Sai Namah
Certificate SignedPanvel, Raigarh 410206 |Promoter: Swapnil Mohan Kalyankar
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Buildings
- 1
- Unit types
- 2BHK, 3BHK, Office space, Shop, Theatre83 units in all
- Address
- Final Plot No. - 225/2PIN 410206
- Designated bank account
- 87
- Developed in phases
- No
Location
Coordinates as published by MahaRERA
Latest registered deals
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 4 months
- Registered
- 8 Jun 2023
- Promised
- 31 Dec 2030
- Revised
- 30 Apr 2031
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52000051272 | 8 Jun 2023 | 31 Dec 2030 | 30 Apr 2031 | Swapnil Mohan Kalyankar | Project page |
1 building
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Sai Namah | 11 | 83 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
1 of 83 units booked (1%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 2BHK | 55.66 sq m · 599 sq ft | 30 | 0 |
| 2BHK | 57.96 sq m · 624 sq ft | 1 | 0 |
| 3BHK | 74.5 sq m · 802 sq ft | 31 | 0 |
| Office space | 15.5 sq m · 167 sq ft | 1 | 0 |
| Office space | 15.51 sq m · 167 sq ft | 1 | 0 |
| Office space | 19.35 sq m · 208 sq ft | 3 | 0 |
| Office space | 19.67 sq m · 212 sq ft | 1 | 0 |
| Office space | 25.88 sq m · 279 sq ft | 1 | 0 |
Show all 18 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Office space | 52.87 sq m · 569 sq ft | 1 | 0 |
| Office space | 83.34 sq m · 897 sq ft | 1 | 0 |
| Office space | 86.51 sq m · 931 sq ft | 1 | 0 |
| Office space | 91.48 sq m · 985 sq ft | 1 | 0 |
| Shop | 20.76 sq m · 223 sq ft | 2 | 1 |
| Shop | 25.73 sq m · 277 sq ft | 1 | 0 |
| Shop | 25.95 sq m · 279 sq ft | 4 | 0 |
| Shop | 26.38 sq m · 284 sq ft | 1 | 0 |
| Shop | 27.84 sq m · 300 sq ft | 1 | 0 |
| Theatre | 289.88 sq m · 3,120 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
1 document held by Deedo, 131 filings listed on MahaRERA's project page
Finance
- PAN Card1 PAN Card.pdf · uploaded 29 May 2023Source
Legal
Migrated
- 1 PAN Card1 PAN Card.pdf · uploaded 29 May 2023Source
- 1 Copy of the legal title report2 TITLE CERTIFICATE.pdf · uploaded 29 May 2023Source
- 1 a Details of encumbrances concerned to Finance3 a Details of encumbrances concerned to Finance.pdf · uploaded 29 May 2023Source
- 2 a Details of encumbrances concerned to Finance4 b Details of encumbrances concerned to Legal.pdf · uploaded 29 May 2023Source
Show all 132 documentsShow fewer documents
Migrated
- 1 b Details of encumbrances concerned to Legal3 a Details of encumbrances concerned to Finance.pdf · uploaded 29 May 2023Source
- 2 b Details of encumbrances concerned to Legal4 b Details of encumbrances concerned to Legal.pdf · uploaded 29 May 2023Source
- 1 Copy of Layout Approval (in case of layout)Original File (1).pdf · uploaded 29 May 2023Source
- 1 Building Plan Approval / NA Order for plotted development6 Building Plan Approval- 1.pdf · uploaded 29 May 2023Source
- 2 Building Plan Approval / NA Order for plotted development6 Building Plan Approval- 2.pdf · uploaded 29 May 2023Source
- 1 Commencement Certificates / NA Order for plotted development7 Commencement Certificates NA Order for plotted development _compressed.pdf · uploaded 29 May 2023Source
- 1 Declaration about Commencement Certificate1 Declaration about Commencement Certificate (1).pdf · uploaded 29 May 2023Source
- 1 Declaration in FORM B9 Declaration in FORM B.pdf · uploaded 29 May 2023Source
- 1 CERSAI details12 CERSAI details.pdf · uploaded 29 May 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 29 May 2023Source
- 1 Disclosure of Interest in Other Real Estate Organizations14 Disclosure of Interest in Other Real Estate Organizations .pdf · uploaded 29 May 2023Source
- 1 Proforma of Agreement for sale15 Proforma of Agreement for sale .pdf · uploaded 29 May 2023Source
- 1 Proforma of Allotment letter16 Proforma of Allotment letter .pdf · uploaded 29 May 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the same17 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the same.pdf · uploaded 29 May 2023Source
- 1 Deviation Report with respect to Allotment letter18 Deviation Report with respect to Allotment letter.pdf · uploaded 29 May 2023Source
- 1 Deviation Report with respect to model copy of Agreement19 Deviation Report with respect to Agreement for sale.pdf · uploaded 29 May 2023Source
- 2 Copy of Layout Approval (in case of layout)plan_rotated (2)-1.pdf · uploaded 28 Sep 2023Source
- 3 Copy of Layout Approval (in case of layout)plan_rotated (2)-2.pdf · uploaded 28 Sep 2023Source
- 3 Building Plan Approval / NA Order for plotted developmentplan_rotated (2)-3.pdf · uploaded 28 Sep 2023Source
- 4 Building Plan Approval / NA Order for plotted developmentplan_rotated (2)-4.pdf · uploaded 28 Sep 2023Source
- 5 Building Plan Approval / NA Order for plotted developmentplan_rotated (2)-5.pdf · uploaded 28 Sep 2023Source
- 6 Building Plan Approval / NA Order for plotted developmentplan_rotated (2)-6.pdf · uploaded 28 Sep 2023Source
- 7 Building Plan Approval / NA Order for plotted developmentplan_rotated (2)-7.pdf · uploaded 28 Sep 2023Source
- 8 Building Plan Approval / NA Order for plotted developmentplan_rotated (2)-8.pdf · uploaded 28 Sep 2023Source
- 9 Building Plan Approval / NA Order for plotted developmentplan_rotated (2)-9.pdf · uploaded 28 Sep 2023Source
- 2 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 28 Sep 2023Source
- 3 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 28 Sep 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1-SAI NAMAH_SEP 23.pdf · uploaded 19 Oct 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2-SAI NAMAH_SEP 23.pdf · uploaded 19 Oct 2023Source
- 1 Disclosure of sold/ booked inventorySOLD UNSOLD-SAI NAMAH_SEP 23.pdf · uploaded 19 Oct 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3-SAI NAMAH_SEP 23_compressed.pdf · uploaded 19 Oct 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1-SAI NAMAH_DEC 23.pdf · uploaded 17 Feb 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2-SAI NAMAH_DEC 23.pdf · uploaded 17 Feb 2024Source
- 2 Disclosure of sold/ booked inventorySOLD UNSOLD-SAI NAMAH_DEC 23.pdf · uploaded 17 Feb 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3-SAI NAMAH_DEC 23.pdf · uploaded 17 Feb 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)FORM 2A DE.pdf · uploaded 12 Mar 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)FORM 2A DE.pdf · uploaded 12 Mar 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)FORM 2A DE.pdf · uploaded 12 Mar 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM 2A DE.pdf · uploaded 12 Mar 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)Document15.pdf · uploaded 12 Mar 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Document15.pdf · uploaded 12 Mar 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Document15.pdf · uploaded 12 Mar 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Document15.pdf · uploaded 12 Mar 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Document15.pdf · uploaded 12 Mar 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Document15.pdf · uploaded 12 Mar 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1_ SEP 23.pdf · uploaded 3 Feb 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1-SAI NAMAH_DEC 23.pdf · uploaded 3 Feb 2025Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1_ MARCH 24.pdf · uploaded 3 Feb 2025Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1_ JUNE 24.pdf · uploaded 3 Feb 2025Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1_ SEP 24.pdf · uploaded 3 Feb 2025Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1_ DEC 24.pdf · uploaded 3 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1_ JUNE 23.pdf · uploaded 3 Feb 2025Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3-SAI NAMAH_DEC 23.pdf · uploaded 3 Feb 2025Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3_ DEC 24.pdf · uploaded 3 Feb 2025Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3_ SEP 24.pdf · uploaded 3 Feb 2025Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3_ JUNE 24.pdf · uploaded 3 Feb 2025Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3_ MARCH 24.pdf · uploaded 3 Feb 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3_ SEP 23.pdf · uploaded 3 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3_ JUNE 23.pdf · uploaded 3 Feb 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2_ SEP 23.pdf · uploaded 3 Feb 2025Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2_ DEC 24.pdf · uploaded 3 Feb 2025Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2_ SEP 24.pdf · uploaded 3 Feb 2025Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2_ JUNE 24.pdf · uploaded 3 Feb 2025Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2_ MARCH 24.pdf · uploaded 3 Feb 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2-SAI NAMAH_DEC 23.pdf · uploaded 3 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2_ JUNE 23.pdf · uploaded 3 Feb 2025Source
- 1 Disclosure of sold/ booked inventorySOLD UNSOLD_ JUNE 23.pdf · uploaded 3 Feb 2025Source
- 2 Disclosure of sold/ booked inventorySOLD UNSOLD_ SEP 23.pdf · uploaded 3 Feb 2025Source
- 3 Disclosure of sold/ booked inventorySOLD UNSOLD-SAI NAMAH_DEC 23.pdf · uploaded 3 Feb 2025Source
- 4 Disclosure of sold/ booked inventorySOLD UNSOLD_ MARCH 24.pdf · uploaded 3 Feb 2025Source
- 5 Disclosure of sold/ booked inventorySOLD UNSOLD_ JUNE 24.pdf · uploaded 3 Feb 2025Source
- 6 Disclosure of sold/ booked inventorySOLD UNSOLD_ SEP 24.pdf · uploaded 3 Feb 2025Source
- 7 Disclosure of sold/ booked inventorySOLD UNSOLD_ DEC 24.pdf · uploaded 3 Feb 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A_ MARCH 24.pdf · uploaded 3 Feb 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5_ MARCH 24.pdf · uploaded 3 Feb 2025Source
- Form 1FORM 1_ MARCH 25_ SAI NAMAH.pdf · uploaded 3 Oct 2025Source
- Form 2FORM 2_ MARCH 25_ SAI NAMAH.pdf · uploaded 3 Oct 2025Source
- Form 3FORM 3_ MARCH 25_ SAI NAMAH.pdf · uploaded 3 Oct 2025Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD_ MARCH 25_ SAI NAMAH.pdf · uploaded 3 Oct 2025Source
- Form 1FORM 1_ SEP 25_ SAI NAMAH.pdf · uploaded 16 Oct 2025Source
- Form 2FORM 2_ SEP 25_ SAI NAMAH.pdf · uploaded 16 Oct 2025Source
- Form 3FORM 3_ SEP 25_ SAI NAMAH.pdf · uploaded 16 Oct 2025Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD_ SEP 25_ SAI NAMAH.pdf · uploaded 16 Oct 2025Source
- Form 1FORM 1_ DEC 25_ SAI NAMAH.pdf · uploaded 11 Feb 2026Source
- Form 2FORM 2_ DEC 25_ SAI NAMAH.pdf · uploaded 11 Feb 2026Source
- Form 3FORM 3_ DEC 25_ SAI NAMAH.pdf · uploaded 11 Feb 2026Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD_ DEC 25_ SAI NAMAH.pdf · uploaded 11 Feb 2026Source
- Form 1FORM 1_ MARCH 26_ SAI NAMAH.pdf · uploaded 29 Apr 2026Source
- Form 2FORM 2_ MARCH 26_ SAI NAMAH.pdf · uploaded 29 Apr 2026Source
- Form 3FORM 3_ MARCH 26_ SAI NAMAH.pdf · uploaded 29 Apr 2026Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD_ MARCH 26_ SAI NAMAH.pdf · uploaded 29 Apr 2026Source
- Form 1FORM 1_ JUNE 26_ SAI NAMAH.pdf · uploaded 12 Aug 2026Source
- Form 2FORM 2_ JUNE 26_ SAI NAMAH.pdf · uploaded 12 Aug 2026Source
- Form 3FORM 3_ JUNE 26_ SAI NAMAH.pdf · uploaded 12 Aug 2026Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD_ JUNE 26_ SAI NAMAH.pdf · uploaded 12 Aug 2026Source
- Form 5 (FY 2024-2025)FORM 5_ MARCH 25_ SAI NAMAH.pdf · uploaded 12 Aug 2026Source
Technical
- DocumentOriginal File (1).pdf · uploaded 29 May 2023Source
- Document6 Building Plan Approval- 1.pdf · uploaded 29 May 2023Source
- Document6 Building Plan Approval- 2.pdf · uploaded 29 May 2023Source
- Documentplan_rotated (2)-1.pdf · uploaded 28 Sep 2023Source
- Documentplan_rotated (2)-2.pdf · uploaded 28 Sep 2023Source
- Documentplan_rotated (2)-3.pdf · uploaded 28 Sep 2023Source
- Documentplan_rotated (2)-4.pdf · uploaded 28 Sep 2023Source
- Documentplan_rotated (2)-5.pdf · uploaded 28 Sep 2023Source
- Documentplan_rotated (2)-6.pdf · uploaded 28 Sep 2023Source
- Documentplan_rotated (2)-7.pdf · uploaded 28 Sep 2023Source
- Documentplan_rotated (2)-8.pdf · uploaded 28 Sep 2023Source
- Documentplan_rotated (2)-9.pdf · uploaded 28 Sep 2023Source
Technical (Architect)
- DocumentFORM 1-SAI NAMAH_DEC 23.pdf · uploaded 17 Feb 2024Source
- DocumentFORM 1_ JUNE 23.pdf · uploaded 3 Feb 2025Source
- DocumentFORM 1_ SEP 23.pdf · uploaded 3 Feb 2025Source
- DocumentFORM 1-SAI NAMAH_DEC 23.pdf · uploaded 3 Feb 2025Source
- DocumentFORM 1_ MARCH 24.pdf · uploaded 3 Feb 2025Source
- DocumentFORM 1_ JUNE 24.pdf · uploaded 3 Feb 2025Source
- DocumentFORM 1_ SEP 24.pdf · uploaded 3 Feb 2025Source
- DocumentFORM 1_ DEC 24.pdf · uploaded 3 Feb 2025Source
Technical (Engineer)
- DocumentFORM 2-SAI NAMAH_DEC 23.pdf · uploaded 17 Feb 2024Source
- DocumentFORM 2_ JUNE 23.pdf · uploaded 3 Feb 2025Source
- DocumentFORM 2_ SEP 23.pdf · uploaded 3 Feb 2025Source
- DocumentFORM 2-SAI NAMAH_DEC 23.pdf · uploaded 3 Feb 2025Source
- DocumentFORM 2_ MARCH 24.pdf · uploaded 3 Feb 2025Source
- DocumentFORM 2_ JUNE 24.pdf · uploaded 3 Feb 2025Source
- DocumentFORM 2_ SEP 24.pdf · uploaded 3 Feb 2025Source
- DocumentFORM 2_ DEC 24.pdf · uploaded 3 Feb 2025Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Panvel, Panvel taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- 13 Mtrs Wide Road
- South
- Final Plot No-224-A
- East
- Final Plot No-224-A
- West
- Final Plot No-225-1
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Ar Swapnil Kalyankar | — |
| Chartered accountant | Ca Vishal Moole | — |
| Engineer | Ram V Marathe | — |
Source: MahaRERA project page. Contact details are not shown.