wise city, south Block, Phase I, Plot RZ8 Building 1 wing A3
Certificate SignedWardoli, Raigarh 410206 |Promoter: Wadhwa Construction and Infrastructure Private Limited
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Buildings
- 1
- Unit types
- 1BHK, 2BHK253 units in all
- Address
- 1286, 1288, 36 M wide DP road, Wadhwa Wise CityPIN 410206
- Designated bank account
- 85
- Developed in phases
- No
Location
Coordinates as published by MahaRERA
Latest registered deals
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion promised for 30 Dec 2026
- Registered
- 31 May 2019
- Promised
- 30 Dec 2026
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52000021082 | 31 May 2019 | 30 Dec 2026 | 30 Dec 2026 | Wadhwa Construction and Infrastructure Private Limited | Project page |
1 building
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Wisecity, South Block , Phase-1 , Plot RZ-9, Building-1, Wing A3 | 26 | 253 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
120 of 253 units booked (47%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1BHK | 36.15 sq m · 389 sq ft | 93 | 31 |
| 1BHK | 36.25 sq m · 390 sq ft | 52 | 17 |
| 1BHK | 36.64 sq m · 394 sq ft | 10 | 9 |
| 1BHK | 40.44 sq m · 435 sq ft | 50 | 33 |
| 2BHK | 59.41 sq m · 639 sq ft | 42 | 25 |
| 2BHK | 59.94 sq m · 645 sq ft | 6 | 5 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
1 document held by Deedo, 148 filings listed on MahaRERA's project page
Finance
- PAN CardPancard.pdf · uploaded 3 May 2019Source
Legal
- Othercorrigendum.pdf · uploaded 3 May 2019Source
- Otheradditional disclouser.pdf · uploaded 3 May 2019Source
- Legal Title reportlegal title report.pdf · uploaded 3 May 2019Source
- Declaration Form Bdecleration form-b1.pdf · uploaded 3 May 2019Source
- Declaration Form Bdecleration of form B2.pdf · uploaded 3 May 2019Source
- Declaration Form Bdeclearation of form B3.pdf · uploaded 3 May 2019Source
Show all 149 documentsShow fewer documents
Legal
- Declaration Form BDecleration of Form B4.pdf · uploaded 3 May 2019Source
Migrated
- 1 PAN CardPancard.pdf · uploaded 3 May 2019Source
- 1 Copy of the legal title reportlegal title report.pdf · uploaded 3 May 2019Source
- 1 Details of encumbrancesencubrance.pdf · uploaded 3 May 2019Source
- 1 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 3 May 2019Source
- 1 Declaration in FORM Bdecleration form-b1.pdf · uploaded 3 May 2019Source
- 2 Declaration in FORM Bdecleration of form B2.pdf · uploaded 3 May 2019Source
- 3 Declaration in FORM Bdeclearation of form B3.pdf · uploaded 3 May 2019Source
- 4 Declaration in FORM BDecleration of Form B4.pdf · uploaded 3 May 2019Source
- 1 Certificates of CA (Form 3)CA Wing A3.pdf · uploaded 3 May 2019Source
- 1 Proforma of Allotment letterpreforma of allotment for sale.pdf · uploaded 3 May 2019Source
- 2 Proforma of Allotment letteraggrement for sale.pdf · uploaded 3 May 2019Source
- 1 Othercorrigendum.pdf · uploaded 3 May 2019Source
- 2 Otheradditional disclouser.pdf · uploaded 3 May 2019Source
- 1 Copy of Layout Approval (in case of layout)Copy of layout-A3.pdf · uploaded 28 May 2019Source
- 2 Copy of Layout Approval (in case of layout)Copy of layout-A3-2.pdf · uploaded 28 May 2019Source
- 1 Building Plan Approval (IOD)IOD-Wing-A-3.pdf · uploaded 28 May 2019Source
- 2 Commencement Certificates / NA Order for plotted developmentAmended CC-16 Buildings-22052019_compressed.pdf · uploaded 11 Jul 2019Source
- 2 Details of encumbrancesLtr-Encumbrances-Promoters-Common.pdf · uploaded 12 Jul 2019Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate_Panvel building A3-30-06-2019-11-09-2019.pdf · uploaded 11 Sep 2019Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate_ Panvel Building A3-30-09-19.pdf · uploaded 27 Jan 2020Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)A3.pdf · uploaded 7 Mar 2020Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Wing A3.pdf · uploaded 7 Mar 2020Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)A3.pdf · uploaded 7 Mar 2020Source
- 1 Details of Restarting of Construction work post lockdownPOst-Covid-WiseCity.pdf · uploaded 20 Jul 2020Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate Wise City - Mar'20-A3.pdf · uploaded 16 Feb 2021Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)FORM 2A Dec 2020-A3.pdf · uploaded 17 Feb 2021Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM-2 Sept 2020_A3.pdf · uploaded 10 Mar 2021Source
- 3 Commencement Certificates / NA Order for plotted developmentCIDCO_NAINA_Panvel_vardoli_ITP_BP-236_Amended perm_585_SAP_162_Amm1_CCLetter-13012021.pdf · uploaded 11 Mar 2021Source
- 1 Disclosure of sold/ booked inventoryA3.pdf · uploaded 1 Jul 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)A3.pdf · uploaded 2 Jul 2021Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)A3.pdf · uploaded 19 Jul 2021Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)A3.pdf · uploaded 19 Jul 2021Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Wise City A3.pdf · uploaded 20 Jul 2021Source
- 2 Disclosure of sold/ booked inventoryA3.pdf · uploaded 19 Oct 2021Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Wise City A3_SEP-2021.pdf · uploaded 25 Oct 2021Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)A3.pdf · uploaded 8 Nov 2021Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)A3.pdf · uploaded 3 Dec 2021Source
- 2 Certificates of CA (Form 3)Certi - 01 Wing A3_compressed.pdf · uploaded 3 Dec 2021Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Wise City A3_DEC-2021.pdf · uploaded 14 Jan 2022Source
- 3 Certificates of CA (Form 3)Wise City - CA Certificate - A3 - March 20_compressed.pdf · uploaded 28 Jan 2022Source
- 4 Certificates of CA (Form 3)Wise City - CA Certificate - A3 - Sept 20_compressed.pdf · uploaded 28 Jan 2022Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)A3.pdf · uploaded 5 Feb 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)A3.pdf · uploaded 14 Feb 2022Source
- 5 Certificates of CA (Form 3)A3 (1).pdf · uploaded 16 Mar 2022Source
- 6 Certificates of CA (Form 3)A3 (1).pdf · uploaded 29 Mar 2022Source
- 7 Certificates of CA (Form 3)A3 (1).pdf · uploaded 31 Mar 2022Source
- 8 Certificates of CA (Form 3)A3 (1).pdf · uploaded 1 Apr 2022Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)A3.pdf · uploaded 13 Apr 2022Source
- 3 Disclosure of sold/ booked inventoryA3.pdf · uploaded 16 Apr 2022Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)A3.pdf · uploaded 18 Apr 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Annexure F FORM 5 A3.pdf · uploaded 21 Apr 2022Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Wise City A3_March2022.pdf · uploaded 25 Apr 2022Source
- 1 Declaration about Commencement CertificateA3.pdf · uploaded 11 May 2022Source
- 9 Certificates of CA (Form 3)A3.pdf · uploaded 14 Nov 2022Source
- 1 Proforma of Agreement for saleAgreement for Sale.pdf · uploaded 22 Dec 2022Source
- 3 Copy of Layout Approval (in case of layout)Amended ITP Layout-20-05-2019.pdf · uploaded 26 Dec 2022Source
- 2 Building Plan Approval (IOD)Approved drawings_7th Sep 2022.pdf · uploaded 26 Dec 2022Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)A3.pdf · uploaded 4 Jan 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)A3.pdf · uploaded 5 Jan 2023Source
- 4 Disclosure of sold/ booked inventoryA3.pdf · uploaded 5 Jan 2023Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22).pdf · uploaded 5 Jan 2023Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)A3.pdf · uploaded 6 Jan 2023Source
- 4 Copy of Layout Approval (in case of layout)2023-01-12 Wadhwa ITP Rev Master Layout.pdf · uploaded 16 Jan 2023Source
- 4 Commencement Certificates / NA Order for plotted development2022-02-01 Amended Commencement Certificate for C2 and F3 2 Towers.pdf · uploaded 16 Jan 2023Source
- 5 Commencement Certificates / NA Order for plotted development2022-09-07 Amended CC Letter C2 F3 E3.pdf · uploaded 16 Jan 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Annual Audit Report of Statutory CA (Form 5) (FY 2021-22) A3.pdf · uploaded 30 Jan 2023Source
- 10 Certificates of CA (Form 3)A3.pdf · uploaded 6 Feb 2023Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)A3.pdf · uploaded 17 Feb 2023Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)A3.pdf · uploaded 17 Feb 2023Source
- 5 Disclosure of sold/ booked inventoryA3.pdf · uploaded 17 Feb 2023Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)A3.pdf · uploaded 23 Mar 2023Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)A3.pdf · uploaded 23 Mar 2023Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)A3.pdf · uploaded 23 Mar 2023Source
- 6 Disclosure of sold/ booked inventoryA3.pdf · uploaded 23 Mar 2023Source
- 11 Certificates of CA (Form 3)A3.pdf · uploaded 28 Mar 2023Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)A3.pdf · uploaded 11 Apr 2023Source
- 12 Certificates of CA (Form 3)A3.pdf · uploaded 11 Apr 2023Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)A3.pdf · uploaded 3 May 2023Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Wing A3.pdf · uploaded 3 May 2023Source
- 7 Disclosure of sold/ booked inventoryWing A3.pdf · uploaded 3 May 2023Source
- 13 Certificates of CA (Form 3)wing A3_001.pdf · uploaded 6 Oct 2023Source
- 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)wing A3_001.pdf · uploaded 31 Oct 2023Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)Wing A3_001.pdf · uploaded 4 Jan 2024Source
- 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)A3.pdf · uploaded 11 Jan 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52000021082 - A3.pdf · uploaded 5 Feb 2024Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)wing A 3_001.pdf · uploaded 15 Apr 2024Source
- 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)wing A3_001.pdf · uploaded 9 May 2024Source
- 14 Certificates of CA (Form 3)wing A3_001.pdf · uploaded 13 May 2024Source
- 8 Disclosure of sold/ booked inventoryA 3 _001.pdf · uploaded 10 Jun 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)wing A3_001.pdf · uploaded 11 Jun 2024Source
- 15 Certificates of CA (Form 3)A 3_001.pdf · uploaded 10 Jul 2024Source
- 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)A 3_001.pdf · uploaded 12 Jul 2024Source
- 9 Disclosure of sold/ booked inventoryA 3_001.pdf · uploaded 24 Jul 2024Source
- 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)wing A3_001.pdf · uploaded 2 Aug 2024Source
- 10 Disclosure of sold/ booked inventorywing A3_001.pdf · uploaded 2 Aug 2024Source
- 1 Certificates of CA (Form 3)FORM 3 MAR-24 A3.pdf · uploaded 10 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)A3 Form 2 March 24.pdf · uploaded 14 Oct 2024Source
- 2 Certificates of CA (Form 3)FORM 3 (New Format) - A3-Final.pdf · uploaded 6 Nov 2024Source
- 3 Certificates of CA (Form 3)FORM 3 (New Format) - A3-Final.pdf · uploaded 6 Nov 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)A3 FORM 2 JUN 24.pdf · uploaded 6 Nov 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 - A3 FY 2023-24.pdf · uploaded 6 Nov 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)wing A 3.pdf · uploaded 7 Nov 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)A3 FORM 2 SEP 24.pdf · uploaded 7 Nov 2024Source
- 2 Disclosure of sold/ booked inventorywing A 3.pdf · uploaded 8 Nov 2024Source
- 3 Disclosure of sold/ booked inventoryWing A 3.pdf · uploaded 12 Nov 2024Source
- 1 Disclosure of sold/ booked inventoryA3.pdf · uploaded 18 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)A3_page-0001 (1).pdf · uploaded 20 Feb 2025Source
- 1 Certificates of CA (Form 3)FORM 3 (Dec-24) - A3-Final.pdf · uploaded 11 Mar 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)A3 FORM 2 DEC 24.pdf · uploaded 15 Mar 2025Source
- Form 1A3.pdf · uploaded 17 Sep 2025Source
- Form 2A3 FORM 2 MAR 25.pdf · uploaded 17 Sep 2025Source
- Form 3A3 MAR 25 FORM 3.pdf · uploaded 17 Sep 2025Source
- Disclosure of Sold and Booked InventoryA3.pdf · uploaded 17 Sep 2025Source
- Form 5 (FY 2020-2021)A3.pdf · uploaded 21 Nov 2025Source
- Withdrawal Update Form 1wing A3_001.pdf · uploaded 9 Jan 2026Source
- Withdrawal Update Form 2A3 FORM 2 JUN25.pdf · uploaded 9 Jan 2026Source
- Withdrawal Update Form 3FORM 3 (New Format) - A3_June-2025.pdf · uploaded 9 Jan 2026Source
- Withdrawal Update Form 1wing A3_001.pdf · uploaded 29 Apr 2026Source
- Withdrawal Update Form 1wing A3_001.pdf · uploaded 29 Apr 2026Source
- Withdrawal Update Form 1wing A3_001.pdf · uploaded 29 Apr 2026Source
- Withdrawal Update Form 2A3 FORM 2 JUN25.pdf · uploaded 29 Apr 2026Source
- Withdrawal Update Form 2A3 FORM 2 JUN25.pdf · uploaded 29 Apr 2026Source
- Withdrawal Update Form 2A3 FORM 2 JUN25.pdf · uploaded 29 Apr 2026Source
- Withdrawal Update Form 3FORM 3 (New Format) - A3_June-2025.pdf · uploaded 29 Apr 2026Source
- Withdrawal Update Form 3FORM 3 (New Format) - A3_June-2025.pdf · uploaded 29 Apr 2026Source
- Withdrawal Update Form 3FORM 3 (New Format) - A3_June-2025.pdf · uploaded 29 Apr 2026Source
Technical
- DocumentIOD-Wing-A-3.pdf · uploaded 28 May 2019Source
- DocumentCopy of layout-A3.pdf · uploaded 28 May 2019Source
- DocumentCopy of layout-A3-2.pdf · uploaded 28 May 2019Source
- DocumentApproved drawings_7th Sep 2022.pdf · uploaded 26 Dec 2022Source
- DocumentAmended ITP Layout-20-05-2019.pdf · uploaded 26 Dec 2022Source
- Document2023-01-12 Wadhwa ITP Rev Master Layout.pdf · uploaded 16 Jan 2023Source
Technical (Architect)
Technical (Engineer)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Wardoli, Panvel taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- 36 M wide DP road
- South
- layout boundary Plot RZ8 building 1 wing A2
- East
- Future development
- West
- 36 M wide DP road
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Hiten Sethi Acsociates | — |
| Architect | Visionary Design Architects | — |
| Chartered accountant | GmJ & Co | — |
| Chartered accountant | MRP & Associates | — |
| Engineer | S R Estimate | — |
| Other | Capacite Infra Project Pvt Ltd | — |
| Other | Mr Pragnesh Mehta | — |
| Registered real estate agent | Ramnarayan Phoolchandra Pathak | — |
| Registered real estate agent | Reliance Home Finance Limited | — |
Source: MahaRERA project page. Contact details are not shown.
