Nandadeep Residency

Active

Wadawali T Waredi, Raigarh 410201 |Promoter: Nandadeep Homes Pvt. Ltd.

Residential / Group HousingRERAP51700009698
22 Aug 2017Registered with MahaRERA
30 Dec 2028Promised completion
37Buildings
12MahaRERA listings and orders

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Active
Buildings
37
Land area for this project
15,600 sq m (1,67,917 sq ft)
Permissible built-up area
21,731 sq m (2,33,911 sq ft)
Sanctioned built-up area
15,491 sq m (1,66,745 sq ft)
Recreational open space
1,500 sq m (16,146 sq ft)
Planning authority
Office of District Collector and District Magistrate Raigad- Alibaug
Address
3-1B, 4-1, 4-2, 4-3, 4-4A2, 4-4B, 81-1B, Wadavali, KarjatPIN 410201
Designated bank account
Bharat Cooperative Bank Mumbai Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 18.98798, 73.32725
Nandadeep Residency is at latitude 18.98798, longitude 73.32725.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Dec 2028

Registered
22 Aug 2017
Promised
30 Dec 2028

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5170000969822 Aug 201730 Dec 2028—Nandadeep Homes Pvt. Ltd.Project page

37 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
A15—
A105—
A115—
A125—
A135—
A145—
A25—
A35—
Show all 37 buildingsShow fewer buildings
BuildingSanctioned floorsUnits
A45—
A55—
A65—
A75—
A85—
A95—
B15—
B25—
Building 02——
Building A1——
Building A2——
Building A3——
Building A4——
Building A5——
Building A6——
Building A7——
Building B1——
Building B2——
Building C1——
Building C2——
Building C3——
Building C4——
Building C5——
Building No 26—
C15—
C25—
C35—
C45—
C55—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
A1Closed/Covered00000
A1Open Space000050
A10Closed/Covered00000
A10Open Space000050
A11Closed/Covered00000
A11Open Space000050
A12Closed/Covered00000
A12Open Space000050
Show all 44 parking rowsShow fewer parking rows
BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
A13Closed/Covered00000
A13Open Space000050
A14Closed/Covered00000
A14Open Space000050
A2Closed/Covered00000
A2Open Space000050
A3Closed/Covered00000
A3Open Space000050
A4Closed/Covered00000
A4Open Space000050
A5Closed/Covered00000
A5Open Space000050
A6Closed/Covered00000
A6Open Space000050
A7Closed/Covered00000
A7Open Space000050
A8Closed/Covered00000
A8Open Space000050
A9Closed/Covered00000
A9Open Space000050
B1Closed/Covered00000
B1Open Space000060
B2Closed/Covered00000
B2Open Space000060
Building No 2Closed/Covered000013
Building No 2Open Space0000158
C1Closed/Covered00000
C1Open Space000045
C2Closed/Covered00000
C2Open Space000040
C3Closed/Covered00000
C3Open Space000045
C4Closed/Covered00000
C4Open Space000045
C5Closed/Covered00000
C5Open Space000045

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

A1

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

A10

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

A11

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Show all 23 buildings and common areasShow fewer buildings and common areas

A12

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

A13

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

A14

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

A2

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

A3

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

A4

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

A5

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

A6

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

A7

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

A8

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

A9

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B1

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure50%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B2

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure50%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Building No 2

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

C1

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

C2

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

C3

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

C4

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

C5

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises35%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.96%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsAS PER STANDARDS100%
  • Water SupplyAS PER STANDARDS100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)AS PER STANDARDS80%
  • Storm Water DrainsAS PER STANDARDS90%
  • Landscaping & Tree PlantingAS PER STANDARDS100%
  • Street LightingAS PER STANDARDS100%
Show all 18 activitiesShow fewer activities
  • Community BuildingsAS PER STANDARDS100%
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAS PER STANDARDS100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationAS PER STANDARDS85%
  • Aggregate area of recreational Open SpaceAS PER STANDARDS85%
  • Open ParkingAS PER STANDARDS90%
  • TEMPLEAS PER STANDARDS50%
  • SWIMMING POOLAS PER STANDARDS100%
  • FITNESS ROOMAS PER STANDARDS100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

166 documents held by Deedo, 168 filings listed on MahaRERA's project page

Title report

Encumbrance details (5)

Commencement certificate

Form B

Show all 334 documentsShow fewer documents

Form 1 (48)

Allotment letter

Form 5 (7)

Form 2 (48)

Other (48)

Registration certificate

Layout plan (4)

Building plan

Document library

  • Copy of the legal title reportTitle-Search Report.pdf · uploaded 28 Jul 2017View
  • Copy of Layout Approval (in case of layout)Sanctioned Layout, Karjat.PDF · uploaded 28 Jul 2017View
  • Copy of Layout Approval (in case of layout)Sanctioned Plan 1, Karjat.PDF · uploaded 28 Jul 2017View
  • Copy of Layout Approval (in case of layout)Sanctioned Plan 2, Karjat.PDF · uploaded 28 Jul 2017View
  • Details of encumbrancesBharat Bank Sanctioned Letter.pdf · uploaded 28 Jul 2017View
  • Building Plan Approval (IOD)Sanctioned Layout, Karjat.PDF · uploaded 28 Jul 2017View
  • Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 28 Jul 2017View
  • Copy of Layout Approval (in case of layout)Sanctioned Plan 5, Karjat.PDF · uploaded 28 Jul 2017View
  • Declaration in FORM BAffidavit cum declaration.pdf · uploaded 29 Jul 2017View
  • Certificates of CA (Form 5)Architect RERA Certificates.pdf · uploaded 31 Jul 2017View
  • Proforma of Allotment letterRERA AFF DOCUMENT NON SUBMISSION.pdf · uploaded 31 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Phase 1.pdf · uploaded 31 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Phase 2.pdf · uploaded 31 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Phase 3.pdf · uploaded 31 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Phase 4.pdf · uploaded 31 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Phase 5.pdf · uploaded 31 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Phase 6.pdf · uploaded 31 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Phase 7.pdf · uploaded 31 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Phase 8.pdf · uploaded 31 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Phase 9.pdf · uploaded 31 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Phase 10.pdf · uploaded 31 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Phase 11.pdf · uploaded 31 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)GS NHPL RERA Affidavit.pdf · uploaded 31 Jul 2017View
  • Details of encumbrancescertificate of Encrumbrance.pdf · uploaded 5 Sep 2017View
  • Details of encumbrancesWorking Capital Loan Closer Letter.pdf · uploaded 2 Aug 2018View
  • Details of encumbrancesWorking Capital Loan Closer Letter.pdf · uploaded 2 Aug 2018View
  • Details of encumbrancesTerm Loan Closer Letter.pdf · uploaded 2 Aug 2018View
  • Details of encumbrancesTerm Loan Closer Letter.pdf · uploaded 2 Aug 2018View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)PHASE1 BLD 02.pdf · uploaded 25 Aug 2018View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGINEER.pdf · uploaded 25 Aug 2018View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGI.pdf · uploaded 25 Aug 2018View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENG.pdf · uploaded 25 Aug 2018View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENG.pdf · uploaded 25 Aug 2018View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENG.pdf · uploaded 25 Aug 2018View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENG.pdf · uploaded 25 Aug 2018View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENG.pdf · uploaded 25 Aug 2018View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENG.pdf · uploaded 25 Aug 2018View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENG.pdf · uploaded 25 Aug 2018View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCH.pdf · uploaded 25 Aug 2018View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARC.pdf · uploaded 25 Aug 2018View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARC.pdf · uploaded 25 Aug 2018View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARC.pdf · uploaded 25 Aug 2018View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARC.pdf · uploaded 25 Aug 2018View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARC.pdf · uploaded 25 Aug 2018View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARC.pdf · uploaded 25 Aug 2018View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARC.pdf · uploaded 25 Aug 2018View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCH.pdf · uploaded 25 Aug 2018View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCH.pdf · uploaded 25 Aug 2018View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCH.pdf · uploaded 25 Aug 2018View
  • OtherNHPL1718 DIR12 Challan.pdf · uploaded 25 Aug 2018View
  • OtherNHPL1718 Master Data.pdf · uploaded 25 Aug 2018View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)BUilding A5 A6 A7.pdf · uploaded 29 Mar 2019View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Building C3 C4.pdf · uploaded 29 Mar 2019View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Building No 02.pdf · uploaded 29 Mar 2019View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Building No A1 A2.pdf · uploaded 29 Mar 2019View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Building No A3 A4.pdf · uploaded 29 Mar 2019View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Building No A8 A9.pdf · uploaded 29 Mar 2019View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Building No A10 A11.pdf · uploaded 29 Mar 2019View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Building No A12 A13 A14.pdf · uploaded 29 Mar 2019View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Building No B1 B2.pdf · uploaded 29 Mar 2019View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Building No C1 C2.pdf · uploaded 29 Mar 2019View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Building No C5.pdf · uploaded 29 Mar 2019View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Phase 1_Building 02.pdf · uploaded 29 Mar 2019View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Phase 2_Building_A1 A2.pdf · uploaded 29 Mar 2019View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Phase 3_Building_C1 C2.pdf · uploaded 29 Mar 2019View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Phase 4_Building_A3 A4.pdf · uploaded 29 Mar 2019View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Phase 8_Building_A12 A13 A14.pdf · uploaded 29 Mar 2019View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Phase 6_Building_C5.pdf · uploaded 29 Mar 2019View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Phase 5_Building_C3 C4.pdf · uploaded 29 Mar 2019View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Phase 7_Building_A5,A6 A7.pdf · uploaded 29 Mar 2019View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Phase 9_Building_A8 A9.pdf · uploaded 29 Mar 2019View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Phase 10_Building_A10 A11.pdf · uploaded 29 Mar 2019View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Phase 11_Building_B1 B2.pdf · uploaded 29 Mar 2019View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Nandadeep Residency-1.pdf · uploaded 21 Jun 2019View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Nandadeep Residency-2.pdf · uploaded 21 Jun 2019View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Nandadeep- 1.pdf · uploaded 21 Jun 2019View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Nandadeep- 2.pdf · uploaded 21 Jun 2019View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Nandadeep- 3.pdf · uploaded 21 Jun 2019View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Nandadeep- 4.pdf · uploaded 21 Jun 2019View
  • Certificates of CA (Form 5)Form 5 Nandadeep Residency.pdf · uploaded 21 Jun 2019View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Nandadeep Residency-1-4.pdf · uploaded 3 Aug 2019View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Nandadeep Residency 5-end.pdf · uploaded 3 Aug 2019View
  • Certificates of CA (Form 5)Form 5.pdf · uploaded 12 Aug 2019View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2.pdf · uploaded 12 Aug 2019View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form -2 Nandadeep Residency_compressed (1).pdf · uploaded 27 Dec 2019View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Nandadeep Residency.pdf · uploaded 28 Jan 2020View
  • Details of Restarting of Construction work post lockdownNandaadeep Google form.pdf · uploaded 29 Jun 2020View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)NANDADEEP HOMES FORM 2 JUNE 2020_compressed.pdf · uploaded 7 Oct 2020View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)NANDADEEP HOMES FORM 2 MARCH 2020_compressed.pdf · uploaded 7 Oct 2020View
  • Details of encumbrancesEncumbrance Letter for KAIJSB.pdf · uploaded 11 Feb 2021View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)NANDADEEP FORM 2 SEPT 2020_compressed.pdf · uploaded 13 May 2021View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)NANDANDEEP FORM 2 DEC 2020_compressed (1).pdf · uploaded 13 May 2021View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Nandadeep March 2021_compressed.pdf · uploaded 26 Aug 2021View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Nandadeep Residency June 2021.pdf · uploaded 24 Nov 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5 FY 19-20 Nandadeep Residency.pdf · uploaded 24 Nov 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 FY 20-21 Nandadeep Residency.pdf · uploaded 24 Nov 2021View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Nandadeep Residency as on March 2022.pdf · uploaded 1 Nov 2022View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Nandadeep Residency as on March 2022.pdf · uploaded 1 Nov 2022View
  • Building Plan Approval (IOD)Nandadeep Layout_compressed.pdf · uploaded 12 Jan 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)3 Certificates of CA (Form 5).pdf · uploaded 23 Jan 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 Certificate 499.pdf · uploaded 23 Jan 2023View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 MARCH 2018_compressed.pdf · uploaded 3 Feb 2023View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 MARCH 2021_compressed.pdf · uploaded 3 Feb 2023View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 DECEMBER 2021_compressed.pdf · uploaded 3 Feb 2023View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 MARCH 2022_compressed.pdf · uploaded 3 Feb 2023View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 JUNE 2022_compressed.pdf · uploaded 3 Feb 2023View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 SEPTEMBER 2022_compressed.pdf · uploaded 3 Feb 2023View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 DECEMBER 2022_compressed.pdf · uploaded 3 Feb 2023View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 as on December 2022.pdf · uploaded 4 May 2023View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 as on September 2022.pdf · uploaded 4 May 2023View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 as on December 2022.pdf · uploaded 4 May 2023View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2- Nandadeep Residency as on June 2022.pdf · uploaded 25 Sep 2023View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2- Nandadeep Residency as on September 2022.pdf · uploaded 25 Sep 2023View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2- Nandadeep Residency as on December 2022.pdf · uploaded 25 Sep 2023View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2- Nandadeep Residency as on March 2023.pdf · uploaded 25 Sep 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 - Nandadeep Residency as on 2022-23.pdf · uploaded 30 Sep 2023View
  • Form 21 Form 2 - Q1 June 23.pdf · uploaded 27 Feb 2026View
  • Form 12 Form 1 - June 23.pdf · uploaded 27 Feb 2026View
  • Disclosure of Sold and Booked Inventory1 Sold Booked - Q1 June 23.pdf · uploaded 27 Feb 2026View
  • Form 13 Form 1 - Sept 23.pdf · uploaded 27 Feb 2026View
  • Form 22 Form 2 - Q2 Sept 23.pdf · uploaded 27 Feb 2026View
  • Disclosure of Sold and Booked Inventory2 Sold Booked - Q2 Sept 23.pdf · uploaded 27 Feb 2026View
  • Form 14 Form 1 - Dec 23.pdf · uploaded 27 Feb 2026View
  • Form 23 Form 2 - Q3 Dec 23.pdf · uploaded 27 Feb 2026View
  • Disclosure of Sold and Booked Inventory3 Sold Booked - Q3 Dec 23.pdf · uploaded 27 Feb 2026View
  • Form 15 Form 1 - Mar 24.pdf · uploaded 27 Feb 2026View
  • Form 24 Form 2 - Q4 Mar 24.pdf · uploaded 27 Feb 2026View
  • Disclosure of Sold and Booked Inventory4 Sold Booked - Q4 Mar 24.pdf · uploaded 27 Feb 2026View
  • Form 16 Form 1 - June 24.pdf · uploaded 27 Feb 2026View
  • Form 25 Form 2 - Q1 June 24.pdf · uploaded 27 Feb 2026View
  • Disclosure of Sold and Booked Inventory5 Sold Booked - Q1 June 24.pdf · uploaded 27 Feb 2026View
  • Form 17 Form 1 - Sept 24.pdf · uploaded 27 Feb 2026View
  • Form 26 Form 2 - Q2 Sept 24.pdf · uploaded 27 Feb 2026View
  • Disclosure of Sold and Booked Inventory6 Sold Booked - Q2 Sept 24.pdf · uploaded 27 Feb 2026View
  • Form 18 Form 1 - Dec 24.pdf · uploaded 27 Feb 2026View
  • Form 27 Form 2 - Q3 Dec 24.pdf · uploaded 27 Feb 2026View
  • Disclosure of Sold and Booked Inventory7 Sold Booked - Q3 Dec 24.pdf · uploaded 27 Feb 2026View
  • Form 19 Form 1 - Mar 25.pdf · uploaded 27 Feb 2026View
  • Form 28 Form 2 - Q4 Mar 25.pdf · uploaded 27 Feb 2026View
  • Disclosure of Sold and Booked Inventory8 Sold Booked - Q4 Mar 25.pdf · uploaded 27 Feb 2026View
  • Form 110 Form 1 - June 25.pdf · uploaded 27 Feb 2026View
  • Form 29 Form 2 - Q1 June 25.pdf · uploaded 27 Feb 2026View
  • Disclosure of Sold and Booked Inventory9 Sold Booked - Q1 June 25.pdf · uploaded 27 Feb 2026View
  • Disclosure of Sold and Booked Inventory11 Sold Booked - Q3 Dec 25.pdf · uploaded 20 Mar 2026View
  • Form 1MI Architecture and Design 2.pdf · uploaded 20 Mar 2026View
  • Form 211 Form 2 - Q3 Dec 25.pdf · uploaded 20 Mar 2026View
  • Form 1Form 1 - Sept 25.pdf · uploaded 20 Mar 2026View
  • Form 210 Form 2 - Q2 Sept 25.pdf · uploaded 20 Mar 2026View
  • Disclosure of Sold and Booked Inventory10 Sold Booked - Q2 Sept 25.pdf · uploaded 20 Mar 2026View
  • Form 113 Form 1 - Mar 26.pdf · uploaded 20 Jul 2026View
  • Form 212 Form 2 - Q4 Mar 26.pdf · uploaded 20 Jul 2026View
  • Disclosure of Sold and Booked Inventory12 Sold Booked - Q4 Mar 26.pdf · uploaded 20 Jul 2026View
  • Form 114 Form 1 - June 26.pdf · uploaded 20 Jul 2026View
  • Form 213 Form 2 - Q1 June 26.pdf · uploaded 20 Jul 2026View
  • Disclosure of Sold and Booked Inventory13 Sold Booked - Q1 June 26.pdf · uploaded 20 Jul 2026View
  • Withdrawal Update Form 114 Form 1 - June 26.pdf · uploaded 30 Jul 2026View
  • Withdrawal Update Form 213 Form 2 - Q1 June 26.pdf · uploaded 30 Jul 2026View

Promoter documents

  • Legal Title reportTitle-Search Report.pdf · uploaded 28 Jul 2017View
  • Declaration Form BAffidavit cum declaration.pdf · uploaded 29 Jul 2017View

Technical documents

  • Layout ApprovalSanctioned Plan 2, Karjat.PDFView
  • Layout ApprovalSanctioned Plan 1, Karjat.PDFView
  • Layout ApprovalSanctioned Layout, Karjat.PDFView
  • Layout ApprovalSanctioned Plan 5, Karjat.PDFView
  • Building Plan ApprovalNandadeep Layout_compressed.pdfView
  • Building Plan ApprovalSanctioned Layout, Karjat.PDFView

Other legal documents

  • OtherNHPL1718 DIR12 Challan.pdfView
  • OtherNHPL1718 Master Data.pdfView

Proforma allotment letter

  • Proforma allotment letterRERA AFF DOCUMENT NON SUBMISSION.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

What MahaRERA has published about this project. A listing records what the authority published; it is not a judgment of the project.

Show all 12 listings and ordersShow fewer listings and orders

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In wadawali t waredi, Karjat taluka

Survey, CTS, gat or plot numbers

31B41424344A244B81 1B

As published on MahaRERA's project page

3-1B, 4-1, 4-2, 4-3, 4-4A2, 4-4B, 81-1B

Boundaries

North
S No 4-4a1
South
S No 56 58
East
Karjat Matheran Highway
West
Zp Road To Prop Rope-Way

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectP S Gokak—
ArchitectSunil Jagnar Architects—
Chartered accountantManish K Ramawati And Company—
Chartered accountantRutuja Narsingh & Associates—
EngineerKantilal K Patel—
EngineerMasih Yasir Nachan—
EngineerSK Consultants & Engineers—
OtherAdv N N Edate—
Show all 21 professionalsShow fewer professionals
RoleNameRegistration no.
OtherGulab Singh—
OtherHanumant Gundappa Salunkhe—
Real Estate AgentHdfc Developers Limited—
OtherKaviraj Jadhav—
OtherKaviraj Jadhav—
Real Estate AgentL4 Solutions—
OtherManind Prasad—
OtherNaresh Keshubhai Gopani—
OtherRERA Easy—
OtherSumit Mohandas Katariya—
OtherVipul Karsanbhai Nakrani—
Registered real estate agentHdfc Developers LimitedA51900000930
Registered real estate agentL4 SolutionsA52000007444

Source: MahaRERA project page. Contact details are not shown.