Bhaveshwar Aqua
Certificate SignedKalamboli, Raigarh 410218 |Promoter: Bhaveshwar Infratech
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- RERA registrations
- 2
- Phases
- 2
- Buildings
- 2
- Unit types
- 1BHK, 2BHK, Office space, Shop, —552 units in all
- Address
- C-7/2, Sector 12, KalamboliPIN 410218
- Designated bank account
- 76
- Developed in phases
- Yes
Location
Coordinates as published by MahaRERA
Also registered as
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 4 months
P52000045696- Registered
- 6 Jun 2022
- Promised
- 31 Dec 2026
- Revised
- 30 Apr 2027
Completion pushed back 4 months
P52000079390- Registered
- 3 Mar 2025
- Promised
- 31 Dec 2029
- Revised
- 30 Apr 2030
2 RERA registrations
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52000045696 | 6 Jun 2022 | 31 Dec 2026 | 30 Apr 2027 | Bhaveshwar Infratech | Project page |
| P52000079390 | 3 Mar 2025 | 31 Dec 2029 | 30 Apr 2030 | Bhaveshwar Infratech | Project page |
2 buildings
Buildings and wings named in the registration
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
174 of 552 units booked (32%), as the promoter reported to MahaRERA
| RERA | Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|---|
| P52000045696 | Wing A | 1BHK | 31.59 sq m · 340 sq ft | 7 | 7 |
| P52000045696 | Wing A | 2BHK | 43.8 sq m · 471 sq ft | 9 | 5 |
| P52000045696 | Wing A | 2BHK | 43.97 sq m · 473 sq ft | 10 | 7 |
| P52000045696 | Wing A | 2BHK | 50.33 sq m · 542 sq ft | 20 | 18 |
| P52000045696 | Wing A | 2BHK | 53.43 sq m · 575 sq ft | 20 | 19 |
| P52000045696 | Wing A | Office space | 242.4 sq m · 2,609 sq ft | 1 | 0 |
| P52000045696 | Wing A | Office space | 304.9 sq m · 3,282 sq ft | 1 | 0 |
| P52000045696 | Wing A | Shop | 28.96 sq m · 312 sq ft | 1 | 0 |
Show all 21 unit rowsShow fewer unit rows
| RERA | Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|---|
| P52000045696 | Wing A | Shop | 31.77 sq m · 342 sq ft | 1 | 1 |
| P52000045696 | Wing A | Shop | 33.14 sq m · 357 sq ft | 7 | 2 |
| P52000045696 | Wing A | Shop | 34.18 sq m · 368 sq ft | 1 | 0 |
| P52000045696 | Wing A | Shop | 34.95 sq m · 376 sq ft | 1 | 0 |
| P52000045696 | Wing A | Shop | 41.29 sq m · 444 sq ft | 1 | 0 |
| P52000079390 | Wing A | — | — | 184 | — |
| P52000045696 | Wing B | 1BHK | 29.83 sq m · 321 sq ft | 20 | 19 |
| P52000045696 | Wing B | 1BHK | 30.55 sq m · 329 sq ft | 10 | 5 |
| P52000045696 | Wing B | 1BHK | 31.46 sq m · 339 sq ft | 10 | 10 |
| P52000045696 | Wing B | 1BHK | 31.59 sq m · 340 sq ft | 68 | 57 |
| P52000045696 | Wing B | 1BHK | 31.75 sq m · 342 sq ft | 10 | 10 |
| P52000045696 | Wing B | 2BHK | 43.97 sq m · 473 sq ft | 20 | 14 |
| P52000079390 | Wing B | — | — | 150 | — |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
2 documents held by Deedo, 251 filings listed on MahaRERA's project page
Registration certificate (2)
Finance
Legal
- Legal Title reportP52000045696 · Title RERA.pdf · uploaded 21 May 2022Source
- Declaration Form BP52000045696 · Form B.pdf · uploaded 21 May 2022Source
- Other – LegalP52000079390 · Agreement to Lease C-7-1.pdf · uploaded 18 Jan 2025Source
- Other – LegalP52000079390 · Search Report.pdf · uploaded 18 Jan 2025Source
Show all 253 documentsShow fewer documents
Legal
Migrated
- 1 PAN CardP52000045696 · PAN.pdf · uploaded 21 May 2022Source
- 1 Copy of the legal title reportP52000045696 · Title RERA.pdf · uploaded 21 May 2022Source
- 1 Details of encumbrancesP52000045696 · encumbrance.pdf · uploaded 21 May 2022Source
- 1 Copy of Layout Approval (in case of layout)P52000045696 · Layout 1.pdf · uploaded 21 May 2022Source
- 2 Copy of Layout Approval (in case of layout)P52000045696 · Layout 2.pdf · uploaded 21 May 2022Source
- 3 Copy of Layout Approval (in case of layout)P52000045696 · Layout 3.pdf · uploaded 21 May 2022Source
- 4 Copy of Layout Approval (in case of layout)P52000045696 · Layout 4.pdf · uploaded 21 May 2022Source
- 5 Copy of Layout Approval (in case of layout)P52000045696 · Layout 5.pdf · uploaded 21 May 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentP52000045696 · CC for RERA.pdf · uploaded 21 May 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentP52000045696 · CC for RERA.pdf · uploaded 21 May 2022Source
- 1 Declaration about Commencement CertificateP52000045696 · CC Declaration.pdf · uploaded 21 May 2022Source
- 1 Declaration in FORM BP52000045696 · Form B.pdf · uploaded 21 May 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52000045696 · Form 1.pdf · uploaded 21 May 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52000045696 · Form 2.pdf · uploaded 21 May 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52000045696 · FoRM 3.pdf · uploaded 21 May 2022Source
- 1 Proforma of Allotment letterP52000045696 · Allotment Letter.pdf · uploaded 21 May 2022Source
- 2 Proforma of Allotment letterP52000045696 · Draft Agreement.pdf · uploaded 21 May 2022Source
- 1 CERSAI detailsP52000045696 · Cresai.pdf · uploaded 24 May 2022Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52000045696 · Bank Declaration Infratech.pdf · uploaded 5 Aug 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52000045696 · Form 1 30092022.pdf · uploaded 8 Oct 2022Source
- 1 Disclosure of sold/ booked inventoryP52000045696 · Sold Unsold 30092022.pdf · uploaded 8 Oct 2022Source
- 6 Copy of Layout Approval (in case of layout)P52000045696 · 1Revised Layout0512022.pdf · uploaded 7 Dec 2022Source
- 7 Copy of Layout Approval (in case of layout)P52000045696 · 2Revised Layout0512022.pdf · uploaded 7 Dec 2022Source
- 8 Copy of Layout Approval (in case of layout)P52000045696 · 3Revised Layout0512022.pdf · uploaded 7 Dec 2022Source
- 9 Copy of Layout Approval (in case of layout)P52000045696 · 4Revised Layout0512022.pdf · uploaded 7 Dec 2022Source
- 10 Copy of Layout Approval (in case of layout)P52000045696 · 5Revised Layout0512022.pdf · uploaded 7 Dec 2022Source
- 2 Building Plan Approval / NA Order for plotted developmentP52000045696 · Revised CC - 05122022.pdf · uploaded 7 Dec 2022Source
- 2 Commencement Certificates / NA Order for plotted developmentP52000045696 · Revised CC - 05122022.pdf · uploaded 7 Dec 2022Source
- 2 Declaration about Commencement CertificateP52000045696 · Declaration About CC.pdf · uploaded 7 Dec 2022Source
- 2 Disclosure of sold/ booked inventoryP52000045696 · RERA SOLD UNSOLD TILL DEC 2022.pdf · uploaded 10 Jan 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52000045696 · ARCHITECH FORM 1 31032023.pdf · uploaded 15 Apr 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52000045696 · ENGINEER FORM 2 31032023.pdf · uploaded 15 Apr 2023Source
- 3 Disclosure of sold/ booked inventoryP52000045696 · Sold Unsold 31032023.pdf · uploaded 15 Apr 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52000045696 · Form 3 31032023_11zon.pdf · uploaded 15 Apr 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52000045696 · BHAVESHWAR AQUA 2.pdf · uploaded 30 Sep 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52000045696 · ARCHITECH FORM 1 30092023.pdf · uploaded 16 Oct 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52000045696 · ENGINEER FORM 2 30092023.pdf · uploaded 16 Oct 2023Source
- 4 Disclosure of sold/ booked inventoryP52000045696 · ilovepdf_merged (1)_compressed.pdf · uploaded 16 Oct 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52000045696 · Aqua 2 Form 3 - 30092023.pdf · uploaded 16 Oct 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52000045696 · Form 1 31032024.pdf · uploaded 19 Apr 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52000045696 · FORM 2 31032024.pdf · uploaded 19 Apr 2024Source
- 5 Disclosure of sold/ booked inventoryP52000045696 · Sold Booked 31032024.pdf · uploaded 19 Apr 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52000045696 · Form 3 31032024.pdf · uploaded 19 Apr 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52000045696 · BHAVESHWAR INFRATECH.pdf · uploaded 26 Oct 2024Source
- 1 PAN CardP52000079390 · PAN.pdf · uploaded 10 Jan 2025Source
- 8 Copy of Layout Approval (in case of layout)P52000079390 · CC DRG-8.pdf · uploaded 10 Jan 2025Source
- 10 Copy of Layout Approval (in case of layout)P52000079390 · CC DRG-10.pdf · uploaded 10 Jan 2025Source
- 9 Copy of Layout Approval (in case of layout)P52000079390 · CC DRG-9.pdf · uploaded 10 Jan 2025Source
- 7 Copy of Layout Approval (in case of layout)P52000079390 · CC DRG-7.pdf · uploaded 10 Jan 2025Source
- 6 Copy of Layout Approval (in case of layout)P52000079390 · CC DRG-6.pdf · uploaded 10 Jan 2025Source
- 5 Copy of Layout Approval (in case of layout)P52000079390 · CC DRG-5.pdf · uploaded 10 Jan 2025Source
- 4 Copy of Layout Approval (in case of layout)P52000079390 · CC DRG-4.pdf · uploaded 10 Jan 2025Source
- 3 Copy of Layout Approval (in case of layout)P52000079390 · CC DRG-3.pdf · uploaded 10 Jan 2025Source
- 2 Copy of Layout Approval (in case of layout)P52000079390 · CC DRG-2.pdf · uploaded 10 Jan 2025Source
- 1 Copy of Layout Approval (in case of layout)P52000079390 · CC DRG-1.pdf · uploaded 10 Jan 2025Source
- 1 Commencement Certificates / NA Order for plotted developmentP52000079390 · RERA Letter.pdf · uploaded 10 Jan 2025Source
- 2 a Details of encumbrances concerned to FinanceP52000079390 · Financial Encumbrances.pdf · uploaded 18 Jan 2025Source
- 1 a Details of encumbrances concerned to FinanceP52000079390 · Legal Encumbrances.pdf · uploaded 18 Jan 2025Source
- 1 Declaration in FORM BP52000079390 · Form B.pdf · uploaded 18 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52000079390 · Form 1.pdf · uploaded 18 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52000079390 · Form 2.pdf · uploaded 18 Jan 2025Source
- 1 Other – LegalP52000079390 · Agreement to Lease C-7-1.pdf · uploaded 18 Jan 2025Source
- 2 Other – LegalP52000079390 · Search Report.pdf · uploaded 18 Jan 2025Source
- 1 CERSAI detailsP52000079390 · Cresai Letter.pdf · uploaded 18 Jan 2025Source
- 2 CERSAI detailsP52000079390 · CERSAI Report.pdf · uploaded 18 Jan 2025Source
- 1 Deviation Report with respect to Allotment letterP52000079390 · Deviation Allotment.pdf · uploaded 18 Jan 2025Source
- 1 b Details of encumbrances concerned to LegalP52000079390 · Legal Encumbrances.pdf · uploaded 18 Jan 2025Source
- 2 b Details of encumbrances concerned to LegalP52000079390 · Financial Encumbrances.pdf · uploaded 18 Jan 2025Source
- 1 Other – TechnicalP52000079390 · CC Mail to RERA.pdf · uploaded 18 Jan 2025Source
- 2 Other – TechnicalP52000079390 · One Plot One Resgitration.pdf · uploaded 18 Jan 2025Source
- 1 Deviation Report with respect to model copy of AgreementP52000079390 · Deviation Agreement.pdf · uploaded 18 Jan 2025Source
- 1 Proforma of Agreement for saleP52000079390 · Draft Agreement for Sale 18012025.pdf · uploaded 18 Jan 2025Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsP52000079390 · Partner Organisation.pdf · uploaded 18 Jan 2025Source
- 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)P52000079390 · Bank Format B Bank Letter.pdf · uploaded 18 Jan 2025Source
- 1 Disclosure for secured/unsecured finance availed for the projectP52000079390 · Disclouser of Finance.pdf · uploaded 18 Jan 2025Source
- 1 Declaration about all RERA Designated Bank Accounts (Format A)P52000079390 · format A.pdf · uploaded 22 Jan 2025Source
- 1 Copy of the legal title reportP52000079390 · Revised Title Report.pdf · uploaded 23 Jan 2025Source
- 1 Proforma of Allotment letterP52000079390 · Allotment Letter.pdf · uploaded 23 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52000045696 · Form 1 3112024.pdf · uploaded 30 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52000045696 · Form 3 31122024.pdf · uploaded 30 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52000045696 · Form 2 31122024.pdf · uploaded 30 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryP52000045696 · 31122024MahaRERA Sold Unsold.pdf · uploaded 30 Jan 2025Source
- 1 Declaration about Commencement CertificateP52000079390 · Declaration about CC 05022025.pdf · uploaded 5 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52000079390 · Form 3 12022025.pdf · uploaded 12 Feb 2025Source
- 1 Building Plan Approval / NA Order for plotted developmentP52000079390 · CC DRG-1_11zon.pdf · uploaded 12 Feb 2025Source
- 2 Building Plan Approval / NA Order for plotted developmentP52000079390 · CC DRG-2_11zon.pdf · uploaded 12 Feb 2025Source
- 3 Building Plan Approval / NA Order for plotted developmentP52000079390 · CC DRG-3_11zon.pdf · uploaded 21 Feb 2025Source
- 4 Building Plan Approval / NA Order for plotted developmentP52000079390 · RERA Letter.pdf · uploaded 21 Feb 2025Source
- 2 Commencement Certificates / NA Order for plotted developmentP52000079390 · CC -1.pdf · uploaded 1 Mar 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52000045696 · Form 1 31032025.pdf · uploaded 18 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52000045696 · Form 3 31032025.pdf · uploaded 18 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52000045696 · Form 2 31032025.pdf · uploaded 18 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryP52000045696 · Sold Booked 31032025.pdf · uploaded 18 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52000079390 · Form 1 31032025.pdf · uploaded 18 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52000079390 · Form 3 31032025.pdf · uploaded 18 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52000079390 · Form 2 31032025.pdf · uploaded 18 Apr 2025Source
- Form 5 (FY 2024-2025)P52000079390 · Bhaveshwar Aqua 1.pdf · uploaded 11 Jun 2025Source
- Form 5 (FY 2022-2023)P52000045696 · BHAVESHWAR AQUA 2.pdf · uploaded 14 Jun 2025Source
- Form 5 (FY 2023-2024)P52000045696 · BHAVESHWAR INFRATECH.pdf · uploaded 14 Jun 2025Source
- Form 5 (FY 2024-2025)P52000045696 · BHAVESHWAR Aqua 2.pdf · uploaded 14 Jun 2025Source
- Form 1P52000079390 · Form 1 31032025.pdf · uploaded 14 Jul 2025Source
- Form 2P52000079390 · Form 2 31032025.pdf · uploaded 14 Jul 2025Source
- Form 3P52000079390 · Form 3 31032025.pdf · uploaded 14 Jul 2025Source
- Disclosure of Sold and Booked InventoryP52000079390 · Sold Unsold 31032025.pdf · uploaded 14 Jul 2025Source
- Withdrawal Update Form 1P52000079390 · Form 1.pdf · uploaded 14 Jul 2025Source
- Withdrawal Update Form 2P52000079390 · Form 2.pdf · uploaded 14 Jul 2025Source
- Withdrawal Update Form 3P52000079390 · Form 3 12022025.pdf · uploaded 14 Jul 2025Source
- Withdrawal Update Form 1P52000079390 · Form 1 300625.pdf · uploaded 27 Sep 2025Source
- Withdrawal Update Form 1P52000079390 · Form 1 300625.pdf · uploaded 27 Sep 2025Source
- Withdrawal Update Form 1P52000079390 · Form 1 300625.pdf · uploaded 27 Sep 2025Source
- Withdrawal Update Form 1P52000079390 · Form 1 300625.pdf · uploaded 27 Sep 2025Source
- Withdrawal Update Form 1P52000079390 · Form 1 300625.pdf · uploaded 27 Sep 2025Source
- Withdrawal Update Form 2P52000079390 · Form 2 300625.pdf · uploaded 27 Sep 2025Source
- Withdrawal Update Form 2P52000079390 · Form 2 300625.pdf · uploaded 27 Sep 2025Source
- Withdrawal Update Form 2P52000079390 · Form 2 300625.pdf · uploaded 27 Sep 2025Source
- Withdrawal Update Form 2P52000079390 · Form 2 300625.pdf · uploaded 27 Sep 2025Source
- Withdrawal Update Form 2P52000079390 · Form 2 300625.pdf · uploaded 27 Sep 2025Source
- Withdrawal Update Form 3P52000079390 · Form 3 300625.pdf · uploaded 27 Sep 2025Source
- Withdrawal Update Form 3P52000079390 · Form 3 300625.pdf · uploaded 27 Sep 2025Source
- Withdrawal Update Form 3P52000079390 · Form 3 300625.pdf · uploaded 27 Sep 2025Source
- Withdrawal Update Form 3P52000079390 · Form 3 300625.pdf · uploaded 27 Sep 2025Source
- Withdrawal Update Form 3P52000079390 · Form 3 300625.pdf · uploaded 27 Sep 2025Source
- Withdrawal Update Form 1P52000079390 · Form 1 300625.pdf · uploaded 28 Sep 2025Source
- Withdrawal Update Form 1P52000079390 · Form 1 300625.pdf · uploaded 28 Sep 2025Source
- Withdrawal Update Form 2P52000079390 · Form 2 300625.pdf · uploaded 28 Sep 2025Source
- Withdrawal Update Form 2P52000079390 · Form 2 300625.pdf · uploaded 28 Sep 2025Source
- Withdrawal Update Form 3P52000079390 · Form 3 300625.pdf · uploaded 28 Sep 2025Source
- Withdrawal Update Form 3P52000079390 · Form 3 300625.pdf · uploaded 28 Sep 2025Source
- Withdrawal Update Form 1P52000079390 · Form 1 300625.pdf · uploaded 29 Sep 2025Source
- Withdrawal Update Form 1P52000079390 · Form 1 300625.pdf · uploaded 29 Sep 2025Source
- Withdrawal Update Form 2P52000079390 · Form 2 300625.pdf · uploaded 29 Sep 2025Source
- Withdrawal Update Form 2P52000079390 · Form 2 300625.pdf · uploaded 29 Sep 2025Source
- Withdrawal Update Form 3P52000079390 · Form 3 300625.pdf · uploaded 29 Sep 2025Source
- Withdrawal Update Form 3P52000079390 · Form 3 300625.pdf · uploaded 29 Sep 2025Source
- Withdrawal Update Form 1P52000079390 · Form 1 300625.pdf · uploaded 30 Sep 2025Source
- Withdrawal Update Form 1P52000079390 · Form 1 300625.pdf · uploaded 30 Sep 2025Source
- Withdrawal Update Form 1P52000079390 · Form 1 300625.pdf · uploaded 30 Sep 2025Source
- Withdrawal Update Form 1P52000079390 · Form 1 300625.pdf · uploaded 30 Sep 2025Source
- Withdrawal Update Form 2P52000079390 · Form 2 300625.pdf · uploaded 30 Sep 2025Source
- Withdrawal Update Form 2P52000079390 · Form 2 300625.pdf · uploaded 30 Sep 2025Source
- Withdrawal Update Form 2P52000079390 · Form 2 300625.pdf · uploaded 30 Sep 2025Source
- Withdrawal Update Form 2P52000079390 · Form 2 300625.pdf · uploaded 30 Sep 2025Source
- Withdrawal Update Form 3P52000079390 · Form 3 300625.pdf · uploaded 30 Sep 2025Source
- Withdrawal Update Form 3P52000079390 · Form 3 300625.pdf · uploaded 30 Sep 2025Source
- Withdrawal Update Form 3P52000079390 · Form 3 300625.pdf · uploaded 30 Sep 2025Source
- Withdrawal Update Form 3P52000079390 · Form 3 300625.pdf · uploaded 30 Sep 2025Source
- Withdrawal Update Form 1P52000079390 · Form 1 300625.pdf · uploaded 1 Oct 2025Source
- Withdrawal Update Form 2P52000079390 · Form 2 300625.pdf · uploaded 1 Oct 2025Source
- Withdrawal Update Form 3P52000079390 · Form 3 300625.pdf · uploaded 1 Oct 2025Source
- Withdrawal Update Form 1P52000079390 · Form 1 300625.pdf · uploaded 6 Oct 2025Source
- Withdrawal Update Form 2P52000079390 · Form 2 300625.pdf · uploaded 6 Oct 2025Source
- Withdrawal Update Form 3P52000079390 · Form 3 300625.pdf · uploaded 6 Oct 2025Source
- Withdrawal Update Form 1P52000079390 · Form 1 300625.pdf · uploaded 7 Oct 2025Source
- Withdrawal Update Form 2P52000079390 · Form 2 300625.pdf · uploaded 7 Oct 2025Source
- Withdrawal Update Form 3P52000079390 · Form 3 300625.pdf · uploaded 7 Oct 2025Source
- Withdrawal Update Form 1P52000045696 · form 1.pdf · uploaded 26 Nov 2025Source
- Withdrawal Update Form 1P52000045696 · form 1.pdf · uploaded 26 Nov 2025Source
- Withdrawal Update Form 2P52000045696 · form 2.pdf · uploaded 26 Nov 2025Source
- Withdrawal Update Form 2P52000045696 · form 2.pdf · uploaded 26 Nov 2025Source
- Withdrawal Update Form 3P52000045696 · Form 3 Aqua 2 30062025.pdf · uploaded 26 Nov 2025Source
- Withdrawal Update Form 3P52000045696 · Form 3 Aqua 2 30062025.pdf · uploaded 26 Nov 2025Source
- Withdrawal Update Form 1P52000079390 · Form 1.pdf · uploaded 26 Nov 2025Source
- Withdrawal Update Form 1P52000079390 · Form 1.pdf · uploaded 26 Nov 2025Source
- Withdrawal Update Form 2P52000079390 · form 2.pdf · uploaded 26 Nov 2025Source
- Withdrawal Update Form 2P52000079390 · Form 2.pdf · uploaded 26 Nov 2025Source
- Withdrawal Update Form 3P52000079390 · Form 3_Bhaveshwar Aqua 1_Sep Q.pdf · uploaded 26 Nov 2025Source
- Withdrawal Update Form 3P52000079390 · Form 3_Bhaveshwar Aqua 1_Sep Q.pdf · uploaded 26 Nov 2025Source
- Withdrawal Update Form 1P52000045696 · Form 1 aqua 2 sept.pdf · uploaded 27 Nov 2025Source
- Withdrawal Update Form 2P52000045696 · Aqua2 form 2 sept 25 Q2.pdf · uploaded 27 Nov 2025Source
- Withdrawal Update Form 3P52000045696 · Form 3_Bhaveshwar Aqua 2_Sep Q.pdf · uploaded 27 Nov 2025Source
- Withdrawal Update Form 1P52000045696 · Form 1 - Aqua 2 3112025.pdf · uploaded 30 Jan 2026Source
- Withdrawal Update Form 2P52000045696 · form 2.pdf · uploaded 30 Jan 2026Source
- Withdrawal Update Form 3P52000045696 · Form 3 - Aqua 2 - Final.pdf · uploaded 30 Jan 2026Source
- Withdrawal Update Form 1P52000079390 · Form 1 - Aqua 1 3112025.pdf · uploaded 30 Jan 2026Source
- Withdrawal Update Form 2P52000079390 · FORM 2 aqua 1.pdf · uploaded 30 Jan 2026Source
- Withdrawal Update Form 3P52000079390 · Form 3.pdf · uploaded 30 Jan 2026Source
- Withdrawal Update Form 1P52000045696 · form 1 aqua 2.pdf · uploaded 7 Feb 2026Source
- Withdrawal Update Form 2P52000045696 · form 2.pdf · uploaded 7 Feb 2026Source
- Withdrawal Update Form 3P52000045696 · Form 3 - Aqua 2 - Final.pdf · uploaded 7 Feb 2026Source
- Form 2A (FY 2024-2025)P52000045696 · FORM 2 A final.pdf · uploaded 17 Mar 2026Source
- Form 2A (FY 2024-2025)P52000079390 · Form 2 A final.pdf · uploaded 17 Mar 2026Source
- Withdrawal Update Form 1P52000045696 · BHAVESHWAR AQUA (2) - Q4 - FORM 1.pdf · uploaded 5 May 2026Source
- Withdrawal Update Form 2P52000045696 · BHAVESHWAR AQUA (2) - Q4 - FORM 2.pdf · uploaded 5 May 2026Source
- Withdrawal Update Form 3P52000045696 · BHAVESHWAR AQUA (2) - Q4 - FORM 3.pdf · uploaded 5 May 2026Source
- Withdrawal Update Form 1P52000079390 · BHAVESHWAR AQUA (1) - Q4 - FORM 1.pdf · uploaded 5 May 2026Source
- Withdrawal Update Form 2P52000079390 · BHAVESHWAR AQUA (1) - Q4 - FORM 2.pdf · uploaded 5 May 2026Source
- Withdrawal Update Form 3P52000079390 · BHAVESHWAR AQUA (1) - Q4 - FORM 3.pdf · uploaded 5 May 2026Source
- Withdrawal Update Form 1P52000045696 · form 1 NSG.pdf · uploaded 27 Jul 2026Source
- Withdrawal Update Form 2P52000045696 · Form 2 - Aqua 2 - June 2026.pdf · uploaded 27 Jul 2026Source
- Withdrawal Update Form 3P52000045696 · Form 3- Aqua 2 - June 2026.pdf · uploaded 27 Jul 2026Source
- Withdrawal Update Form 1P52000079390 · Form 1- Bhaveshwar Aqua 1 - June 2026.pdf · uploaded 1 Aug 2026Source
- Withdrawal Update Form 2P52000079390 · Form 2- Bhaveshwar Aqua 1 - June 2026.pdf · uploaded 1 Aug 2026Source
- Withdrawal Update Form 3P52000079390 · Form 3- Bhaveshwar Aqua 1 - June 2026.pdf · uploaded 1 Aug 2026Source
- Form 2A (FY 2025-2026)P52000045696 · form 2A 2025-26.pdf · uploaded 25 Aug 2026Source
- Form 2A (FY 2025-2026)P52000079390 · form 2A 2025-26.pdf · uploaded 25 Aug 2026Source
- Form 5 (FY 2025-2026)P52000045696 · FORM 5 - Bhaveshwar Aqua 2- 2025-26.pdf · uploaded 28 Sep 2026Source
- Form 5 (FY 2025-2026)P52000079390 · FORM 5 FY - Bhaveshwar aqua -1- 2025-26.pdf · uploaded 28 Sep 2026Source
Technical
- DocumentP52000045696 · Layout 1.pdf · uploaded 21 May 2022Source
- DocumentP52000045696 · Layout 2.pdf · uploaded 21 May 2022Source
- DocumentP52000045696 · Layout 3.pdf · uploaded 21 May 2022Source
- DocumentP52000045696 · Layout 4.pdf · uploaded 21 May 2022Source
- DocumentP52000045696 · Layout 5.pdf · uploaded 21 May 2022Source
- DocumentP52000045696 · CC for RERA.pdf · uploaded 21 May 2022Source
- DocumentP52000045696 · 1Revised Layout0512022.pdf · uploaded 7 Dec 2022Source
- DocumentP52000045696 · 2Revised Layout0512022.pdf · uploaded 7 Dec 2022Source
- DocumentP52000045696 · 3Revised Layout0512022.pdf · uploaded 7 Dec 2022Source
- DocumentP52000045696 · 4Revised Layout0512022.pdf · uploaded 7 Dec 2022Source
- DocumentP52000045696 · 5Revised Layout0512022.pdf · uploaded 7 Dec 2022Source
- DocumentP52000045696 · Revised CC - 05122022.pdf · uploaded 7 Dec 2022Source
- DocumentP52000079390 · CC DRG-1.pdf · uploaded 10 Jan 2025Source
- DocumentP52000079390 · CC DRG-2.pdf · uploaded 10 Jan 2025Source
- DocumentP52000079390 · CC DRG-3.pdf · uploaded 10 Jan 2025Source
- DocumentP52000079390 · CC DRG-4.pdf · uploaded 10 Jan 2025Source
- DocumentP52000079390 · CC DRG-5.pdf · uploaded 10 Jan 2025Source
- DocumentP52000079390 · CC DRG-6.pdf · uploaded 10 Jan 2025Source
- DocumentP52000079390 · CC DRG-7.pdf · uploaded 10 Jan 2025Source
- DocumentP52000079390 · CC DRG-8.pdf · uploaded 10 Jan 2025Source
- DocumentP52000079390 · CC DRG-9.pdf · uploaded 10 Jan 2025Source
- DocumentP52000079390 · CC DRG-10.pdf · uploaded 10 Jan 2025Source
- Other – TechnicalP52000079390 · CC Mail to RERA.pdf · uploaded 18 Jan 2025Source
- Other – TechnicalP52000079390 · One Plot One Resgitration.pdf · uploaded 18 Jan 2025Source
- DocumentP52000079390 · CC DRG-1_11zon.pdf · uploaded 12 Feb 2025Source
- DocumentP52000079390 · CC DRG-2_11zon.pdf · uploaded 12 Feb 2025Source
- DocumentP52000079390 · CC DRG-3_11zon.pdf · uploaded 21 Feb 2025Source
- DocumentP52000079390 · RERA Letter.pdf · uploaded 21 Feb 2025Source
- DocumentP52000045696 · PART OC.pdf · uploaded 27 Jul 2026Source
- DocumentP52000045696 · PART OC DRG-1.pdf · uploaded 27 Jul 2026Source
- DocumentP52000045696 · PART OC DRG-2.pdf · uploaded 27 Jul 2026Source
- DocumentP52000045696 · PART OC DRG-3.pdf · uploaded 27 Jul 2026Source
- DocumentP52000045696 · PART OC DRG-4.pdf · uploaded 27 Jul 2026Source
- DocumentP52000045696 · PART OC DRG-5.pdf · uploaded 27 Jul 2026Source
- DocumentP52000045696 · PART OC DRG-6.pdf · uploaded 27 Jul 2026Source
- DocumentP52000045696 · PART OC DRG-7.pdf · uploaded 27 Jul 2026Source
Technical (Architect)
- DocumentP52000045696 · Form 1 3112024.pdf · uploaded 30 Jan 2025Source
- DocumentP52000045696 · Form 1 31032025.pdf · uploaded 18 Apr 2025Source
- DocumentP52000079390 · Form 1 31032025.pdf · uploaded 18 Apr 2025Source
- DocumentP52000045696 · form 1 NSG.pdf · uploaded 27 Jul 2026Source
- DocumentP52000079390 · Form 1- Bhaveshwar Aqua 1 - June 2026.pdf · uploaded 1 Aug 2026Source
Technical (Engineer)
- DocumentP52000045696 · Form 2 31122024.pdf · uploaded 30 Jan 2025Source
- DocumentP52000045696 · Form 2 31032025.pdf · uploaded 18 Apr 2025Source
- DocumentP52000079390 · Form 2 31032025.pdf · uploaded 18 Apr 2025Source
- DocumentP52000045696 · Form 2 - Aqua 2 - June 2026.pdf · uploaded 27 Jul 2026Source
- DocumentP52000079390 · Form 2- Bhaveshwar Aqua 1 - June 2026.pdf · uploaded 1 Aug 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Kalamboli, Panvel taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Plot No C-7-1
- South
- Plot No C-6
- East
- Plot No C-5 Stp
- West
- Prop 30 Mtr Wide Road
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. | RERA |
|---|---|---|---|
| Architect | Atul Manubhai Patel | — | P52000045696 |
| Architect | Atul Manubhai Patel | — | P52000079390 |
| Architect | Atul Patel Architects | — | P52000045696 |
| Architect | Atul Patel Architects | — | P52000079390 |
| Chartered accountant | Kankotiya & Co | — | P52000045696 |
| Chartered accountant | Paras Rajubhai Kankotiya | — | P52000045696 |
| Chartered accountant | Paras Rajubhai Kankotiya | — | P52000079390 |
| Chartered accountant | Paras R Kankotiya | — | P52000079390 |
Show all 21 professionalsShow fewer professionals
| Role | Name | Registration no. | RERA |
|---|---|---|---|
| Chartered accountant | Sandesh Ghodke | — | P52000079390 |
| Chartered accountant | Sandesh Ghodke | — | P52000045696 |
| Chartered accountant | Vinodray Vithaldas Donga | — | P52000045696 |
| Chartered accountant | Vinodray Vithaldas Donga | — | P52000079390 |
| Engineer | Bhagyachandra Shamrao Sukthankar | — | P52000079390 |
| Engineer | Bhagyachandra Shamrao Sukthankar | — | P52000045696 |
| Engineer | B S Sukthankar & Associates | — | P52000045696 |
| Engineer | Rahul Govind Patel | — | P52000079390 |
| Engineer | Rahul Govind Patel | — | P52000045696 |
| Engineer | Shyam Kamble | — | P52000045696 |
| Engineer | S R Consultants | — | P52000079390 |
| Engineer | Vasant Patel | — | P52000079390 |
| Other | Patel Cost Consultants | — | P52000045696 |