Ganushet Keni Heritage
Certificate SignedTaloje Panchnad, Raigarh 410208 |Promoter: Dinesh Manohar Keni
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Buildings
- 1
- Unit types
- —82 units in all
- Address
- Plot No -19, Sector -24, TalojaPIN 410208
- Designated bank account
- 76
- Developed in phases
- No
Location
Coordinates as published by MahaRERA
Latest registered deals
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 4 months
- Registered
- 24 Mar 2022
- Promised
- 30 Jun 2027
- Revised
- 30 Oct 2027
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52000034093 | 24 Mar 2022 | 30 Jun 2027 | 30 Oct 2027 | Dinesh Manohar Keni | Project page |
1 building
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Ganushet Keni Heritage | 21 | 82 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
82 units registered
| Type | Carpet area | Units |
|---|---|---|
| — | — | 82 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
2 documents held by Deedo, 141 filings listed on MahaRERA's project page
Finance
- PAN CardPancard Dinesh keni.pdf · uploaded 1 Mar 2022Source
Legal
Show all 143 documentsShow fewer documents
Migrated
- 1 Building Plan Approval / NA Order for plotted developmentPlan 19.pdf · uploaded 1 Mar 2022Source
- 1 Declaration about Commencement CertificateScan01032022202437.pdf · uploaded 1 Mar 2022Source
- 1 Declaration in FORM BForm B Promoter Dinesh Keni .pdf · uploaded 1 Mar 2022Source
- 1 CERSAI detailsGanushet Keni Heritage.pdf · uploaded 1 Mar 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Ganushet.pdf · uploaded 1 Mar 2022Source
- 1 Proforma of Allotment letterdownload (1).pdf · uploaded 1 Mar 2022Source
- 2 Proforma of Allotment letterdownload (2).pdf · uploaded 1 Mar 2022Source
- 1 Copy of the legal title reportDinesh Keni Title.pdf · uploaded 9 Mar 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentdownload (1)_merged.pdf · uploaded 15 Mar 2022Source
- 1 Disclosure of sold/ booked inventory29- Ganushet.pdf · uploaded 23 May 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Ganushet Keni Heritage Form 2- 31 March 2022_compressed (1).pdf · uploaded 22 Jun 2022Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Ganushet Keni Heritage as on March 2022.pdf · uploaded 22 Jun 2022Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Ganushet Keni June 2022.pdf · uploaded 3 Sep 2022Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Certificate June 2022.pdf · uploaded 3 Sep 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)19-24-TALOJA RERA_compressed.pdf · uploaded 30 Sep 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 of Ganushet Keni Heritage FY 2021-22.pdf · uploaded 30 Sep 2022Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Ganushet Keni Heritage Form 2- September 2022.pdf · uploaded 31 Oct 2022Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 of Ganushet Keni 30 September 2022 FINAL.pdf · uploaded 31 Oct 2022Source
- 2 Disclosure of sold/ booked inventoryCircular 29- Ganushet Keni Heritage.pdf · uploaded 9 Nov 2022Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Ganushet Keni Heritage as on December 2022.pdf · uploaded 27 Feb 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Ganushet Keni Heritage as on December 2022.pdf · uploaded 27 Feb 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3- Ganushet Keni as on December 2022.pdf · uploaded 27 Feb 2023Source
- 3 Disclosure of sold/ booked inventoryCircular 29- Ganushet Keni Heritage.pdf · uploaded 28 Feb 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 21 Apr 2023Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 of Ganushet Keni.pdf · uploaded 21 Apr 2023Source
- 1 Disclosure of Interest in Other Real Estate Organizationsannexure GKH.pdf · uploaded 29 Apr 2023Source
- 2 Disclosure of Interest in Other Real Estate Organizationsannexure GKH.pdf · uploaded 29 Apr 2023Source
- 4 Disclosure of sold/ booked inventoryAdobe Scan 30-May-2023.pdf · uploaded 30 May 2023Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Ganushet Keni Heritage as on June 2023.pdf · uploaded 12 Jul 2023Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3- Ganushet Keni Heritage as on June 2023.pdf · uploaded 12 Jul 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 as on June 2023.pdf · uploaded 14 Aug 2023Source
- 5 Disclosure of sold/ booked inventoryCircular 29- Ganushet Keni.pdf · uploaded 29 Aug 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 Ganushet Keni Heritage FY 2022-23.pdf · uploaded 27 Sep 2023Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 of Ganushet Keni as on 30-09-2023.pdf · uploaded 10 Oct 2023Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Ganushet Keni Heritage as on Sep 2023.pdf · uploaded 12 Oct 2023Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Ganushet Keni Heritage as on December 2023.pdf · uploaded 5 Jan 2024Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Ganushet Keni Heritage as on December 2023.pdf · uploaded 5 Jan 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Ganushet Keni Heritage Dec 23.pdf · uploaded 15 Jan 2024Source
- 6 Disclosure of sold/ booked inventoryCircular 29.pdf · uploaded 20 Feb 2024Source
- 7 Disclosure of sold/ booked inventoryCircular 29.pdf · uploaded 20 Feb 2024Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Ganushet Keni Heritage as on March 2024.pdf · uploaded 8 Apr 2024Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Ganushet Keni Heritage as on March 2024.pdf · uploaded 8 Apr 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 march 24.pdf · uploaded 11 Apr 2024Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)Eng certificate march 24.pdf · uploaded 11 Apr 2024Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA certificate March 24.pdf · uploaded 11 Apr 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Mar 2021.pdf · uploaded 24 Apr 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 June 2021.pdf · uploaded 24 Apr 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Sept 2021.pdf · uploaded 24 Apr 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Dec 2021.pdf · uploaded 24 Apr 2024Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Mar 2022.pdf · uploaded 24 Apr 2024Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 June 2022.pdf · uploaded 24 Apr 2024Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Dec 2022.pdf · uploaded 24 Apr 2024Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Mar 2023.pdf · uploaded 24 Apr 2024Source
- 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Jun 2023.pdf · uploaded 24 Apr 2024Source
- 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Dec 2023.pdf · uploaded 24 Apr 2024Source
- 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 march 24.pdf · uploaded 24 Apr 2024Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Mar 2022.pdf · uploaded 24 Apr 2024Source
- 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Jun 2022.pdf · uploaded 24 Apr 2024Source
- 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Sept 2022.pdf · uploaded 24 Apr 2024Source
- 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Dec 2022.pdf · uploaded 24 Apr 2024Source
- 16 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Mar 2023.pdf · uploaded 24 Apr 2024Source
- 17 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 June 2023.pdf · uploaded 24 Apr 2024Source
- 18 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Sept 2023.pdf · uploaded 24 Apr 2024Source
- 19 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Dec 2023.pdf · uploaded 24 Apr 2024Source
- 20 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Mar 2024.pdf · uploaded 24 Apr 2024Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Mar 2022.pdf · uploaded 24 Apr 2024Source
- 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Mar 2022.pdf · uploaded 24 Apr 2024Source
- 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 June 2022.pdf · uploaded 24 Apr 2024Source
- 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Sept 2022.pdf · uploaded 24 Apr 2024Source
- 16 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Dec 2022.pdf · uploaded 24 Apr 2024Source
- 17 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Mar 2023.pdf · uploaded 24 Apr 2024Source
- 18 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Jun 2023.pdf · uploaded 24 Apr 2024Source
- 19 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Sept 2023.pdf · uploaded 24 Apr 2024Source
- 20 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Mar 2023.pdf · uploaded 24 Apr 2024Source
- 21 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Jun 2023.pdf · uploaded 24 Apr 2024Source
- 22 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Sept 2023.pdf · uploaded 24 Apr 2024Source
- 23 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Dec 2023.pdf · uploaded 24 Apr 2024Source
- 24 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Mar 2024.pdf · uploaded 24 Apr 2024Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 2021-22.pdf · uploaded 24 Apr 2024Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 2022-23.pdf · uploaded 24 Apr 2024Source
- 8 Disclosure of sold/ booked inventoryCircular 29 - Ganushet Keni Heritage as on March 2024.pdf · uploaded 14 Jun 2024Source
- 16 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Ganushet Keni Heritage as on June 2024.pdf · uploaded 12 Jul 2024Source
- 21 Engineer’s Certificate on Cost Incurred on Project (Form 2)20 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 20 Jul 2024Source
- 25 CA Certificate on Project Cost & Fund withdrawal (Form 3)ggggggggg.pdf · uploaded 20 Jul 2024Source
- 17 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 june 24.pdf · uploaded 12 Aug 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 Ganushet Keni Heritage FY 2023-24.pdf · uploaded 11 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)17 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 14 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Ganushet Keni Heritage as on Sept 2024.pdf · uploaded 14 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Ganushet Keni Heritage as on Sept 2024.pdf · uploaded 14 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 sept 24.pdf · uploaded 26 Oct 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Final Form 3 of Ganushet Keni as on 30-06-2024_compressed.pdf · uploaded 26 Oct 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Ganushet Keni Heritage as on June 2024.pdf · uploaded 26 Oct 2024Source
- 1 Details of encumbrancesEncumbrance letter - Ganushet Keni Heritage.pdf · uploaded 22 Nov 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Final Form 3 of Ganushet Keni Heritage as on 31-12-2024.pdf · uploaded 13 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Ganushet Keni Heritage as on Dec 2024.pdf · uploaded 13 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Ganushet keni Heritage as on March 2025.pdf · uploaded 15 Apr 2025Source
- Form 1Form 1 - Ganushet Keni Heritage as on June 2025.pdf · uploaded 18 Jul 2025Source
- Form 2Form 2 - Ganushet Keni Heritage as on June 2025.pdf · uploaded 18 Jul 2025Source
- Form 3Form 3 - Ganushet Keni Heritage as on June 2025.pdf · uploaded 18 Jul 2025Source
- Disclosure of Sold and Booked InventoryCircular 29 - Ganushet Keni Heritage as on June 2025.pdf · uploaded 18 Jul 2025Source
- Form 1Form 1 - Ganushet keni Heritage as on March 2025.pdf · uploaded 4 Sep 2025Source
- Form 2Form 2 - Ganushet Keni Heritage as on March 2025.pdf · uploaded 4 Sep 2025Source
- Form 3Form 3 - Ganushet Keni Heritage as on March 2025.pdf · uploaded 4 Sep 2025Source
- Disclosure of Sold and Booked InventoryCircular 29 - Ganushet Keni Heritage as on March 2025.pdf · uploaded 4 Sep 2025Source
- Form 1Form 1 - Ganushet Keni Heritage as on Sep 2025.pdf · uploaded 13 Oct 2025Source
- Form 2Form 2 - Ganushet Keni Heritage as on Sep 2025.pdf · uploaded 13 Oct 2025Source
- Form 3Form 3 - Ganushet Keni Heritage as on Sep 2025.pdf · uploaded 13 Oct 2025Source
- Disclosure of Sold and Booked InventoryCircular 29 - Ganushet Keni Heritage as on Sep 2025.pdf · uploaded 13 Oct 2025Source
- Withdrawal Update Form 1Form 1 - Ganushet Keni Heritage as on Dec 2025.pdf · uploaded 17 Jan 2026Source
- Withdrawal Update Form 2Form 2 - Ganushet Keni Heritage as on Dec 2025.pdf · uploaded 17 Jan 2026Source
- Withdrawal Update Form 3Form 3 - Ganushet Keni Heritage as on Dec 2025.pdf · uploaded 17 Jan 2026Source
- Withdrawal Update Form 1Form 1 - Ganushet Keni Heritage as on March 2026.pdf · uploaded 6 May 2026Source
- Withdrawal Update Form 2Form 2 - Ganushet Keni Heritage as on March 2026.pdf · uploaded 6 May 2026Source
- Withdrawal Update Form 3Form 3 - Ganushet Keni Heritage as on March 2026.pdf · uploaded 6 May 2026Source
- Form 5 (FY 2024-2025)Form 5 Ganushet Keni Heritage FY 2024-25.pdf · uploaded 6 Jun 2026Source
- Withdrawal Update Form 1Form 1 - Ganushet Keni Heritage as on June 2026.pdf · uploaded 3 Aug 2026Source
- Withdrawal Update Form 2Form 2 - Ganushet Keni Heritage as on June 2026.pdf · uploaded 3 Aug 2026Source
- Withdrawal Update Form 3Form 3 - Ganushet Keni Heritage as on June 2026.pdf · uploaded 3 Aug 2026Source
Technical
- DocumentPlan 19.pdf · uploaded 1 Mar 2022Source
- DocumentPlan 19.pdf · uploaded 1 Mar 2022Source
- DocumentPlan dated 25-02-2020 (1)-1.pdf · uploaded 11 Apr 2026Source
- DocumentPlan dated 25-02-2020 (1)-2.pdf · uploaded 11 Apr 2026Source
- DocumentPlan dated 25-02-2020 (1)-3.pdf · uploaded 11 Apr 2026Source
- DocumentPlan dated 25-02-2020 (1)-4.pdf · uploaded 11 Apr 2026Source
- DocumentPlan dated 25-02-2020 (1)-5.pdf · uploaded 11 Apr 2026Source
- DocumentPlan dated 25-02-2020 (1)-6.pdf · uploaded 11 Apr 2026Source
- DocumentPlan dated 25-02-2020 (1)-7.pdf · uploaded 11 Apr 2026Source
Technical (Architect)
- Document17 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 14 Oct 2024Source
- Documentform 1 sept 24.pdf · uploaded 26 Oct 2024Source
- DocumentForm 1 - Ganushet keni Heritage as on March 2025.pdf · uploaded 15 Apr 2025Source
- DocumentForm 1 - Ganushet Keni Heritage as on June 2026.pdf · uploaded 3 Aug 2026Source
Technical (Engineer)
- DocumentForm 2 - Ganushet Keni Heritage as on Sept 2024.pdf · uploaded 14 Oct 2024Source
- DocumentForm 2 - Ganushet Keni Heritage as on June 2024.pdf · uploaded 26 Oct 2024Source
- DocumentForm 2 - Ganushet Keni Heritage as on Dec 2024.pdf · uploaded 13 Jan 2025Source
- DocumentForm 2 - Ganushet Keni Heritage as on June 2026.pdf · uploaded 3 Aug 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Taloje Panchnad, Panvel taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Plot No -16 and 22
- South
- 15 Mtr Wide Road
- East
- Plot No -20
- West
- Plot No -17 and 18
Source: registration certificates and MahaRERA's project page, as stated there.