Skip to content
Deedo home
Menu

Arihant 6 Anaika

Certificate Signed

Koyana Velhe, Raigarh 410208 |Promoter: Arihant Enterprises

Residential / Group HousingRERAP52000031132
5 Oct 2021Registered with MahaRERA
31 Dec 2027Promised completion
2Buildings
267Units registered246 booked (92%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Buildings
2
Unit types
1BHK, 2BHK267 units in all
Address
33/1A, Raigarh, PanvelPIN 410208
Designated bank account
85
Developed in phases
Yes

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2027

Registered
5 Oct 2021
Promised
31 Dec 2027

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P520000311325 Oct 202131 Dec 202731 Dec 2027Arihant EnterprisesProject page

2 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
U13127
V13140

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

246 of 267 units booked (92%), as the promoter reported to MahaRERA

1BHK · 111 units2BHK · 156 units
BuildingTypeCarpet areaUnitsBooked
U1BHK32.15 sq m · 346 sq ft4949
U2BHK47.69 sq m · 513 sq ft7863
V1BHK32.15 sq m · 346 sq ft6262
V2BHK47.69 sq m · 513 sq ft7872

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 143 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardArihant Enterprises_PAN Card.pdf · uploaded 21 Sep 2021Source

Legal

  • Legal Title reportTitle Certificate Anaika 6_RERA.pdf · uploaded 23 Sep 2021Source
  • Declaration Form BAffidavit by Promoters_Form B_6Anaika_RERA.pdf · uploaded 24 Sep 2021Source
  • Others6 Anaika_Disclosure of sold unsold units_30092025.pdf · uploaded 24 Oct 2025Source
  • Declaration Form B6 Anaika_ 7-12.PDF · uploaded 27 Jan 2026Source
  • Declaration Form B6 Anaika_Sale Deed 46_1 Guntha.pdf · uploaded 27 Jan 2026Source
  • Declaration Form B6 Anaika_Sale Deed 16_0 Guntha.pdf · uploaded 27 Jan 2026Source
Show all 144 documentsShow fewer documents

Migrated

  • 1 PAN CardArihant Enterprises_PAN Card.pdf · uploaded 21 Sep 2021Source
  • 1 Copy of Layout Approval (in case of layout)Layout Plan_Arihant 6 Anaika.pdf · uploaded 21 Sep 2021Source
  • 1 Building Plan Approval / NA Order for plotted developmentBuilding Plan_Arihant 6 Anaika_1.pdf · uploaded 21 Sep 2021Source
  • 2 Building Plan Approval / NA Order for plotted developmentBuilding Plan_Arihant 6 Anaika_2.pdf · uploaded 21 Sep 2021Source
  • 3 Building Plan Approval / NA Order for plotted developmentBuilding Plan_Arihant 6 Anaika_3.pdf · uploaded 21 Sep 2021Source
  • 1 Commencement Certificates / NA Order for plotted developmentARIHANT 6 ANAIKA CC 09-09-2021.pdf · uploaded 21 Sep 2021Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2_6 Anaika_RERA.pdf · uploaded 21 Sep 2021Source
  • 1 Copy of the legal title reportTitle Certificate Anaika 6_RERA.pdf · uploaded 23 Sep 2021Source
  • 1 Details of encumbrancesDeclaration for Encumbrances_6Anaika123.pdf · uploaded 23 Sep 2021Source
  • 1 Declaration about Commencement CertificateDeclaration for Commencement Certificate_6Anaika.pdf · uploaded 23 Sep 2021Source
  • 1 Proforma of Allotment letterDraft Agreement for Sale_6Anaika Final Approved Draft.pdf · uploaded 23 Sep 2021Source
  • 2 Proforma of Allotment letterPerforma of the allotement letter_6 Anaika.pdf · uploaded 23 Sep 2021Source
  • 1 Declaration in FORM BAffidavit by Promoters_Form B_6Anaika_RERA.pdf · uploaded 24 Sep 2021Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_6 Anaika_RERA.pdf · uploaded 24 Sep 2021Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_6 Anaika.pdf · uploaded 25 Sep 2021Source
  • 4 Building Plan Approval / NA Order for plotted development3.pdf · uploaded 4 Jan 2022Source
  • 5 Building Plan Approval / NA Order for plotted development4_compressed.pdf · uploaded 4 Jan 2022Source
  • 6 Building Plan Approval / NA Order for plotted development5.pdf · uploaded 4 Jan 2022Source
  • 7 Building Plan Approval / NA Order for plotted development6.pdf · uploaded 4 Jan 2022Source
  • 8 Building Plan Approval / NA Order for plotted development7.pdf · uploaded 4 Jan 2022Source
  • 2 Commencement Certificates / NA Order for plotted developmentARIHANT 6 ANAIKA CC NEW 14 FLOOR.pdf · uploaded 4 Jan 2022Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_6 Anaika for updation.pdf · uploaded 4 Jan 2022Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)6 ANAIKA FORM 1 21 DEC 2021.PDF · uploaded 2 Mar 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)6 ANAIKA FORM 1 30 JUNE 2022.PDF · uploaded 2 Mar 2023Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)6 ANAIKA FORM 1 30 SEPTEMBER 2022.PDF · uploaded 2 Mar 2023Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)6 ANAIKA FORM 1 31 DEC 2021.PDF · uploaded 2 Mar 2023Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)6 ANAIKA FORM 1 31 DEC 2022.PDF · uploaded 2 Mar 2023Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)6 ANAIKA FORM 1 31 MARCH 2022.PDF · uploaded 2 Mar 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)6 ANAIKA FORM 1 31 DEC 2021.PDF · uploaded 2 Mar 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM2 RERA 6ANAIKA 211221.PDF · uploaded 2 Mar 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM2 RERA 6ANAIKA 300622.PDF · uploaded 2 Mar 2023Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM2 RERA 6ANAIKA 300922.PDF · uploaded 2 Mar 2023Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM2 RERA 6ANAIKA 310322.PDF · uploaded 2 Mar 2023Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM2 RERA 6ANAIKA 311221.PDF · uploaded 2 Mar 2023Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM2 RERA 6ANAIKA 311222.PDF · uploaded 2 Mar 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)6 ANAIKA FORM 1 21 DEC 2021.PDF · uploaded 2 Mar 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)6 ANAIKA FORM 1 30 JUNE 2022.PDF · uploaded 2 Mar 2023Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)6 ANAIKA FORM 1 30 SEPTEMBER 2022.PDF · uploaded 2 Mar 2023Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)6 ANAIKA FORM 1 31 DEC 2021.PDF · uploaded 2 Mar 2023Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)6 ANAIKA FORM 1 31 DEC 2022.PDF · uploaded 2 Mar 2023Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)6 ANAIKA FORM 1 31 MARCH 2022.PDF · uploaded 2 Mar 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)6 Anaika_Form 5_2021-22[46401].pdf · uploaded 6 Mar 2023Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)6Anaika_11zon.pdf · uploaded 20 Apr 2023Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)06 ANAIKA -FORM 1 - 31 MARCH 23.PDF · uploaded 21 Apr 2023Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)6 Anaika_31032023.PDF · uploaded 21 Apr 2023Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARIHANT 6 ANAIKA - FORM 1 - ARCHITECT CERTIFICATE 30TH JUNE 2023.PDF · uploaded 19 Jul 2023Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM2 RERA 6ANAIKA JUNE2023.PDF · uploaded 20 Jul 2023Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Anaika 6.pdf · uploaded 7 Feb 2024Source
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM I - ARCHITECT CERTIFICATE - 6 ANAIKA.PDF · uploaded 20 Apr 2024Source
  • 1 Disclosure of sold/ booked inventory6 Anaika_Disclosure of Sold Booked Inventory_31122023.pdf · uploaded 30 May 2024Source
  • 2 Disclosure of sold/ booked inventory6 Anaika_Disclosure of Sold Booked Inventory_31032024.pdf · uploaded 30 May 2024Source
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 6 Anaika 31122023 SIGNED.pdf · uploaded 3 Jun 2024Source
  • 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 6 Anaika 31032024 SIGNED.pdf · uploaded 3 Jun 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5_6 Anaika_FY 22-23.pdf · uploaded 7 Jun 2024Source
  • 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 ARIHANT 6 ANAIKA.PDF · uploaded 20 Jul 2024Source
  • 3 Disclosure of sold/ booked inventoryDisclosure signed.pdf · uploaded 20 Jul 2024Source
  • 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 30062024 Anaika6 V Signed.pdf · uploaded 20 Jul 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM 2A 6 ANAIKA FY 22-23.pdf · uploaded 23 Jul 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A 6 ANAIKA FY 23-24.pdf · uploaded 23 Jul 2024Source
  • 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 6 Anaika 30062024.pdf · uploaded 26 Jul 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM I - ARIHANT 6 ANAIKA_SIGNED.pdf · uploaded 19 Oct 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)6Anaika_SIGNED.pdf · uploaded 19 Oct 2024Source
  • 2 Disclosure of sold/ booked inventoryDISCLOSURE_SIGNED.pdf · uploaded 19 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - 6 Anaika.pdf · uploaded 21 Oct 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 6 Anaika.pdf · uploaded 7 Nov 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - 6 ANAIKA.pdf · uploaded 19 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - 6 Ananika.pdf · uploaded 19 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - 6 Anaika.pdf · uploaded 19 Jan 2025Source
  • 1 Disclosure of sold/ booked inventoryDISCLOSURE SIGNED.pdf · uploaded 19 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - 6 Anaika_310325.pdf · uploaded 18 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - 6 Anaika_310325_SIGNED.pdf · uploaded 18 Apr 2025Source
  • 1 Disclosure of sold/ booked inventoryDISCLOSURE SIGNED.pdf · uploaded 18 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2-6 Anaika_310325.pdf · uploaded 19 Apr 2025Source
  • Form 2A (FY 2024-2025)Arihant 6 Anaika.pdf · uploaded 4 Oct 2025Source
  • Form 5 (FY 2024-2025)Arihant6Anaika_Form5_FY2425.pdf · uploaded 16 Oct 2025Source
  • Withdrawal Update Form 1Form 1_6 ANAIKA_30092025.pdf · uploaded 17 Oct 2025Source
  • Withdrawal Update Form 2Form 2_6 Anaika_30092025.pdf · uploaded 17 Oct 2025Source
  • Withdrawal Update Form 3Form 3_6 ANAIKA_30092025.pdf · uploaded 17 Oct 2025Source
  • Withdrawal Update Form 1Form 1_6 ANAIKA_30092025.pdf · uploaded 24 Oct 2025Source
  • Withdrawal Update Form 2Form 2_6 Anaika_30092025.pdf · uploaded 24 Oct 2025Source
  • Withdrawal Update Form 3Form 3_6 ANAIKA_30092025.pdf · uploaded 24 Oct 2025Source
  • Withdrawal Update Form 1Form 1_6 ANAIKA_30092025.pdf · uploaded 27 Oct 2025Source
  • Withdrawal Update Form 1Form 1_6 ANAIKA_30092025.pdf · uploaded 27 Oct 2025Source
  • Withdrawal Update Form 1Form 1_6 ANAIKA_30092025.pdf · uploaded 27 Oct 2025Source
  • Withdrawal Update Form 1Form 1_6 ANAIKA_30092025.pdf · uploaded 27 Oct 2025Source
  • Withdrawal Update Form 2Form 2_6 Anaika_30092025.pdf · uploaded 27 Oct 2025Source
  • Withdrawal Update Form 2Form 2_6 Anaika_30092025.pdf · uploaded 27 Oct 2025Source
  • Withdrawal Update Form 2Form 2_6 Anaika_30092025.pdf · uploaded 27 Oct 2025Source
  • Withdrawal Update Form 2Form 2_6 Anaika_30092025.pdf · uploaded 27 Oct 2025Source
  • Withdrawal Update Form 3Form 3_6 ANAIKA_30092025.pdf · uploaded 27 Oct 2025Source
  • Withdrawal Update Form 3Form 3_6 ANAIKA_30092025.pdf · uploaded 27 Oct 2025Source
  • Withdrawal Update Form 3Form 3_6 ANAIKA_30092025.pdf · uploaded 27 Oct 2025Source
  • Withdrawal Update Form 3Form 3_6 Anaika_30092025.pdf · uploaded 27 Oct 2025Source
  • Withdrawal Update Form 1Form 1_6 Anaika_31122025.pdf · uploaded 21 Jan 2026Source
  • Withdrawal Update Form 2Form 2_6 Anaika_31122025.pdf · uploaded 21 Jan 2026Source
  • Withdrawal Update Form 3Form 3_6 Anaika_31122025.pdf · uploaded 21 Jan 2026Source
  • Withdrawal Update Form 1Form 1_6 Anaika_Jun2025.pdf · uploaded 27 Jan 2026Source
  • Withdrawal Update Form 2Form 2_6 Anaika_Jun2025.pdf · uploaded 27 Jan 2026Source
  • Withdrawal Update Form 3Form 3_6 Anaika_Jun2025.pdf · uploaded 27 Jan 2026Source
  • Withdrawal Update Form 117 Form 1_6 ANAIKA_310326.pdf · uploaded 16 Apr 2026Source
  • Withdrawal Update Form 2Form 2_6 Anaika_250326.pdf · uploaded 16 Apr 2026Source
  • Withdrawal Update Form 317 Form 3_6 Anaika_250326.pdf · uploaded 16 Apr 2026Source
  • Occupational CertificateOC Order Anaika 6.pdf · uploaded 5 May 2026Source
  • Occupational CertificateOC Approved Drawing_Anaika 6.pdf · uploaded 5 May 2026Source
  • Occupational Certificate6 Anaika_OC Verification email through town planning to RERA.pdf · uploaded 5 May 2026Source
  • Form 2A (FY 2025-2026)Form 2A_6 Anaika_FY 25-26.pdf · uploaded 6 Oct 2026Source

Technical

  • DocumentLayout Plan_Arihant 6 Anaika.pdf · uploaded 21 Sep 2021Source
  • DocumentBuilding Plan_Arihant 6 Anaika_1.pdf · uploaded 21 Sep 2021Source
  • DocumentBuilding Plan_Arihant 6 Anaika_2.pdf · uploaded 21 Sep 2021Source
  • DocumentBuilding Plan_Arihant 6 Anaika_3.pdf · uploaded 21 Sep 2021Source
  • Document3.pdf · uploaded 4 Jan 2022Source
  • Document4_compressed.pdf · uploaded 4 Jan 2022Source
  • Document5.pdf · uploaded 4 Jan 2022Source
  • Document6.pdf · uploaded 4 Jan 2022Source
  • Document7.pdf · uploaded 4 Jan 2022Source
  • Others6 Anaika-Covering Letter OC Application Inward copy Fire NOC.pdf · uploaded 14 Jun 2025Source
  • OthersForm 1_6 Anaika_30062025.pdf · uploaded 19 Jul 2025Source
  • OthersForm 2_6 Anaika_30062025.pdf · uploaded 19 Jul 2025Source
  • OthersDisclsoure_Signed.pdf · uploaded 19 Jul 2025Source
  • Others6 Anaika_Disclosure of sold unsold units_30092025.pdf · uploaded 24 Oct 2025Source
  • Document1 - 31-12-2021.pdf · uploaded 6 Nov 2025Source
  • Document2 - 7.pdf · uploaded 6 Nov 2025Source
  • Document3 - 7.pdf · uploaded 6 Nov 2025Source
  • Document4 - 7.pdf · uploaded 6 Nov 2025Source
  • Document5 - 7.pdf · uploaded 6 Nov 2025Source
  • Document6 - 7.pdf · uploaded 6 Nov 2025Source
  • Document7 - 7.pdf · uploaded 6 Nov 2025Source
  • Document1 - 31-12-2021 - Parking Highlighted.pdf · uploaded 6 Nov 2025Source

Technical (Architect)

  • DocumentFORM I - ARIHANT 6 ANAIKA_SIGNED.pdf · uploaded 19 Oct 2024Source
  • DocumentForm 1 - 6 ANAIKA.pdf · uploaded 19 Jan 2025Source
  • DocumentForm 1 - 6 Anaika_310325.pdf · uploaded 18 Apr 2025Source
  • Document17 Form 1_6 ANAIKA_310326.pdf · uploaded 16 Apr 2026Source

Technical (Engineer)

  • DocumentForm 2 - 6 Anaika.pdf · uploaded 21 Oct 2024Source
  • DocumentForm 2 - 6 Anaika.pdf · uploaded 19 Jan 2025Source
  • DocumentForm 2-6 Anaika_310325.pdf · uploaded 19 Apr 2025Source
  • DocumentForm 2_6 Anaika_250326.pdf · uploaded 16 Apr 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Koyana Velhe, Panvel taluka

Survey, CTS, gat or plot numbers

33/1A

Boundaries

North
Survey No 2 Of 33
South
Survey No 32 And Survey No 33
East
Survey No 33
West
Survey No 1a Of 32 And B

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectYogita Bhandarkar—
Chartered accountantAnjani Kumar Goyal—
EngineerKaleem Sayyad—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology