Cityopia Wing -E

Certificate Signed

Kolkhe, Raigarh 410221 |Promoter: Cityopia Ventures Private Limited

Residential / Group HousingRERAP52000027809
Compare
4 Jan 2021Registered with MahaRERA
31 Dec 2029Promised completion
1Building
32Units registered2 booked (6%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Buildings
1
Unit types
2BHK32 units in all
Address
Survey No - 69 /0, 70/1, 71/1/B, And 71/ 2, Kolkhe, PanvelPIN 410221
Designated bank account
28
Developed in phases
No

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 18.96592, 73.13565
Cityopia Wing -E is at latitude 18.96592, longitude 73.13565.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2029

Registered
4 Jan 2021
Promised
31 Dec 2029

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P520000278094 Jan 202131 Dec 202931 Dec 2029Cityopia Ventures Private LimitedProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Cityopia Wing -E132

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

2 of 32 units booked (6%), as the promoter reported to MahaRERA

2BHK · 32 units
TypeCarpet areaUnitsBooked
2BHK60 sq m · 646 sq ft80
2BHK60.62 sq m · 653 sq ft162
2BHK66.72 sq m · 718 sq ft80

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 126 filings listed on MahaRERA's project page

Extension certificate

Finance

  • PAN CardPan Card of Cityopia Ventures.pdf · uploaded 11 Dec 2020Source

Legal

  • Legal Title reportplot no -69 title and search merged.pdf · uploaded 19 Dec 2020Source
  • Legal Title reporttitle and search 70 -1 merged.pdf · uploaded 19 Dec 2020Source
  • Legal Title reporttitle and search merged 71 -1-B.pdf · uploaded 19 Dec 2020Source
  • Legal Title reportilovepdf_merged (7)_compressed.pdf · uploaded 19 Dec 2020Source
  • Declaration Form Bnotarised form b cityopia.pdf · uploaded 29 Dec 2020Source

Migrated

  • 1 PAN CardPan Card of Cityopia Ventures.pdf · uploaded 11 Dec 2020Source
Show all 127 documentsShow fewer documents

Migrated

  • 1 Commencement Certificates / NA Order for plotted developmentCC Letter.pdf · uploaded 11 Dec 2020Source
  • 1 Copy of the legal title reportplot no -69 title and search merged.pdf · uploaded 19 Dec 2020Source
  • 2 Copy of the legal title reporttitle and search 70 -1 merged.pdf · uploaded 19 Dec 2020Source
  • 3 Copy of the legal title reporttitle and search merged 71 -1-B.pdf · uploaded 19 Dec 2020Source
  • 4 Copy of the legal title reportilovepdf_merged (7)_compressed.pdf · uploaded 19 Dec 2020Source
  • 1 Details of encumbrancesCITYOPIA encumbrance.pdf · uploaded 19 Dec 2020Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Cityopia Wing E.pdf · uploaded 21 Dec 2020Source
  • 1 Proforma of Allotment letteragreement for sale_cityopia.pdf · uploaded 23 Dec 2020Source
  • 2 Proforma of Allotment letterAllotment Letter (2).pdf · uploaded 23 Dec 2020Source
  • 1 Copy of Layout Approval (in case of layout)Signed Drawings Pages-1_compressed.pdf · uploaded 29 Dec 2020Source
  • 1 Building Plan Approval / NA Order for plotted developmentSigned Drawings Pages-1_compressed.pdf · uploaded 29 Dec 2020Source
  • 2 Building Plan Approval / NA Order for plotted developmentSigned Drawings Pages-2.pdf · uploaded 29 Dec 2020Source
  • 3 Building Plan Approval / NA Order for plotted developmentSigned Drawings Pages-9.pdf · uploaded 29 Dec 2020Source
  • 4 Building Plan Approval / NA Order for plotted developmentSigned Drawings Pages-10.pdf · uploaded 29 Dec 2020Source
  • 5 Building Plan Approval / NA Order for plotted developmentSigned Drawings Pages-11.pdf · uploaded 29 Dec 2020Source
  • 6 Building Plan Approval / NA Order for plotted developmentSigned Drawings Pages-12.pdf · uploaded 29 Dec 2020Source
  • 7 Building Plan Approval / NA Order for plotted developmentSigned Drawings Pages-12.pdf · uploaded 29 Dec 2020Source
  • 1 Declaration in FORM Bnotarised form b cityopia.pdf · uploaded 29 Dec 2020Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Cityopia Wing E June 21.pdf · uploaded 29 Sep 2021Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Cityopia Wing E June 21_compressed.pdf · uploaded 29 Sep 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 Certificate 149- Cityopia.pdf · uploaded 29 Sep 2021Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Cityopia Wing E Sept 2021.pdf · uploaded 12 Nov 2021Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Cityopia Wing E Form 2- 31st December 2021.pdf · uploaded 12 May 2022Source
  • 1 CERSAI detailsCityopia Wing E.pdf · uploaded 12 May 2022Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Cityopia Wing E Form 3- 31st December 2021_11zon.pdf · uploaded 12 May 2022Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Cityopia wing E Form 3- 30th September 2021_11zon.pdf · uploaded 12 May 2022Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Cityopia Wing E - Form 2 - 31-03-2022_compressed.pdf · uploaded 23 May 2022Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Cityopia Wing E_ March 2022.pdf · uploaded 23 May 2022Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Cityopia Wing E Form 2- June 2022.pdf · uploaded 30 Aug 2022Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Cityopia Wing E June 2022.pdf · uploaded 30 Aug 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 Certificate 099.pdf · uploaded 30 Sep 2022Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Cityopia Wing E as on September 2022.pdf · uploaded 10 Dec 2022Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3- Cityopia Wing E as on September 2022.pdf · uploaded 10 Dec 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)CVPL_E wing_31032023_architects certificate.pdf · uploaded 18 Apr 2023Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 21 Apr 2023Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 21 Apr 2023Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)New format- Form 3 Cityopia Wing E Dec 2022.pdf · uploaded 21 Apr 2023Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)New format- Form 3 Cityopia Wing E March 2023.pdf · uploaded 21 Apr 2023Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Cityopia Wing E as on June 2023.pdf · uploaded 26 Jul 2023Source
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3- Cityopia Wing E as on June 2023.pdf · uploaded 26 Jul 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 as on 2022-23.pdf · uploaded 1 Sep 2023Source
  • 8 Building Plan Approval / NA Order for plotted developmentPage 1 and 2.pdf · uploaded 29 Sep 2023Source
  • 9 Building Plan Approval / NA Order for plotted developmentPage 3, 4 and 5.pdf · uploaded 29 Sep 2023Source
  • 10 Building Plan Approval / NA Order for plotted developmentPage 6, 7 and 8.pdf · uploaded 29 Sep 2023Source
  • 11 Building Plan Approval / NA Order for plotted developmentPage 9, 10 and 11.pdf · uploaded 29 Sep 2023Source
  • 12 Building Plan Approval / NA Order for plotted developmentPage 12, 13 and 14.pdf · uploaded 29 Sep 2023Source
  • 13 Building Plan Approval / NA Order for plotted developmentPage 15, 16, 17 and 18.pdf · uploaded 29 Sep 2023Source
  • 14 Building Plan Approval / NA Order for plotted developmentPage 19 and 20.pdf · uploaded 29 Sep 2023Source
  • 2 Commencement Certificates / NA Order for plotted developmentAmmended CC.pdf · uploaded 29 Sep 2023Source
  • 1 Declaration about Commencement CertificateDraft FORMAT D (32).pdf · uploaded 31 Oct 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architects Certificate Wing E Oct 2023.pdf · uploaded 31 Oct 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Draft Form 2A (FY 2020-21).pdf · uploaded 31 Oct 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Draft Form 2A (FY 2021-22).pdf · uploaded 31 Oct 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Draft Form 2A (FY 2022-23).pdf · uploaded 31 Oct 2023Source
  • 1 Disclosure of sold/ booked inventoryDraft CIRCULAR 29.pdf · uploaded 1 Nov 2023Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Cityopia Wing - E as on Sep 2023.pdf · uploaded 23 Nov 2023Source
  • 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Cityopia Wing - E as on Sep 2023.pdf · uploaded 23 Nov 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form -1 Cityopia Wing-E as on March 2023.pdf · uploaded 21 Dec 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form -1 Cityopia Wing-E as on June 2023.pdf · uploaded 21 Dec 2023Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form -1 Cityopia Wing-E as on Sept 2023.pdf · uploaded 21 Dec 2023Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form -1 Cityopia Wing-E as on Dec 2023.pdf · uploaded 16 Jan 2024Source
  • 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Cityopia Wing - E as on Dec 2023.pdf · uploaded 19 Jan 2024Source
  • 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Cityopia Wing E Dec 2023.pdf · uploaded 19 Jan 2024Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 -.pdf · uploaded 18 Apr 2024Source
  • 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Cityopia Wing - E as on March 2024.pdf · uploaded 20 Apr 2024Source
  • 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Cityopia Wing E 31 -03-2024.pdf · uploaded 20 Apr 2024Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Cityopia Wing - E as on June 2024.pdf · uploaded 17 Jul 2024Source
  • 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Cityopia Wing - E as on June 2024.pdf · uploaded 19 Jul 2024Source
  • 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Cityopia Wing E 30-06-2024.pdf · uploaded 19 Jul 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Cityopia Wing E 30-09-2024.pdf · uploaded 26 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Cityopia Wing - E as on 30-09-2024.pdf · uploaded 26 Oct 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Cityopia Wng E as on September 2024.pdf · uploaded 29 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Cityopia Wing E as on Dec 2024.pdf · uploaded 18 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Cityopia Wing E as on Dec2024.pdf · uploaded 18 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Cityopia Wing - E as on Dec 2024.pdf · uploaded 18 Jan 2025Source
  • Form 1Form 1 - Cityopia Wing - E as on June 2025.pdf · uploaded 28 Jul 2025Source
  • Form 2Form 2 - Cityopia Wing - E as on June 2025.pdf · uploaded 28 Jul 2025Source
  • Form 3Form 3 - Cityopia Wing E 30-06-2025.pdf · uploaded 28 Jul 2025Source
  • Disclosure of Sold and Booked InventoryCircular 29 - Cityopia Wing - E as on June 2025.pdf · uploaded 28 Jul 2025Source
  • Form 1Form 1 - Cityopia Wing E as on Sep 2025.pdf · uploaded 16 Oct 2025Source
  • Form 2Form 2 - Cityopia Wing E as on Sep 2025.pdf · uploaded 16 Oct 2025Source
  • Form 3Form 3 - Cityopia Wing E as on Sep 2025.pdf · uploaded 16 Oct 2025Source
  • Disclosure of Sold and Booked InventoryCircular 29 - Cityopia Wing E as on Sep 2025.pdf · uploaded 16 Oct 2025Source
  • Form 1Form 1 - Cityopia Wing E as on Dec 2025.pdf · uploaded 11 Feb 2026Source
  • Form 2Form 2 - Cityopia Wing E as on Dec 2025.pdf · uploaded 11 Feb 2026Source
  • Form 3Form 3 - Cityopia Wing E as on Dec 2025.pdf · uploaded 11 Feb 2026Source
  • Disclosure of Sold and Booked InventoryCircular 29 - Cityopia Wing E as on Dec 2025.pdf · uploaded 11 Feb 2026Source
  • Withdrawal Update Form 1Form 1 - Wing E 31 03 2026.pdf · uploaded 15 May 2026Source
  • Withdrawal Update Form 2Form - 2 Wing E 31 03 2026.pdf · uploaded 15 May 2026Source
  • Withdrawal Update Form 3Form - 3 - Wing E 31 03 2026.pdf · uploaded 15 May 2026Source
  • Form 5 (FY 2023-2024)Form 5 - Cityopia Wing - E for FY 2023-24.pdf · uploaded 5 Jun 2026Source
  • Form 5 (FY 2024-2025)Form 5 - Cityopia Wing - E for FY 2024-25.pdf · uploaded 5 Jun 2026Source
  • Withdrawal Update Form 1Form 1 - Cityopia Wing E as on June 2026.pdf · uploaded 14 Jul 2026Source
  • Withdrawal Update Form 2Form 2 - Cityopia Wing E as on June 2026.pdf · uploaded 14 Jul 2026Source
  • Withdrawal Update Form 3Form 3 - Cityopia Wing E as on June 2026.pdf · uploaded 14 Jul 2026Source
  • Withdrawal Update Form 1Form 1 - Cityopia Wing E as on June 2026.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 2Form 2 - Cityopia Wing - E-Signed.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 3Form 3 - Cityopia Wing E - 30062026Signed.pdf · uploaded 20 Jul 2026Source

Technical

  • DocumentSigned Drawings Pages-1_compressed.pdf · uploaded 29 Dec 2020Source
  • DocumentSigned Drawings Pages-1_compressed.pdf · uploaded 29 Dec 2020Source
  • DocumentSigned Drawings Pages-2.pdf · uploaded 29 Dec 2020Source
  • DocumentSigned Drawings Pages-9.pdf · uploaded 29 Dec 2020Source
  • DocumentSigned Drawings Pages-10.pdf · uploaded 29 Dec 2020Source
  • DocumentSigned Drawings Pages-11.pdf · uploaded 29 Dec 2020Source
  • DocumentSigned Drawings Pages-12.pdf · uploaded 29 Dec 2020Source
  • DocumentSigned Drawings Pages-12.pdf · uploaded 29 Dec 2020Source
  • DocumentPage 1 and 2.pdf · uploaded 29 Sep 2023Source
  • DocumentPage 3, 4 and 5.pdf · uploaded 29 Sep 2023Source
  • DocumentPage 6, 7 and 8.pdf · uploaded 29 Sep 2023Source
  • DocumentPage 9, 10 and 11.pdf · uploaded 29 Sep 2023Source
  • DocumentPage 12, 13 and 14.pdf · uploaded 29 Sep 2023Source
  • DocumentPage 15, 16, 17 and 18.pdf · uploaded 29 Sep 2023Source
  • DocumentPage 19 and 20.pdf · uploaded 29 Sep 2023Source

Technical (Architect)

  • DocumentForm 1 - Cityopia Wng E as on September 2024.pdf · uploaded 29 Oct 2024Source
  • DocumentForm 1 - Cityopia Wing E as on Dec 2024.pdf · uploaded 18 Jan 2025Source
  • DocumentForm 1 - Cityopia Wing E as on June 2026.pdf · uploaded 14 Jul 2026Source

Technical (Engineer)

  • DocumentForm 2 - Cityopia Wing - E as on 30-09-2024.pdf · uploaded 26 Oct 2024Source
  • DocumentForm 2 - Cityopia Wing - E as on Dec 2024.pdf · uploaded 18 Jan 2025Source
  • DocumentForm 2 - Cityopia Wing - E-Signed.pdf · uploaded 20 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Kolkhe, Panvel taluka

Survey, CTS, gat or plot numbers

70/171/1/B71/ 2SURVEY NO - 69 /0

Boundaries

North
Survey No-72 and Survey No-74
South
River
East
110 Kv Bhira -Dharavi No 2 High Tension Line
West
Survey No-75

Source: registration certificates and MahaRERA's project page, as stated there.