Tulsi Kailash

Certificate Signed

New Panvel, Raigarh 410206 |Promoter: Mdl Kailash Chs Ltd

22 Apr 2019Registered with MahaRERA
31 Dec 2028Promised completion
30 Apr 2029Revised completionPushed back 4 months
1Building
48Units registered0 booked (0%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Buildings
1
Unit types
2BHK, 3BHK48 units in all
Address
Plot No. 03 Sub Plot C, Takka Road, New Panvel (West)PIN 410206
Developed in phases
No

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 4 months

Registered
22 Apr 2019
Promised
31 Dec 2028
Revised
30 Apr 2029

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5200002054722 Apr 201931 Dec 202830 Apr 2029Mdl Kailash Chs LtdProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Tulsi Kailash948

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 of 48 units booked (0%), as the promoter reported to MahaRERA

2BHK · 46 units3BHK · 2 units
TypeCarpet areaUnitsBooked
2BHK57.88 sq m · 623 sq ft150
2BHK59.36 sq m · 639 sq ft10
2BHK59.83 sq m · 644 sq ft150
2BHK59.92 sq m · 645 sq ft150
3BHK79.71 sq m · 858 sq ft20

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 127 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardMDL Kailash Pan.pdf · uploaded 10 Apr 2019Source

Legal

  • Legal Title reportTitle Certificate.pdf · uploaded 14 Mar 2019Source
  • Declaration Form BForm B_Affidavit Cum Undertaking.pdf · uploaded 25 Mar 2019Source

Migrated

  • 1 Copy of the legal title reportTitle Certificate.pdf · uploaded 14 Mar 2019Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencement Certficate.pdf · uploaded 14 Mar 2019Source
  • 1 Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 15 Mar 2019Source
  • 1 Building Plan Approval (IOD)Ground Floor.pdf · uploaded 15 Mar 2019Source
Show all 128 documentsShow fewer documents

Migrated

  • 2 Building Plan Approval (IOD)First Floor.pdf · uploaded 15 Mar 2019Source
  • 3 Building Plan Approval (IOD)2nd to 9th Floor.pdf · uploaded 15 Mar 2019Source
  • 4 Building Plan Approval (IOD)Section.pdf · uploaded 15 Mar 2019Source
  • 5 Building Plan Approval (IOD)Side Elevation.pdf · uploaded 15 Mar 2019Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1_Architect Certificate.pdf · uploaded 15 Mar 2019Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate.pdf · uploaded 15 Mar 2019Source
  • 1 Details of encumbrancesNo Encumbrance Letter.pdf · uploaded 25 Mar 2019Source
  • 1 Declaration in FORM BForm B_Affidavit Cum Undertaking.pdf · uploaded 25 Mar 2019Source
  • 1 Proforma of Allotment letterRERA - Letter of Allotment.pdf · uploaded 8 Apr 2019Source
  • 2 Proforma of Allotment letterRERA - Agreement for Sale.pdf · uploaded 8 Apr 2019Source
  • 1 PAN CardMDL Kailash Pan.pdf · uploaded 10 Apr 2019Source
  • 1 Certificates of CA (Form 3)CA CERTIFICATE.pdf · uploaded 16 Apr 2019Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 Architect Certificate 31-03-2020.pdf · uploaded 6 Jan 2023Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 Engineer Certificate 31-3-20.pdf · uploaded 6 Jan 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)FORM 2A Engineer Certificate for Quality Assurance 19-20.pdf · uploaded 6 Jan 2023Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 Architect Certificate 31-03-2021.pdf · uploaded 13 Jan 2023Source
  • 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 Architect Certificate 31-03-2022.pdf · uploaded 13 Jan 2023Source
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 Engineer Certificate 31-3-21.pdf · uploaded 13 Jan 2023Source
  • 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 Engineer Certificate 31-3-22_Uploaded.pdf · uploaded 13 Jan 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)FORM 2A Engineer Certificate for Quality Assurance 20-21_Uploaded.pdf · uploaded 13 Jan 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)FORM 2A Engineer Certificate for Quality Assurance 21-22.pdf · uploaded 13 Jan 2023Source
  • 2 Certificates of CA (Form 3)Form 3 - CA Shashank March 2020_Uploaded.pdf · uploaded 13 Jan 2023Source
  • 3 Certificates of CA (Form 3)Form 3 - CA Shashank March 2021_Uploaded.pdf · uploaded 13 Jan 2023Source
  • 4 Certificates of CA (Form 3)Form 3 - CA Shashank March 2022_Uploaded.pdf · uploaded 13 Jan 2023Source
  • 2 a Details of encumbrances concerned to FinanceSelf Declaration Encrumbrance for Legal.pdf · uploaded 26 Jan 2023Source
  • 3 a Details of encumbrances concerned to FinanceSelf Declaration Encrumbrance for Finance.pdf · uploaded 26 Jan 2023Source
  • 1 b Details of encumbrances concerned to LegalSelf Declaration Encrumbrance for Legal.pdf · uploaded 26 Jan 2023Source
  • 2 b Details of encumbrances concerned to LegalSelf Declaration Encrumbrance for Finance.pdf · uploaded 26 Jan 2023Source
  • 1 Declaration about Commencement CertificateDeclaration of Commencement Certitificate.pdf · uploaded 26 Jan 2023Source
  • 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 Architect Certificate 30-06-2022.pdf · uploaded 26 Jan 2023Source
  • 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 Architect Certificate 30-09-2022.pdf · uploaded 26 Jan 2023Source
  • 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 Engineer Certificate 30-6-22_Uploaded.pdf · uploaded 26 Jan 2023Source
  • 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 Engineer Certificate 30-9-22_Uploaded.pdf · uploaded 26 Jan 2023Source
  • 5 Certificates of CA (Form 3)CA Form-3_Tulsi Kailash_Q1_Uploaded.pdf · uploaded 26 Jan 2023Source
  • 6 Certificates of CA (Form 3)CA Form-3_Tulsi Kailash_Q2_Uploaded.pdf · uploaded 26 Jan 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form-5_Tulsi Kailash_19-20.pdf · uploaded 26 Jan 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form-5_Tulsi Kailash_20-21.pdf · uploaded 26 Jan 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form-5_Tulsi Kailash_21-22.pdf · uploaded 26 Jan 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration of Separate Bank Account.pdf · uploaded 26 Jan 2023Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 31 MAR 23.pdf · uploaded 5 Mar 2025Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 3O JUNE 23.pdf · uploaded 5 Mar 2025Source
  • 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 3O SEP 23.pdf · uploaded 5 Mar 2025Source
  • 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 3O DEC 23.pdf · uploaded 5 Mar 2025Source
  • 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 3O MAR 24.pdf · uploaded 5 Mar 2025Source
  • 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 3O JUNE 24.pdf · uploaded 5 Mar 2025Source
  • 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 3O SEPT 24.pdf · uploaded 5 Mar 2025Source
  • 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 3O DEC 24.pdf · uploaded 5 Mar 2025Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 31 DEC 2022.pdf · uploaded 5 Mar 2025Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 31 MAR 23.pdf · uploaded 5 Mar 2025Source
  • 9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 31 MAR 24.pdf · uploaded 5 Mar 2025Source
  • 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 30 SEP 24.pdf · uploaded 5 Mar 2025Source
  • 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 30 JUNE 24.pdf · uploaded 5 Mar 2025Source
  • 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 31 MAR 24.pdf · uploaded 5 Mar 2025Source
  • 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 31 DEC 23.pdf · uploaded 5 Mar 2025Source
  • 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 30 SEP 23.pdf · uploaded 5 Mar 2025Source
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 30 JUNE 23.pdf · uploaded 5 Mar 2025Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 31 DEC 22.pdf · uploaded 5 Mar 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form-2A 2023.pdf · uploaded 5 Mar 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form-2A 2024.pdf · uploaded 5 Mar 2025Source
  • 1 Certificates of CA (Form 3)Form 3 - 31122022.pdf · uploaded 6 Mar 2025Source
  • 2 Certificates of CA (Form 3)Form 3 -31032023.pdf · uploaded 6 Mar 2025Source
  • 3 Certificates of CA (Form 3)Form 3 - 30062023.pdf · uploaded 6 Mar 2025Source
  • 4 Certificates of CA (Form 3)FORM 3 30 SEP 23.pdf · uploaded 6 Mar 2025Source
  • 5 Certificates of CA (Form 3)FORM 3 31 DEC 23.pdf · uploaded 6 Mar 2025Source
  • 6 Certificates of CA (Form 3)FORM 3 31 MAR 24.pdf · uploaded 6 Mar 2025Source
  • 7 Certificates of CA (Form 3)FORM 3 30 JUNE 24.pdf · uploaded 6 Mar 2025Source
  • 8 Certificates of CA (Form 3)FORM 3 30 SEP 24.pdf · uploaded 6 Mar 2025Source
  • 9 Certificates of CA (Form 3)FORM 3 31 DEC 24.pdf · uploaded 6 Mar 2025Source
  • Form 5 (FY 2024-2025)System Generated Form -5 FY 24-25 Signed.pdf · uploaded 6 Oct 2025Source
  • Withdrawal Update Form 1Form 1 of 3032025.pdf · uploaded 30 Oct 2025Source
  • Withdrawal Update Form 1Form 1 of 3062025 MDL.pdf · uploaded 30 Oct 2025Source
  • Withdrawal Update Form 1Form 1 of 30092025 MDL.pdf · uploaded 30 Oct 2025Source
  • Withdrawal Update Form 1Form 1 of 30092025 MDL.pdf · uploaded 30 Oct 2025Source
  • Withdrawal Update Form 2Form 2 of 31032025.pdf · uploaded 30 Oct 2025Source
  • Withdrawal Update Form 2Form 2 of 3062025 MDL.pdf · uploaded 30 Oct 2025Source
  • Withdrawal Update Form 2Form 2 of 30092025 MDL.pdf · uploaded 30 Oct 2025Source
  • Withdrawal Update Form 2Form 2 of 30092025 MDL.pdf · uploaded 30 Oct 2025Source
  • Withdrawal Update Form 3Form 3 of 31032025.pdf · uploaded 30 Oct 2025Source
  • Withdrawal Update Form 3Form 3 of 30062025 MDL.pdf · uploaded 30 Oct 2025Source
  • Withdrawal Update Form 3Form 3 of 30062025 MDL.pdf · uploaded 30 Oct 2025Source
  • Withdrawal Update Form 3Form 3 of 30092025 MDL.pdf · uploaded 30 Oct 2025Source
  • Form 2A (FY 2024-2025)Form 2A MDL KAilash FY 24-25 to be uploaded.pdf · uploaded 10 Nov 2025Source
  • Form 5 (FY 2022-2023)MAHA RERA FORM 5 FY 22-23 Signed.pdf · uploaded 10 Dec 2025Source
  • Form 5 (FY 2023-2024)MAHA RERA FORM 5 FY 23-24 Signed.pdf · uploaded 10 Dec 2025Source
  • Withdrawal Update Form 1Form 1 31122025.pdf · uploaded 12 Jan 2026Source
  • Withdrawal Update Form 2Form 2 31122025.pdf · uploaded 12 Jan 2026Source
  • Withdrawal Update Form 3Form 3 31122025.pdf · uploaded 12 Jan 2026Source
  • Withdrawal Update Form 1Form 1 of Tulsi 31032026 SIGNED_Uploaded.pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 2Form 2 of Tulsi 31032026 SIGNED_Uploaded.pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 3Form 3 of Tulsi 31032026 SIGNED_Uploaded.pdf · uploaded 20 Apr 2026Source
  • Form 2A (FY 2025-2026)FORM 2A 2025 - 2026.pdf · uploaded 4 Jun 2026Source
  • Withdrawal Update Form 1FORM 1 Architect Certificate 30062026.pdf · uploaded 13 Jul 2026Source
  • Withdrawal Update Form 2FORM 2 Engineer Certificate 30062026.pdf · uploaded 13 Jul 2026Source
  • Withdrawal Update Form 3FORM 3 CA Certificate 30062026-compressed.pdf · uploaded 13 Jul 2026Source

Technical

  • DocumentLayout.pdf · uploaded 15 Mar 2019Source
  • DocumentGround Floor.pdf · uploaded 15 Mar 2019Source
  • DocumentFirst Floor.pdf · uploaded 15 Mar 2019Source
  • Document2nd to 9th Floor.pdf · uploaded 15 Mar 2019Source
  • DocumentSection.pdf · uploaded 15 Mar 2019Source
  • DocumentSide Elevation.pdf · uploaded 15 Mar 2019Source

Technical (Architect)

  • DocumentFORM 1 31 DEC 2022.pdf · uploaded 5 Mar 2025Source
  • DocumentFORM 1 31 MAR 23.pdf · uploaded 5 Mar 2025Source
  • DocumentFORM 1 3O JUNE 23.pdf · uploaded 5 Mar 2025Source
  • DocumentFORM 1 3O SEP 23.pdf · uploaded 5 Mar 2025Source
  • DocumentFORM 1 3O DEC 23.pdf · uploaded 5 Mar 2025Source
  • DocumentFORM 1 3O MAR 24.pdf · uploaded 5 Mar 2025Source
  • DocumentFORM 1 3O JUNE 24.pdf · uploaded 5 Mar 2025Source
  • DocumentFORM 1 3O SEPT 24.pdf · uploaded 5 Mar 2025Source
  • DocumentFORM 1 3O DEC 24.pdf · uploaded 5 Mar 2025Source
  • DocumentFORM 1 Architect Certificate 30062026.pdf · uploaded 13 Jul 2026Source

Technical (Engineer)

  • DocumentFORM 2 31 DEC 22.pdf · uploaded 5 Mar 2025Source
  • DocumentFORM 2 31 MAR 23.pdf · uploaded 5 Mar 2025Source
  • DocumentFORM 2 30 JUNE 23.pdf · uploaded 5 Mar 2025Source
  • DocumentFORM 2 30 SEP 23.pdf · uploaded 5 Mar 2025Source
  • DocumentFORM 2 31 DEC 23.pdf · uploaded 5 Mar 2025Source
  • DocumentFORM 2 31 MAR 24.pdf · uploaded 5 Mar 2025Source
  • DocumentFORM 2 30 JUNE 24.pdf · uploaded 5 Mar 2025Source
  • DocumentFORM 2 30 SEP 24.pdf · uploaded 5 Mar 2025Source
  • DocumentFORM 2 31 MAR 24.pdf · uploaded 5 Mar 2025Source
  • DocumentFORM 2 Engineer Certificate 30062026.pdf · uploaded 13 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In New Panvel, Panvel taluka

Survey, CTS, gat or plot numbers

PLOT NO. 03 SUB PLOT C

Boundaries

North
3 Meter Wide Road
South
Sub Plot B
East
9 Meter Wide Road
West
Boundary Of Sub Plot B And Rg

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSoyuz Talib Architects Pvt Ltd—
Chartered accountantAshok R Shetty—
Chartered accountantRamesh Shetty and Co—
Chartered accountantRAV & Co—
Chartered accountantShashank Rajendra Jain—
EngineerNitin Vaidya—
EngineerR C Tipnis—
OtherShashank R Jain & Associates—

Source: MahaRERA project page. Contact details are not shown.