Sarvamangala Residency

Certificate Signed

Tupgaon, Raigarh 410203 |Promoter: Om Sai Homes Builders

Residential / Group HousingRERAP52000045645
26 May 2022Registered with MahaRERA
31 Dec 2029Promised completion
30 Apr 2030Revised completionPushed back 4 months
3Buildings
189Units registered43 booked (23%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Buildings
3
Unit types
2BHK, 1BHK189 units in all
Address
Gut No.6, Gut No. 4/4/APIN 410203
Designated bank account
21
Developed in phases
Yes

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 18.89403, 73.23855
Sarvamangala Residency is at latitude 18.89403, longitude 73.23855.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 4 months

Registered
26 May 2022
Promised
31 Dec 2029
Revised
30 Apr 2030

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5200004564526 May 202231 Dec 202930 Apr 2030Om Sai Homes BuildersProject page

3 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Building No 11342
Building No 2791
Building No 31356

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

43 of 189 units booked (23%), as the promoter reported to MahaRERA

2BHK · 42 units1BHK · 147 units
BuildingTypeCarpet areaUnitsBooked
Building No 12BHK49.78 sq m · 536 sq ft70
Building No 12BHK49.8 sq m · 536 sq ft71
Building No 12BHK51.02 sq m · 549 sq ft140
Building No 12BHK53.96 sq m · 581 sq ft140
Building No 21BHK27.38 sq m · 295 sq ft143
Building No 21BHK27.87 sq m · 300 sq ft72
Building No 21BHK29.94 sq m · 322 sq ft6331
Building No 21BHK33.75 sq m · 363 sq ft72
Show all 12 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
Building No 31BHK29.94 sq m · 322 sq ft283
Building No 31BHK30.01 sq m · 323 sq ft141
Building No 31BHK30.9 sq m · 333 sq ft70
Building No 31BHK32.77 sq m · 353 sq ft70

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

2 documents held by Deedo, 116 filings listed on MahaRERA's project page

Extension certificate

Registration certificate

Finance

  • PAN CardPAN CARD OMHB.pdf · uploaded 12 May 2022Source

Legal

  • Declaration Form BFORM B_compressed.pdf · uploaded 12 May 2022Source
  • Legal Title reportT1.pdf · uploaded 13 May 2022Source
  • Legal Title reportT2.pdf · uploaded 13 May 2022Source

Migrated

  • 1 PAN CardPAN CARD OMHB.pdf · uploaded 12 May 2022Source
  • 1 Details of encumbrancesNON-ENCUMBERANCE CERTIFICATE.pdf · uploaded 12 May 2022Source
Show all 118 documentsShow fewer documents

Migrated

  • 1 Copy of Layout Approval (in case of layout)lp 1.pdf · uploaded 12 May 2022Source
  • 2 Copy of Layout Approval (in case of layout)lp2.pdf · uploaded 12 May 2022Source
  • 1 Building Plan Approval / NA Order for plotted developmentbp3.pdf · uploaded 12 May 2022Source
  • 2 Building Plan Approval / NA Order for plotted developmentbp4.pdf · uploaded 12 May 2022Source
  • 3 Building Plan Approval / NA Order for plotted developmentbp5.pdf · uploaded 12 May 2022Source
  • 4 Building Plan Approval / NA Order for plotted developmentbp6.pdf · uploaded 12 May 2022Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate_compressed.pdf · uploaded 12 May 2022Source
  • 1 Declaration about Commencement CertificateCC DECLARATION.pdf · uploaded 12 May 2022Source
  • 1 Declaration in FORM BFORM B_compressed.pdf · uploaded 12 May 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 12 May 2022Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 12 May 2022Source
  • 1 CERSAI detailsCERSAI.pdf · uploaded 12 May 2022Source
  • 1 Proforma of Allotment letterAllotment_Letter_apartment.pdf · uploaded 12 May 2022Source
  • 1 Copy of the legal title reportT1.pdf · uploaded 13 May 2022Source
  • 2 Copy of the legal title reportT2.pdf · uploaded 13 May 2022Source
  • 2 Proforma of Allotment letter1TUPGAON AGREEMENT FOR SALE.pdf · uploaded 17 May 2022Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3_compressed.pdf · uploaded 21 May 2022Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 21 Oct 2022Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 21 Oct 2022Source
  • 1 Disclosure of sold/ booked inventorySOLD UNSOLD_compressed.pdf · uploaded 21 Oct 2022Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3_compressed.pdf · uploaded 21 Oct 2022Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 18 Feb 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 18 Feb 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3_compressed.pdf · uploaded 18 Feb 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1-SARVAMANGALA RESIDENCY_MAR 23.pdf · uploaded 20 May 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2-SARVAMANGALA RESIDENCY_MAR 23.pdf · uploaded 20 May 2023Source
  • 2 Disclosure of sold/ booked inventorySOLD UNSOLD-SARVAMANGALA RESIDENCY_DEC 22.pdf · uploaded 20 May 2023Source
  • 3 Disclosure of sold/ booked inventorySOLD UNSOLD-SARVAMANGALA RESIDENCY_MAR 23.pdf · uploaded 20 May 2023Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3-SARVAMANGALA RESIDENCY_MAR 23_compressed.pdf · uploaded 20 May 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A.pdf · uploaded 29 Jun 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A.pdf · uploaded 29 Jun 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A.pdf · uploaded 29 Jun 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A.pdf · uploaded 29 Jun 2023Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1-SARVAMANGALA RESIDENCY_JUN 23.pdf · uploaded 27 Aug 2023Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2-SARVAMANGALA RESIDENCY_JUN 23.pdf · uploaded 27 Aug 2023Source
  • 4 Disclosure of sold/ booked inventorySOLD UNSOLD-SARVAMANGALA RESIDENCY_JUN 23.pdf · uploaded 27 Aug 2023Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3-SARVAMANGALA RESIDENCY_JUN 23.pdf · uploaded 27 Aug 2023Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1-SARVAMANGALA RESIDENCY_SEP 23.pdf · uploaded 9 Nov 2023Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2-SARVAMANGALA RESIDENCY_SEP 23.pdf · uploaded 9 Nov 2023Source
  • 5 Disclosure of sold/ booked inventorySOLD UNSOLD-SARVAMANGALA RESIDENCY_SEP 23.pdf · uploaded 9 Nov 2023Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3-SARVAMANGALA RESIDENCY_SEP 23_compressed.pdf · uploaded 9 Nov 2023Source
  • 2 Details of encumbrancesENCOMBERANCE ON PROJECT.pdf · uploaded 20 Nov 2023Source
  • 2 CERSAI detailsCERSAI_Acknowledgemnt_Report_200287246236_For_Registration_Of_Security_Interest_18_11_2023_18_02_40_191.pdf · uploaded 20 Nov 2023Source
  • 3 CERSAI detailsCERSAI_Acknowledgemnt_Report_200287246813_For_Registration_Of_Security_Interest_18_11_2023_18_05_50_969.pdf · uploaded 20 Nov 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5 FY 22-23.pdf · uploaded 22 Nov 2023Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1-SARVAMANGALA RESIDENCY_DEC 23.pdf · uploaded 7 Feb 2024Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2-SARVAMANGALA RESIDENCY_DEC 23.pdf · uploaded 7 Feb 2024Source
  • 6 Disclosure of sold/ booked inventorySOLD UNSOLD-SARVAMANGALA RESIDENCY_DEC 23.pdf · uploaded 7 Feb 2024Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3-SARVAMANGALA RESIDENCY_DEC 23.pdf · uploaded 7 Feb 2024Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1-SARVAMANGALA RESIDENCY_MAR 24.pdf · uploaded 27 Apr 2024Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2-SARVAMANGALA RESIDENCY_MAR 24.pdf · uploaded 27 Apr 2024Source
  • 7 Disclosure of sold/ booked inventorySOLD UNSOLD-SARVAMANGALA RESIDENCY_MAR 24.pdf · uploaded 27 Apr 2024Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3-SARVAMANGALA RESIDENCY_MAR 24.pdf · uploaded 27 Apr 2024Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE.pdf · uploaded 17 Aug 2024Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM -2 Structural Eng certificate.pdf · uploaded 17 Aug 2024Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM -3 CA CERTIFICATE_compressed.pdf · uploaded 17 Aug 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)1 FORM 1_ SEP 24.pdf · uploaded 22 Oct 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)3 FORM 3_ SEP 24_compressed.pdf · uploaded 22 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)2 FORM 2_ SEP 24.pdf · uploaded 22 Oct 2024Source
  • 2 Disclosure of sold/ booked inventory4 SOLD UNSOLD_SEP 24.pdf · uploaded 22 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1_OM SAI HOMES BUILDERS_SARVAMANGALAM RESIDENCY_DECEMBER 2024.pdf · uploaded 23 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3_OM SAI HOMES BUILDERS_SARVAMANGALAM RESIDENCY_DECEMBER 2024_compressed.pdf · uploaded 23 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2_ OM SAI HOMES BUILDERS_SARVAMANGALAM RESIDENCY_DECEMBER 2024.pdf · uploaded 23 Jan 2025Source
  • 1 Disclosure of sold/ booked inventorySOLD UNSOLD_ OM SAI HOMES BUILDERS_SARVAMANGALAM RESIDENCY_DECEMBER 2024.pdf · uploaded 23 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1_Om Sai Homes Builders_ SARVAMANGALA RESIDENCY_ MARCH 25.pdf · uploaded 25 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3_ Om Sai Homes Builders_ SARVAMANGALA RESIDENCY_ MARCH 25.pdf · uploaded 25 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2_ Om Sai Homes Builders_ SARVAMANGALA RESIDENCY_ MARCH 25.pdf · uploaded 25 Apr 2025Source
  • 1 Disclosure of sold/ booked inventorySOLD UNSOLD_Om Sai Homes Builders_ SARVAMANGALA RESIDENCY_ MARCH 25.pdf · uploaded 25 Apr 2025Source
  • Form 1FORM 1_ JUNE 25_ SARMANGALA RESIDENCY.pdf · uploaded 14 Nov 2025Source
  • Form 2FORM 2_ JUNE 25_ SARVAMANGALA RESIDENCY.pdf · uploaded 14 Nov 2025Source
  • Form 3FORM 3_ JUNE 25_ SARVAMANGAL RESIDENCY.pdf · uploaded 14 Nov 2025Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD_ JUNE 25_ SARVAMANGALA RESIDENCY.pdf · uploaded 14 Nov 2025Source
  • Form 1FORM 1_ SEP 25_ SARMANGALA RESIDENCY.pdf · uploaded 14 Nov 2025Source
  • Form 2FORM 2_ SEP 25_ SARMANGALA RESIDENCY.pdf · uploaded 14 Nov 2025Source
  • Form 3FORM 3_ SEP 25_ SARMANGALA RESIDENCY.pdf · uploaded 14 Nov 2025Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD_ SEP 25_ SARMANGALA RESIDENCY.pdf · uploaded 14 Nov 2025Source
  • Withdrawal Update Form 1FORM 1_ DEC 25_ SARVAMANGALA RESIDENCY.pdf · uploaded 4 Feb 2026Source
  • Withdrawal Update Form 2FORM 2_ DEC 25_ SARVAMANGALA RESIDENCY.pdf · uploaded 4 Feb 2026Source
  • Withdrawal Update Form 3Withdrawal Application Form3_DEC 25_ SARVAMANGALA RESIDENCY.pdf · uploaded 4 Feb 2026Source
  • Form 2A (FY 2023-2024)FORM 2A_ MARCH 24_ SARVAMANGALA RESIDENCY.pdf · uploaded 9 Feb 2026Source
  • Form 2A (FY 2024-2025)FORM 2A_ MARCH 25_ SARVAMANGALA RESIDENCY.pdf · uploaded 9 Feb 2026Source
  • Form 5 (FY 2023-2024)FORM 5_ MARCH 24_ SARVAMANGALA RESIDENCY.pdf · uploaded 9 Feb 2026Source
  • Form 5 (FY 2024-2025)FORM 5_ MARCH 25_ SARVAMANGALA RESIDENCY.pdf · uploaded 9 Feb 2026Source
  • Withdrawal Update Form 1FORM 1_ MAR 26_ SARVAMANGALA RESIDENCY (2).pdf · uploaded 8 May 2026Source
  • Withdrawal Update Form 2FORM 2_ MAR 26_ SARVAMANGALA RESIDENCY.pdf · uploaded 8 May 2026Source
  • Withdrawal Update Form 3FORM 3_ MAR 26_ SARVAMANGALA RESIDENCY.pdf · uploaded 8 May 2026Source
  • Withdrawal Update Form 1FORM 1_ JUNE 26_ SARVAMANGALA RESIDENCY.pdf · uploaded 6 Aug 2026Source
  • Withdrawal Update Form 2FORM 2_ JUNE 26_ SARVAMANGALA RESIDENCY.pdf · uploaded 6 Aug 2026Source
  • Withdrawal Update Form 3FORM 3_ JUNE 26_ SARVAMANGALA RESIDENCY.pdf · uploaded 6 Aug 2026Source
  • Form 2A (FY 2025-2026)FORM 2A_ MARCH 26_ SARVAMANGALA RESIDENCY.pdf · uploaded 11 Aug 2026Source

Technical

  • Documentlp 1.pdf · uploaded 12 May 2022Source
  • Documentlp2.pdf · uploaded 12 May 2022Source
  • Documentbp3.pdf · uploaded 12 May 2022Source
  • Documentbp4.pdf · uploaded 12 May 2022Source
  • Documentbp5.pdf · uploaded 12 May 2022Source
  • Documentbp6.pdf · uploaded 12 May 2022Source
  • DocumentRevised approved Drawings_compressed_compressed.pdf · uploaded 8 Jan 2026Source
  • DocumentSANCTIONED LAYOUT PLAN_compressed.pdf · uploaded 11 May 2026Source
  • DocumentREVISED PLANS-1-compressed.pdf · uploaded 9 Sep 2026Source
  • DocumentREVISED PLANS-2.pdf · uploaded 9 Sep 2026Source
  • DocumentREVISED PLANS-3-compressed.pdf · uploaded 9 Sep 2026Source
  • DocumentREVISED PLANS-4-compressed.pdf · uploaded 9 Sep 2026Source

Technical (Architect)

  • Document1 FORM 1_ SEP 24.pdf · uploaded 22 Oct 2024Source
  • DocumentFORM 1_OM SAI HOMES BUILDERS_SARVAMANGALAM RESIDENCY_DECEMBER 2024.pdf · uploaded 23 Jan 2025Source
  • DocumentFORM 1_Om Sai Homes Builders_ SARVAMANGALA RESIDENCY_ MARCH 25.pdf · uploaded 25 Apr 2025Source
  • DocumentFORM 1_ JUNE 26_ SARVAMANGALA RESIDENCY.pdf · uploaded 6 Aug 2026Source

Technical (Engineer)

  • Document2 FORM 2_ SEP 24.pdf · uploaded 22 Oct 2024Source
  • DocumentFORM 2_ OM SAI HOMES BUILDERS_SARVAMANGALAM RESIDENCY_DECEMBER 2024.pdf · uploaded 23 Jan 2025Source
  • DocumentFORM 2_ Om Sai Homes Builders_ SARVAMANGALA RESIDENCY_ MARCH 25.pdf · uploaded 25 Apr 2025Source
  • DocumentFORM 2_ JUNE 26_ SARVAMANGALA RESIDENCY.pdf · uploaded 6 Aug 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Tupgaon, Khalapur taluka

Survey, CTS, gat or plot numbers

GUT NO. 4/4/AGUT NO.6

Boundaries

North
Gut No 4-3
South
Gut No 4-4-C
East
Pond
West
Gut No 4-2 And 4-4

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectJeetendra Parmar—
Chartered accountantCa Deepesh Shah—
EngineerEr Aniket Deshmukh—
EngineerEr Vijesh Shetty—
EngineerStructon Consulting Engineers—

Source: MahaRERA project page. Contact details are not shown.