Pen, Maharashtra 402107 |Promoter: Revanath Dasharath Patil

8 Jun 2023Registered with MahaRERA
31 Mar 2026Promised completion
1Building
71Units registered7 booked (10%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Buildings
1
Unit types
1BHK, 1RK, 2BHK, Shop71 units in all
Address
Survey No 378/2/1, Pen, PenPIN 402107
Designated bank account
229
Developed in phases
No

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 18.73711, 73.09428
Dream House is at latitude 18.73711, longitude 73.09428.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Mar 2026

The latest completion date on record passed 7 months ago.

Registered
8 Jun 2023
Promised
31 Mar 2026

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P520000512868 Jun 202331 Mar 202631 Mar 2026Revanath Dasharath PatilProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Dream House771

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

7 of 71 units booked (10%), as the promoter reported to MahaRERA

1BHK · 56 units1RK · 3 units2BHK · 3 unitsShop · 9 units
TypeCarpet areaUnitsBooked
1BHK33.25 sq m · 358 sq ft70
1BHK34.76 sq m · 374 sq ft10
1BHK35.2 sq m · 379 sq ft50
1BHK35.4 sq m · 381 sq ft70
1BHK35.6 sq m · 383 sq ft60
1BHK35.66 sq m · 384 sq ft10
1BHK35.67 sq m · 384 sq ft50
1BHK35.73 sq m · 385 sq ft60
Show all 23 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
1BHK35.77 sq m · 385 sq ft20
1BHK36.28 sq m · 391 sq ft60
1BHK37.33 sq m · 402 sq ft40
1BHK39.04 sq m · 420 sq ft60
1RK24.11 sq m · 260 sq ft30
2BHK47.22 sq m · 508 sq ft31
Shop8.85 sq m · 95 sq ft11
Shop11.11 sq m · 120 sq ft11
Shop11.96 sq m · 129 sq ft11
Shop12.36 sq m · 133 sq ft10
Shop13.85 sq m · 149 sq ft10
Shop15.82 sq m · 170 sq ft11
Shop16 sq m · 172 sq ft11
Shop16.55 sq m · 178 sq ft10
Shop16.66 sq m · 179 sq ft11

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 127 filings listed on MahaRERA's project page

Registration certificate

Finance

  • Other – Financedeclaration_letter_namechange.pdf · uploaded 1 May 2023Source
  • Other – FinanceClarification_letter.pdf · uploaded 1 May 2023Source
  • PAN CardPAN Aadhar merged.pdf · uploaded 11 May 2023Source
  • Other – FinanceClarification merged.pdf · uploaded 11 May 2023Source
  • Other – FinanceCLARIFICATION.pdf · uploaded 11 May 2023Source

Legal

  • Legal Title reportTitle report.pdf · uploaded 17 Apr 2023Source
  • Declaration Form BFormB.pdf · uploaded 1 May 2023Source
Show all 128 documentsShow fewer documents

Migrated

  • 1 Copy of the legal title reportTitle report.pdf · uploaded 17 Apr 2023Source
  • 1 Copy of Layout Approval (in case of layout)Approved PLA COPY.PDF · uploaded 17 Apr 2023Source
  • 1 CERSAI detailsCERSAI pdf.pdf · uploaded 17 Apr 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameSeparate bank acc.pdf · uploaded 17 Apr 2023Source
  • 1 a Details of encumbrances concerned to FinanceDeclaration Finance Encumb.pdf · uploaded 18 Apr 2023Source
  • 2 a Details of encumbrances concerned to Financeself declaration about encumb.pdf · uploaded 18 Apr 2023Source
  • 1 b Details of encumbrances concerned to LegalDeclaration Finance Encumb.pdf · uploaded 18 Apr 2023Source
  • 2 b Details of encumbrances concerned to Legalself declaration about encumb.pdf · uploaded 18 Apr 2023Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencement certificate.pdf · uploaded 18 Apr 2023Source
  • 1 Declaration about Commencement CertificateForm D.pdf · uploaded 18 Apr 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect certificate.pdf · uploaded 18 Apr 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)engineer certificate.pdf · uploaded 18 Apr 2023Source
  • 1 Disclosure of sold/ booked inventoryUnsold Inventory.pdf · uploaded 18 Apr 2023Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure interest.pdf · uploaded 18 Apr 2023Source
  • 1 Proforma of Agreement for saleAGREEMENT FOR SALE.pdf · uploaded 18 Apr 2023Source
  • 1 Deviation Report with respect to model copy of AgreementNo deviation_Agreement for sale.pdf · uploaded 18 Apr 2023Source
  • 1 Proforma of Allotment letterAllotment letter_merged.pdf · uploaded 21 Apr 2023Source
  • 1 Deviation Report with respect to Allotment letterNo deviation allotment letter.pdf · uploaded 21 Apr 2023Source
  • 1 Declaration in FORM BFormB.pdf · uploaded 1 May 2023Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate.pdf · uploaded 1 May 2023Source
  • 1 Other – Financedeclaration_letter_namechange.pdf · uploaded 1 May 2023Source
  • 2 Other – FinanceClarification_letter.pdf · uploaded 1 May 2023Source
  • 1 PAN CardPAN Aadhar merged.pdf · uploaded 11 May 2023Source
  • 1 Building Plan Approval / NA Order for plotted developmentApproved PLA COPY.PDF · uploaded 11 May 2023Source
  • 2 Building Plan Approval / NA Order for plotted developmentORIGINAL PLAN.PDF · uploaded 11 May 2023Source
  • 3 Building Plan Approval / NA Order for plotted developmentVIEW PLAN.PDF · uploaded 11 May 2023Source
  • 4 Building Plan Approval / NA Order for plotted developmentWorking PLAN.PDF · uploaded 11 May 2023Source
  • 3 Other – FinanceClarification merged.pdf · uploaded 11 May 2023Source
  • 4 Other – FinanceCLARIFICATION.pdf · uploaded 11 May 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)DSCARCHITECT CERTIFICATE.pdf · uploaded 13 Mar 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)DSC ENGINEER CERTIFICATE.pdf · uploaded 13 Mar 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect certificate.pdf · uploaded 8 Apr 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer certificate.pdf · uploaded 8 Apr 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)01-ARCHITECTS CERTIFICATE 30-06-2023.pdf · uploaded 12 Jul 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)02-ARCHITECTS CERTIFICATE 30-09-2023.pdf · uploaded 12 Jul 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)03-ARCHITECTS CERTIFICATE 31-12-2023.pdf · uploaded 12 Jul 2024Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)04-ARCHITECTS CERTIFICATE 31-03-2024.pdf · uploaded 12 Jul 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)01-ENGINEERS CERTIFICATE 30-06-2023.pdf · uploaded 12 Jul 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)02-ENGINEERS CERTIFICATE 30-09-2023.pdf · uploaded 12 Jul 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)03-ENGINEERS CERTIFICATE 31-12-2023.pdf · uploaded 12 Jul 2024Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)04-ENGINEERS CERTIFICATE 31-03-2024.pdf · uploaded 12 Jul 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)01-CA CERTIFICATE - 01-04-2023 to 30-06-2023.pdf · uploaded 12 Jul 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)02-CA CERTIFICATE - 01-07-2023 to 30-09-2023.pdf · uploaded 12 Jul 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)03-CA CERTIFICATE - 01-10-2023 to 31-12-2023.pdf · uploaded 12 Jul 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)04-CA CERTIFICATE - 01-01-2024 to 31-03-2024.pdf · uploaded 12 Jul 2024Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)05-ARCHITECTS CERTIFICATE 30-06-2024.pdf · uploaded 8 Aug 2024Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)05-ENGINEERS CERTIFICATE 30-06-2024.pdf · uploaded 8 Aug 2024Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)04-CA CERTIFICATE - 01-01-2024 to 31-03-2024.pdf · uploaded 8 Aug 2024Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)05-C A CERTIFICATE - 01-04-2024 to 30-06-2024.pdf · uploaded 8 Aug 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5-FY 2023-24.pdf · uploaded 8 Aug 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)06-ARCHITECTS CERTIFICATE 30-09-2024.pdf · uploaded 19 Oct 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)06-CA CERTIFICATE - 01-07-2024 to 30-09-2024.pdf · uploaded 19 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)06-ENGINEERS CERTIFICATE 30-09-2024.pdf · uploaded 19 Oct 2024Source
  • 1 Disclosure of Interest in Other Real Estate Organizations06-CA CERTIFICATE - 01-07-2024 to 30-09-2024.pdf · uploaded 19 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)07-ARCHITECTS CERTIFICATE 31-12-2024.pdf · uploaded 22 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)07-CA CERTIFICATE - 01-10-2024 to 31-12-2024.pdf · uploaded 22 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)07-ENGINEERS CERTIFICATE-31-12-2024.pdf · uploaded 22 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)08-CA CERTIFICATE - 01-10-2024 to 31-03-2025.pdf · uploaded 24 Apr 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)08-ENGINEERS CERTIFICATE-31-03-2025.pdf · uploaded 24 Apr 2025Source
  • Withdrawal Update Form 108-ARCHITECTS CERTIFICATE 30-06-2025.pdf · uploaded 2 Sep 2025Source
  • Withdrawal Update Form 209-ENGINEERS CERTIFICATE-30-06-2025.pdf · uploaded 2 Sep 2025Source
  • Withdrawal Update Form 309-CA CERTIFICATE - 01-04-2025 to 30-06-2025.pdf · uploaded 2 Sep 2025Source
  • Withdrawal Update Form 110-ARCHITECTS CERTIFICATE-30-09-2025.pdf · uploaded 22 Nov 2025Source
  • Withdrawal Update Form 210-ENGINEERS CERTIFICAE-30-09-2025.pdf · uploaded 22 Nov 2025Source
  • Withdrawal Update Form 310-CA CERTIFICATE - 01-07-2025 to 30-09-2025.pdf · uploaded 22 Nov 2025Source
  • Form 5 (FY 2023-2024)Form 5-FY 2023-24.pdf · uploaded 22 Nov 2025Source
  • Form 5 (FY 2024-2025)Form-5-FY 2024-25.pdf · uploaded 22 Nov 2025Source
  • Withdrawal Update Form 111-ARCHITECTS CERTIFICATE-31-12-2025.pdf · uploaded 2 Feb 2026Source
  • Withdrawal Update Form 211-ENGINEERS CERTIFICATE-31-12-2025.pdf · uploaded 2 Feb 2026Source
  • Withdrawal Update Form 311-CA CERTIFICATE - 01-10-2025 to 31-12-2025.pdf · uploaded 2 Feb 2026Source
  • Withdrawal Update Form 112-ARCHITECTS CERTIFICATE-31-03-2026.pdf · uploaded 21 May 2026Source
  • Withdrawal Update Form 212-ENGINEERS CERTIFICATE-31-03-2026.pdf · uploaded 21 May 2026Source
  • Withdrawal Update Form 312 CA CERTIFICATE 0103026 to 31032026.pdf · uploaded 21 May 2026Source
  • Form 2A (FY 2023-2024)2A Form FY2324.pdf · uploaded 24 Aug 2026Source
  • Form 2A (FY 2024-2025)2A Form FY2425.pdf · uploaded 24 Aug 2026Source
  • Form 2A (FY 2025-2026)2A Form FY2526.pdf · uploaded 24 Aug 2026Source
  • Form 5 (FY 2025-2026)CA Certificate FY2526.pdf · uploaded 24 Aug 2026Source
  • Form 101-ARCHITECTS CERTIFICATE 30-06-2023.pdf · uploaded 8 Oct 2026Source
  • Form 201-ENGINEERS CERTIFICATE 30-06-2023.pdf · uploaded 8 Oct 2026Source
  • Form 301-CA CERTIFICATE - 01-04-2023 to 30-06-2023.pdf · uploaded 8 Oct 2026Source
  • Disclosure of Sold and Booked Inventory01-Sold and Unsold Inventory 30092023.pdf · uploaded 8 Oct 2026Source
  • Form 102-ARCHITECTS CERTIFICATE 30-09-2023.pdf · uploaded 8 Oct 2026Source
  • Form 202-ENGINEERS CERTIFICATE 30-09-2023.pdf · uploaded 8 Oct 2026Source
  • Form 302-CA CERTIFICATE - 01-07-2023 to 30-09-2023.pdf · uploaded 8 Oct 2026Source
  • Disclosure of Sold and Booked Inventory02-Sold and Unsold Invenotry 30092023.pdf · uploaded 8 Oct 2026Source
  • Form 103-ARCHITECTS CERTIFICATE 31-12-2023.pdf · uploaded 8 Oct 2026Source
  • Form 203-ENGINEERS CERTIFICATE 31-12-2023.pdf · uploaded 8 Oct 2026Source
  • Form 303-CA CERTIFICATE - 01-10-2023 to 31-12-2023.pdf · uploaded 8 Oct 2026Source
  • Disclosure of Sold and Booked Inventory03-Sold and Unsold Invenotry 31122023.pdf · uploaded 8 Oct 2026Source
  • Form 104-ARCHITECTS CERTIFICATE 31-03-2024.pdf · uploaded 8 Oct 2026Source
  • Form 204-ENGINEERS CERTIFICATE 31-03-2024.pdf · uploaded 8 Oct 2026Source
  • Form 304-CA CERTIFICATE - 01-01-2024 to 31-03-2024.pdf · uploaded 8 Oct 2026Source
  • Disclosure of Sold and Booked Inventory04-Sold and Unsold Invenotry 31032024.pdf · uploaded 8 Oct 2026Source
  • Form 105-ARCHITECTS CERTIFICATE 30-06-2024.pdf · uploaded 8 Oct 2026Source
  • Form 205-ENGINEERS CERTIFICATE 30-06-2024.pdf · uploaded 8 Oct 2026Source
  • Form 305-C A CERTIFICATE - 01-04-2024 to 30-06-2024.pdf · uploaded 8 Oct 2026Source
  • Disclosure of Sold and Booked Inventory05-Sold and Unsold Invenotry 30062024.pdf · uploaded 8 Oct 2026Source
  • Form 106-ARCHITECTS CERTIFICATE 30-09-2024.pdf · uploaded 8 Oct 2026Source
  • Form 206-ENGINEERS CERTIFICATE 30-09-2024.pdf · uploaded 8 Oct 2026Source
  • Form 306-CA CERTIFICATE - 01-07-2024 to 30-09-2024.pdf · uploaded 8 Oct 2026Source
  • Disclosure of Sold and Booked Inventory06-Sold and Unsold Invenotry 30092024.pdf · uploaded 8 Oct 2026Source
  • Form 107-ARCHITECTS CERTIFICATE 31-12-2024.pdf · uploaded 8 Oct 2026Source
  • Form 207-ENGINEERS CERTIFICATE-31-12-2024.pdf · uploaded 8 Oct 2026Source
  • Form 307-CA CERTIFICATE - 01-10-2024 to 31-12-2024.pdf · uploaded 8 Oct 2026Source
  • Disclosure of Sold and Booked Inventory07-Sold and Unsold Invenotry 31122024.pdf · uploaded 8 Oct 2026Source
  • Form 109-ARCHITECTS CERTIFICATE 30-06-2025.pdf · uploaded 8 Oct 2026Source
  • Form 208-ENGINEERS CERTIFICATE-31-03-2025.pdf · uploaded 8 Oct 2026Source
  • Form 308-CA CERTIFICATE - 01-01-2025 to 31-03-2025.pdf · uploaded 8 Oct 2026Source
  • Disclosure of Sold and Booked Inventory08-Sold and Unsold Invenotry 31032025.pdf · uploaded 8 Oct 2026Source

Technical

  • DocumentApproved PLA COPY.PDF · uploaded 17 Apr 2023Source
  • DocumentApproved PLA COPY.PDF · uploaded 11 May 2023Source
  • DocumentORIGINAL PLAN.PDF · uploaded 11 May 2023Source
  • DocumentVIEW PLAN.PDF · uploaded 11 May 2023Source
  • DocumentWorking PLAN.PDF · uploaded 11 May 2023Source

Technical (Architect)

  • Document06-ARCHITECTS CERTIFICATE 30-09-2024.pdf · uploaded 19 Oct 2024Source
  • Document07-ARCHITECTS CERTIFICATE 31-12-2024.pdf · uploaded 22 Jan 2025Source
  • Document12-ARCHITECTS CERTIFICATE-31-03-2026.pdf · uploaded 21 May 2026Source

Technical (Engineer)

  • Document06-ENGINEERS CERTIFICATE 30-09-2024.pdf · uploaded 19 Oct 2024Source
  • Document07-ENGINEERS CERTIFICATE-31-12-2024.pdf · uploaded 22 Jan 2025Source
  • Document12-ENGINEERS CERTIFICATE-31-03-2026.pdf · uploaded 21 May 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectJagruti M Mhatre—
Chartered accountantS C Bhate & Associates—
EngineerMangesh Mhatre—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology