7 Mar 2020Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Wing F3.pdf · uploaded 7 Mar 2020Source
  • 1 Details of Restarting of Construction work post lockdownPOst-Covid-WiseCity.pdf · uploaded 20 Jul 2020Source
  • 9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate Wise City - Mar'20-F3.pdf · uploaded 16 Feb 2021Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)FORM 2A Dec 2020-F3.pdf · uploaded 17 Feb 2021Source
  • 3 Commencement Certificates / NA Order for plotted developmentCIDCO_NAINA_Panvel_vardoli_ITP_BP-236_Amended perm_585_SAP_162_Amm1_CCLetter-13012021.pdf · uploaded 11 Mar 2021Source
  • 10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM-2 Sept 2020_F3.pdf · uploaded 11 Mar 2021Source
  • 1 Disclosure of sold/ booked inventoryF3.pdf · uploaded 1 Jul 2021Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)F3.pdf · uploaded 2 Jul 2021Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)F3.pdf · uploaded 19 Jul 2021Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)F3.pdf · uploaded 19 Jul 2021Source
  • 11 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Wise City F3.pdf · uploaded 20 Jul 2021Source
  • 2 Disclosure of sold/ booked inventoryF3.pdf · uploaded 20 Oct 2021Source
  • 12 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Wise City F3_SEP-2021.pdf · uploaded 25 Oct 2021Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)F3.pdf · uploaded 8 Nov 2021Source
  • 7 Certificates of CA (Form 3)Certi_16 - Wing F3_compressed-compressed.pdf · uploaded 22 Nov 2021Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)F3.pdf · uploaded 3 Dec 2021Source
  • 13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Wise City F3_DEC-2021.pdf · uploaded 14 Jan 2022Source
  • 8 Certificates of CA (Form 3)Wise City - CA Certificate - F3 - Sept 20_compressed_compressed.pdf · uploaded 27 Jan 2022Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)F3.pdf · uploaded 5 Feb 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)F3.pdf · uploaded 14 Feb 2022Source
  • 9 Certificates of CA (Form 3)F3.pdf · uploaded 16 Mar 2022Source
  • 10 Certificates of CA (Form 3)F3.pdf · uploaded 29 Mar 2022Source
  • 11 Certificates of CA (Form 3)F3.pdf · uploaded 31 Mar 2022Source
  • 12 Certificates of CA (Form 3)F3.pdf · uploaded 1 Apr 2022Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)F3.pdf · uploaded 13 Apr 2022Source
  • 3 Disclosure of sold/ booked inventoryF3.pdf · uploaded 16 Apr 2022Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)F3.pdf · uploaded 18 Apr 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Annexure F FORM 5 F3.pdf · uploaded 21 Apr 2022Source
  • 14 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Wise City F3_March2022.pdf · uploaded 25 Apr 2022Source
  • 1 Declaration about Commencement CertificateF3.pdf · uploaded 11 May 2022Source
  • 13 Certificates of CA (Form 3)F3.pdf · uploaded 14 Nov 2022Source
  • 1 Proforma of Agreement for saleAgreement for Sale.pdf · uploaded 22 Dec 2022Source
  • 3 Copy of Layout Approval (in case of layout)Amended ITP Layout-20-05-2019.pdf · uploaded 26 Dec 2022Source
  • 2 Building Plan Approval (IOD)Approved drawings_7th Sep 2022.pdf · uploaded 26 Dec 2022Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)F3.pdf · uploaded 4 Jan 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)F3.pdf · uploaded 5 Jan 2023Source
  • 4 Disclosure of sold/ booked inventoryF3.pdf · uploaded 5 Jan 2023Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Annual Audit Report of Statutory CA (Form 5) (FY 2021-22) F3.pdf · uploaded 5 Jan 2023Source
  • 15 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)F3.pdf · uploaded 6 Jan 2023Source
  • 4 Copy of Layout Approval (in case of layout)2023-01-12 Wadhwa ITP Rev Master Layout.pdf · uploaded 16 Jan 2023Source
  • 4 Commencement Certificates / NA Order for plotted development2022-02-01 Amended Commencement Certificate for C2 and F3 2 Towers.pdf · uploaded 16 Jan 2023Source
  • 5 Commencement Certificates / NA Order for plotted development2022-09-07 Amended CC Letter C2 F3 E3.pdf · uploaded 16 Jan 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Annual Audit Report of Statutory CA (Form 5) (FY 2021-22) F3.pdf · uploaded 30 Jan 2023Source
  • 14 Certificates of CA (Form 3)F3.pdf · uploaded 6 Feb 2023Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)F3.pdf · uploaded 17 Feb 2023Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)F3.pdf · uploaded 17 Feb 2023Source
  • 5 Disclosure of sold/ booked inventoryF3.pdf · uploaded 17 Feb 2023Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)F3.pdf · uploaded 23 Mar 2023Source
  • 16 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)F3.pdf · uploaded 23 Mar 2023Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)F3.pdf · uploaded 23 Mar 2023Source
  • 6 Disclosure of sold/ booked inventoryF3.pdf · uploaded 23 Mar 2023Source
  • 15 Certificates of CA (Form 3)F3.pdf · uploaded 28 Mar 2023Source
  • 17 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)F3.pdf · uploaded 11 Apr 2023Source
  • 16 Certificates of CA (Form 3)F3.pdf · uploaded 11 Apr 2023Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)F3.pdf · uploaded 3 May 2023Source
  • 4 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Wing F3.pdf · uploaded 3 May 2023Source
  • 7 Disclosure of sold/ booked inventoryWing F3.pdf · uploaded 3 May 2023Source
  • 17 Certificates of CA (Form 3)wing F3 _001.pdf · uploaded 6 Oct 2023Source
  • 18 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)wing F3_001.pdf · uploaded 31 Oct 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52000016524 - F3.pdf · uploaded 11 Dec 2023Source
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)Wing F3_001.pdf · uploaded 4 Jan 2024Source
  • 19 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)F3.pdf · uploaded 11 Jan 2024Source
  • 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)Wing F 3_001.pdf · uploaded 15 Apr 2024Source
  • 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)wing F3_001.pdf · uploaded 9 May 2024Source
  • 18 Certificates of CA (Form 3)wing F3_001.pdf · uploaded 14 May 2024Source
  • 8 Disclosure of sold/ booked inventoryF 3_001.pdf · uploaded 10 Jun 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Wing F3_001.pdf · uploaded 11 Jun 2024Source
  • 19 Certificates of CA (Form 3)F 3_001.pdf · uploaded 11 Jul 2024Source
  • 20 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)F 3_001.pdf · uploaded 12 Jul 2024Source
  • 9 Disclosure of sold/ booked inventoryF 3_001.pdf · uploaded 24 Jul 2024Source
  • 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)F3.pdf · uploaded 2 Aug 2024Source
  • 10 Disclosure of sold/ booked inventorywing F3.pdf · uploaded 2 Aug 2024Source
  • 1 Certificates of CA (Form 3)FORM 3 MAR-24 F3.pdf · uploaded 10 Oct 2024Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)F3 Form 2 March 24.pdf · uploaded 14 Oct 2024Source
  • 2 Certificates of CA (Form 3)FORM 3 (New Format) - F3-Final.pdf · uploaded 6 Nov 2024Source
  • 3 Certificates of CA (Form 3)FORM 3 (New Format) - F3-Final.pdf · uploaded 6 Nov 2024Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)F3 FORM 2 JUN 24.pdf · uploaded 6 Nov 2024Source
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)F3 FORM 2 SEP 24.pdf · uploaded 6 Nov 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)wing F3.pdf · uploaded 7 Nov 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 - F3 FY 2023-24.pdf · uploaded 7 Nov 2024Source
  • 2 Disclosure of sold/ booked inventorywing F 3.pdf · uploaded 8 Nov 2024Source
  • 3 Disclosure of sold/ booked inventorywing F 3.pdf · uploaded 12 Nov 2024Source
  • 1 Disclosure of sold/ booked inventoryF3.pdf · uploaded 18 Feb 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)F3_page-0001.pdf · uploaded 20 Feb 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)F3_page-0001.pdf · uploaded 20 Feb 2025Source
  • 1 Certificates of CA (Form 3)FORM 3 (Dec-24) - F3-Final.pdf · uploaded 11 Mar 2025Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)F3 FORM 2 DEC 24.pdf · uploaded 15 Mar 2025Source
  • 1 Certificates of CA (Form 3)FORM 3 (Dec-24) - F3-Final updated.pdf · uploaded 21 Mar 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)F3 FORM 1 MAR 25.pdf · uploaded 11 Jun 2025Source
  • 1 Disclosure of sold/ booked inventoryF3.pdf · uploaded 11 Jun 2025Source
  • 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentA3,F3,D4 OC.pdf · uploaded 13 Jun 2025Source

Technical

  • DocumentIOD-13Mar2018.pdf · uploaded 14 May 2018Source
  • DocumentFinal Layout_F3.pdf · uploaded 15 May 2018Source
  • DocumentWING-F3.pdf · uploaded 21 Nov 2018Source
  • DocumentApproved drawings_7th Sep 2022.pdf · uploaded 26 Dec 2022Source
  • DocumentAmended ITP Layout-20-05-2019.pdf · uploaded 26 Dec 2022Source
  • Document2023-01-12 Wadhwa ITP Rev Master Layout.pdf · uploaded 16 Jan 2023Source

Technical (Architect)

  • DocumentF3.pdf · uploaded 2 Aug 2024Source
  • Documentwing F3.pdf · uploaded 7 Nov 2024Source
  • DocumentF3_page-0001.pdf · uploaded 20 Feb 2025Source
  • DocumentF3_page-0001.pdf · uploaded 20 Feb 2025Source
  • DocumentF3 FORM 1 MAR 25.pdf · uploaded 11 Jun 2025Source

Technical (Engineer)

  • DocumentF 3_001.pdf · uploaded 12 Jul 2024Source
  • DocumentF3 Form 2 March 24.pdf · uploaded 14 Oct 2024Source
  • DocumentF3 FORM 2 JUN 24.pdf · uploaded 6 Nov 2024Source
  • DocumentF3 FORM 2 SEP 24.pdf · uploaded 6 Nov 2024Source
  • DocumentF3 FORM 2 DEC 24.pdf · uploaded 15 Mar 2025Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Wardoli, Panvel taluka

Survey, CTS, gat or plot numbers

119/17Survey 119/6

Boundaries

North
18 Mtr Layout Road
South
Future Development
East
18 Mtr Layout Road
West
Layout Boundary

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectHiten Sethi Associates—
ArchitectVisionary Design Architects—
Chartered accountantGmj & Co.—
EngineerS R Estimation—
OtherCapacite infraprojects Ltd—
OtherMr Pragnesh Mehta—
Registered real estate agent360 Realtors LLP—
Registered real estate agentCBRE South Asia Private Limited—
Show all 18 professionalsShow fewer professionals
RoleNameRegistration no.
Registered real estate agentElara Marketing Services Private Limited—
Registered real estate agentFANM Property Services Pvt Ltd—
Registered real estate agentFITRR Technologies Pvt Ltd.—
Registered real estate agentHDFC Realty Limited—
Registered real estate agentICICI Home Finance Company Limited—
Registered real estate agentMustafa Mohammedhusain Kharawala—
Registered real estate agentPropertypistol Realty Private Limited—
Registered real estate agentRamnarayan Phoolchandra Pathak—
Registered real estate agentReliance Home Finance Limited—
Registered real estate agentVijay Associates Wadhwa—

Source: MahaRERA project page. Contact details are not shown.