Aryan Residency

Certificate Signed

Chouk Manivali, Raigarh 410203 |Promoter: Aryan Properties & Infrastructure Company

Residential / Group HousingRERAP52000020707
6 May 2019Registered with MahaRERA
30 Apr 2024Promised completion
31 Dec 2026Revised completionPushed back 2 years and 8 months
4Buildings
97Units registered45 booked (46%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Buildings
4
Unit types
1BHK, 1RK, 2BHK, Shop, 3BHK97 units in all
Address
50/6a, Talao Road, Raviprakash NagarPIN 410203
Designated bank account
28
Developed in phases
Yes

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 2 years and 8 months

Registered
6 May 2019
Promised
30 Apr 2024
Revised
31 Dec 2026

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P520000207076 May 201930 Apr 202431 Dec 2026Aryan Properties & Infrastructure CompanyProject page

4 buildings

Buildings and wings named in the registration

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

45 of 97 units booked (46%), as the promoter reported to MahaRERA

1BHK · 35 units1RK · 17 units2BHK · 22 unitsShop · 20 units3BHK · 3 units
BuildingTypeCarpet areaUnitsBooked
Aryan Aishwarya Building No 21BHK37.36 sq m · 402 sq ft30
Aryan Aishwarya Building No 21BHK38.1 sq m · 410 sq ft30
Aryan Aishwarya Building No 21BHK38.38 sq m · 413 sq ft20
Aryan Aishwarya Building No 21RK25.37 sq m · 273 sq ft30
Aryan Aishwarya Building No 22BHK41.36 sq m · 445 sq ft30
Aryan Aishwarya Building No 22BHK42.47 sq m · 457 sq ft20
Aryan Aishwarya Building No 22BHK52.97 sq m · 570 sq ft20
Aryan Aishwarya Building No 2Shop5.02 sq m · 54 sq ft10
Show all 53 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
Aryan Aishwarya Building No 2Shop5.95 sq m · 64 sq ft10
Aryan Aishwarya Building No 2Shop8.36 sq m · 90 sq ft10
Aryan Aishwarya Building No 2Shop8.46 sq m · 91 sq ft10
Aryan Aishwarya Building No 2Shop9.2 sq m · 99 sq ft20
Aryan Aishwarya Building No 2Shop9.67 sq m · 104 sq ft10
Aryan Aishwarya Building No 2Shop9.85 sq m · 106 sq ft10
Aryan Aishwarya Building No 2Shop10.04 sq m · 108 sq ft10
Aryan Aishwarya Building No 2Shop10.41 sq m · 112 sq ft10
Aryan Drushti Building No 41BHK37.36 sq m · 402 sq ft30
Aryan Drushti Building No 41BHK37.64 sq m · 405 sq ft33
Aryan Drushti Building No 41BHK41.45 sq m · 446 sq ft32
Aryan Drushti Building No 41RK21.19 sq m · 228 sq ft31
Aryan Drushti Building No 41RK27.51 sq m · 296 sq ft22
Aryan Drushti Building No 42BHK40.52 sq m · 436 sq ft31
Aryan Drushti Building No 43BHK52.97 sq m · 570 sq ft32
Aryan Sharvari Building No 31BHK31.41 sq m · 338 sq ft11
Aryan Sharvari Building No 31BHK31.88 sq m · 343 sq ft11
Aryan Sharvari Building No 31BHK34.76 sq m · 374 sq ft11
Aryan Sharvari Building No 31BHK35.59 sq m · 383 sq ft11
Aryan Sharvari Building No 31BHK37.36 sq m · 402 sq ft22
Aryan Sharvari Building No 31BHK37.64 sq m · 405 sq ft22
Aryan Sharvari Building No 31BHK37.83 sq m · 407 sq ft22
Aryan Sharvari Building No 31RK17.66 sq m · 190 sq ft11
Aryan Sharvari Building No 31RK21.19 sq m · 228 sq ft21
Aryan Sharvari Building No 31RK21.75 sq m · 234 sq ft11
Aryan Sharvari Building No 31RK27.51 sq m · 296 sq ft22
Aryan Sharvari Building No 32BHK41.45 sq m · 446 sq ft20
Aryan Sharvari Building No 32BHK43.87 sq m · 472 sq ft11
Aryan Sharvari Building No 32BHK51.58 sq m · 555 sq ft21
Aryan Shraddha Building No 11BHK37.36 sq m · 402 sq ft33
Aryan Shraddha Building No 11BHK38.1 sq m · 410 sq ft32
Aryan Shraddha Building No 11BHK38.38 sq m · 413 sq ft22
Aryan Shraddha Building No 11RK25.37 sq m · 273 sq ft33
Aryan Shraddha Building No 12BHK41.36 sq m · 445 sq ft32
Aryan Shraddha Building No 12BHK42.47 sq m · 457 sq ft22
Aryan Shraddha Building No 12BHK52.97 sq m · 570 sq ft22
Aryan Shraddha Building No 1Shop5.02 sq m · 54 sq ft10
Aryan Shraddha Building No 1Shop5.95 sq m · 64 sq ft10
Aryan Shraddha Building No 1Shop8.36 sq m · 90 sq ft10
Aryan Shraddha Building No 1Shop8.46 sq m · 91 sq ft11
Aryan Shraddha Building No 1Shop9.2 sq m · 99 sq ft20
Aryan Shraddha Building No 1Shop9.67 sq m · 104 sq ft10
Aryan Shraddha Building No 1Shop9.85 sq m · 106 sq ft10
Aryan Shraddha Building No 1Shop10.04 sq m · 108 sq ft10
Aryan Shraddha Building No 1Shop10.41 sq m · 112 sq ft10

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

2 documents held by Deedo, 130 filings listed on MahaRERA's project page

Registration certificate

Extension certificate

Finance

  • PAN CardPan card .pdf · uploaded 3 Apr 2019Source
  • PAN CardANIL PAN CARDpdf.pdf · uploaded 5 Apr 2019Source
  • PAN CardPandurang Pan Card pdf.pdf · uploaded 5 Apr 2019Source

Legal

  • Legal Title reportSEARCH REPORT.pdf · uploaded 4 Apr 2019Source
  • Legal Title reportSEARCH REPORT1.pdf · uploaded 4 Apr 2019Source
  • Legal Title reportSEARCH REPORT2.pdf · uploaded 4 Apr 2019Source
Show all 132 documentsShow fewer documents

Legal

  • Legal Title reportSEARCH REPORT3.pdf · uploaded 4 Apr 2019Source
  • Legal Title reportSEARCH REPORT4.pdf · uploaded 4 Apr 2019Source
  • Declaration Form BAffidavit cum Declaretion.pdf · uploaded 4 Apr 2019Source
  • OtherPARTNERSHIP DEED ( 1).pdf · uploaded 5 Apr 2019Source
  • OtherPARTNERSHIP DEED ( 2).pdf · uploaded 5 Apr 2019Source
  • Declaration Form BPROMOTER FORM B (NOTARY).pdf · uploaded 27 Mar 2024Source

Migrated

  • 1 PAN CardPan card .pdf · uploaded 3 Apr 2019Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificates 1.pdf · uploaded 3 Apr 2019Source
  • 1 Copy of the legal title reportSEARCH REPORT.pdf · uploaded 4 Apr 2019Source
  • 2 Copy of the legal title reportSEARCH REPORT1.pdf · uploaded 4 Apr 2019Source
  • 3 Copy of the legal title reportSEARCH REPORT2.pdf · uploaded 4 Apr 2019Source
  • 4 Copy of the legal title reportSEARCH REPORT3.pdf · uploaded 4 Apr 2019Source
  • 5 Copy of the legal title reportSEARCH REPORT4.pdf · uploaded 4 Apr 2019Source
  • 1 Copy of Layout Approval (in case of layout)Self Declaretion.pdf · uploaded 4 Apr 2019Source
  • 1 Building Plan Approval (IOD)Building Plan.pdf · uploaded 4 Apr 2019Source
  • 2 Building Plan Approval (IOD)Building Plan .pdf · uploaded 4 Apr 2019Source
  • 3 Building Plan Approval (IOD)Building Plan .pdf · uploaded 4 Apr 2019Source
  • 4 Building Plan Approval (IOD)Building Plan .pdf · uploaded 4 Apr 2019Source
  • 5 Building Plan Approval (IOD)Building Plan .pdf · uploaded 4 Apr 2019Source
  • 6 Building Plan Approval (IOD)Building Plan .pdf · uploaded 4 Apr 2019Source
  • 2 Commencement Certificates / NA Order for plotted developmentCommencement Certificates 2.pdf · uploaded 4 Apr 2019Source
  • 3 Commencement Certificates / NA Order for plotted developmentCommencement Certificates 3.pdf · uploaded 4 Apr 2019Source
  • 1 Declaration in FORM BAffidavit cum Declaretion.pdf · uploaded 4 Apr 2019Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Self Declaretion.pdf · uploaded 4 Apr 2019Source
  • 1 Certificates of CA (Form 3)Certificates of CA (Form 3).pdf · uploaded 4 Apr 2019Source
  • 1 Status of Formation of Legal Entity (Society/Co Op etc.)Self Declaretion.pdf · uploaded 4 Apr 2019Source
  • 1 Status of ConveyanceSAT BARA .pdf · uploaded 4 Apr 2019Source
  • 2 PAN CardANIL PAN CARDpdf.pdf · uploaded 5 Apr 2019Source
  • 3 PAN CardPandurang Pan Card pdf.pdf · uploaded 5 Apr 2019Source
  • 1 OtherPARTNERSHIP DEED ( 1).pdf · uploaded 5 Apr 2019Source
  • 2 OtherPARTNERSHIP DEED ( 2).pdf · uploaded 5 Apr 2019Source
  • 1 Details of encumbrancesEncumbrances Certificate .pdf · uploaded 3 May 2019Source
  • 1 Proforma of Allotment letterAgreement For Sale .pdf · uploaded 3 May 2019Source
  • 2 Proforma of Allotment letterAgreement For Sale 1 .pdf · uploaded 3 May 2019Source
  • 3 Proforma of Allotment letterAgreement For Sale 2 .pdf · uploaded 3 May 2019Source
  • 4 Proforma of Allotment letterAgreement For Sale 3 .pdf · uploaded 3 May 2019Source
  • 5 Proforma of Allotment letterAgreement For Sale 4.pdf · uploaded 3 May 2019Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 _ Architect's Certificate.pdf · uploaded 3 Feb 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 ENGINEER'S CERTIFICATE.pdf · uploaded 3 Feb 2023Source
  • 1 Disclosure of sold/ booked inventorySold Unsold list.pdf · uploaded 3 Feb 2023Source
  • 2 Certificates of CA (Form 3)Form 3 _CA.pdf · uploaded 3 Feb 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)FORM 5 year of 2019-2020_CA.pdf · uploaded 3 Feb 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)FORM 5 year of 2021-2022_CA.pdf · uploaded 3 Feb 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FORM 5 year of 2021-2022_CA.pdf · uploaded 3 Feb 2023Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1-ARYAN RESIDENCY_MAR 23.pdf · uploaded 6 Jun 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2-ARYAN RESIDENCY_MAR 23.pdf · uploaded 6 Jun 2023Source
  • 2 Disclosure of sold/ booked inventorySOLD BOOKED-ARYAN RESIDENCY_MAR 23.pdf · uploaded 6 Jun 2023Source
  • 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)1 FORM 1.pdf · uploaded 20 Jan 2024Source
  • 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)2 FORM 1.pdf · uploaded 20 Jan 2024Source
  • 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)3 FOM 1.pdf · uploaded 20 Jan 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)4 FORM 2.pdf · uploaded 20 Jan 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)5 FORM 2.pdf · uploaded 20 Jan 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)6 FORM 2.pdf · uploaded 20 Jan 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM 2A.pdf · uploaded 20 Jan 2024Source
  • 3 Disclosure of sold/ booked inventory10 SOLD UNSOLD.pdf · uploaded 20 Jan 2024Source
  • 4 Disclosure of sold/ booked inventory11 SOLD UNSOLD.pdf · uploaded 20 Jan 2024Source
  • 5 Disclosure of sold/ booked inventory12 SOLD UNSOLD.pdf · uploaded 20 Jan 2024Source
  • 3 Certificates of CA (Form 3)7 FORM 3.pdf · uploaded 20 Jan 2024Source
  • 4 Certificates of CA (Form 3)8 FORM 3.pdf · uploaded 20 Jan 2024Source
  • 5 Certificates of CA (Form 3)9 FORM 3.pdf · uploaded 20 Jan 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5.pdf · uploaded 20 Jan 2024Source
  • 2 Declaration in FORM BPROMOTER FORM B (NOTARY).pdf · uploaded 27 Mar 2024Source
  • 1 Declaration about Commencement CertificateCC DECLARATION.pdf · uploaded 5 Apr 2024Source
  • 1 CERSAI detailsCERSAI.pdf · uploaded 5 Apr 2024Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsID.pdf · uploaded 5 Apr 2024Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameBANK.pdf · uploaded 5 Apr 2024Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)1 FORM 1_Aryan Properties Infrastructure Company_ARYAN RESIDENCY_JUNE 2024_compressed.pdf · uploaded 19 Feb 2025Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)1FORM 1_Aryan Properties Infrastructure Company_ARYAN RESIDENCY_SEP 2024_compressed.pdf · uploaded 19 Feb 2025Source
  • 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)1 FORM 1_Aryan Properties Infrastructure Company_ARYAN RESIDENCY_DEC 2024.pdf · uploaded 19 Feb 2025Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)1 Form1_Aryan Properties Infrastructure Company_ARYAN RESIDENCY_march2024_compressed.pdf · uploaded 19 Feb 2025Source
  • 1 Certificates of CA (Form 3)3 Form3_Aryan Properties Infrastructure Company_ARYAN RESIDENCY_march2024_compressed.pdf · uploaded 19 Feb 2025Source
  • 2 Certificates of CA (Form 3)3 FORM 3_Aryan Properties Infrastructure Company_ARYAN RESIDENCY_JUNE 2024_compressed.pdf · uploaded 19 Feb 2025Source
  • 3 Certificates of CA (Form 3)3 FORM 3_Aryan Properties Infrastructure Company_ARYAN RESIDENCY_SEP 2024_compressed.pdf · uploaded 19 Feb 2025Source
  • 4 Certificates of CA (Form 3)3FORM 3_Aryan Properties Infrastructure Company_ARYAN RESIDENCY_DEC 2024.pdf · uploaded 19 Feb 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)2 FORM 2_Aryan Properties Infrastructure Company_ARYAN RESIDENCY_JUNE 2024.pdf · uploaded 19 Feb 2025Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)2FORM 2_Aryan Properties Infrastructure Company_ARYAN RESIDENCY_DEC 2024.pdf · uploaded 19 Feb 2025Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)2 FORM 2_Aryan Properties Infrastructure Company_ARYAN RESIDENCY_SEP 2024.pdf · uploaded 19 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)2 Form 2_Aryan Properties Infrastructure Company_ARYAN RESIDENCY_march2024.pdf · uploaded 19 Feb 2025Source
  • 1 Disclosure of sold/ booked inventory4 sold unsold_Aryan Properties Infrastructure Company_ARYAN RESIDENCY_march2024.pdf · uploaded 19 Feb 2025Source
  • 2 Disclosure of sold/ booked inventory4 SOLD UNSOLD_Aryan Properties Infrastructure Company_ARYAN RESIDENCY_JUNE 2024.pdf · uploaded 19 Feb 2025Source
  • 3 Disclosure of sold/ booked inventory4 SOLD UNSOLD_Aryan Properties Infrastructure Company_ARYAN RESIDENCY_SEP 2024.pdf · uploaded 19 Feb 2025Source
  • 4 Disclosure of sold/ booked inventory4 SOLD UNSOLD_Aryan Properties Infrastructure Company_ARYAN RESIDENCY_DEC 2024.pdf · uploaded 19 Feb 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form - 2A 31st March 2024 Aryan Properties.pdf · uploaded 19 Feb 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)From - 5 , 13th Feb 2025.pdf · uploaded 19 Feb 2025Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)From - 5 , 13th Feb 2025.pdf · uploaded 19 Feb 2025Source
  • Form 1FORM 1_ MARCH 25_ AARYAN RESIDENCY.pdf · uploaded 16 Sep 2026Source
  • Form 2FORM 2_ MARCH 25_ AARYAN RESIDENCY.pdf · uploaded 16 Sep 2026Source
  • Form 3FORM 3_ MARCH 25_ AARYAN RESIDENCY.pdf · uploaded 16 Sep 2026Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD_ MARCH 25_ AARYAN RESIDENCY.pdf · uploaded 16 Sep 2026Source
  • Form 1FORM 1_ JUNE 25_ AARYAN RESIDENCY.pdf · uploaded 16 Sep 2026Source
  • Form 2FORM 2_ JUNE 25_ AARYAN RESIDENCY.pdf · uploaded 16 Sep 2026Source
  • Form 3FORM 3_ JUNE 25_ AARYAN RESIDENCY.pdf · uploaded 16 Sep 2026Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD_ JUNE 25_ AARYAN RESIDENCY.pdf · uploaded 16 Sep 2026Source
  • Form 1FORM 1_ SEP 25_ AARYAN RESIDENCY.pdf · uploaded 16 Sep 2026Source
  • Form 2FORM 2_ SEP 25_ AARYAN RESIDENCY.pdf · uploaded 16 Sep 2026Source
  • Form 3FORM 3_ SEP 25_ AARYAN RESIDENCY.pdf · uploaded 16 Sep 2026Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD_ SEP 25_ AARYAN RESIDENCY.pdf · uploaded 16 Sep 2026Source
  • Form 1FORM 1_ DEC 25_ AARYAN RESIDENCY.pdf · uploaded 16 Sep 2026Source
  • Form 2FORM 2_ DEC 25_ AARYAN RESIDENCY.pdf · uploaded 16 Sep 2026Source
  • Form 3FORM 3_ DEC 25_ AARYAN RESIDENCY.pdf · uploaded 16 Sep 2026Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD_ DEC 25_ AARYAN RESIDENCY.pdf · uploaded 16 Sep 2026Source
  • Form 1FORM 1_ MARCH 26_ AARYAN RESIDENCY.pdf · uploaded 16 Sep 2026Source
  • Form 2FORM 2_ MARCH 26_ AARYAN RESIDENCY.pdf · uploaded 16 Sep 2026Source
  • Form 3FORM 3_ MARCH 26_ AARYAN RESIDENCY.pdf · uploaded 16 Sep 2026Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD_ MARCH 26_ AARYAN RESIDENCY.pdf · uploaded 16 Sep 2026Source
  • Form 5 (FY 2024-2025)FORM 5_ MARCH 25_ AARYAN RESIDENCY.pdf · uploaded 16 Sep 2026Source
  • Form 5 (FY 2025-2026)FROM 5_ MARCH 26_ AARYAN RESIDENCY.pdf · uploaded 16 Sep 2026Source

Technical

  • DocumentSelf Declaretion.pdf · uploaded 4 Apr 2019Source
  • DocumentBuilding Plan.pdf · uploaded 4 Apr 2019Source
  • DocumentBuilding Plan .pdf · uploaded 4 Apr 2019Source
  • DocumentBuilding Plan .pdf · uploaded 4 Apr 2019Source
  • DocumentBuilding Plan .pdf · uploaded 4 Apr 2019Source
  • DocumentBuilding Plan .pdf · uploaded 4 Apr 2019Source
  • DocumentBuilding Plan .pdf · uploaded 4 Apr 2019Source

Technical (Architect)

  • Document3 FOM 1.pdf · uploaded 20 Jan 2024Source
  • Document1 Form1_Aryan Properties Infrastructure Company_ARYAN RESIDENCY_march2024_compressed.pdf · uploaded 19 Feb 2025Source
  • Document1 FORM 1_Aryan Properties Infrastructure Company_ARYAN RESIDENCY_JUNE 2024_compressed.pdf · uploaded 19 Feb 2025Source
  • Document1FORM 1_Aryan Properties Infrastructure Company_ARYAN RESIDENCY_SEP 2024_compressed.pdf · uploaded 19 Feb 2025Source
  • Document1 FORM 1_Aryan Properties Infrastructure Company_ARYAN RESIDENCY_DEC 2024.pdf · uploaded 19 Feb 2025Source

Technical (Engineer)

  • Document6 FORM 2.pdf · uploaded 20 Jan 2024Source
  • Document2 Form 2_Aryan Properties Infrastructure Company_ARYAN RESIDENCY_march2024.pdf · uploaded 19 Feb 2025Source
  • Document2 FORM 2_Aryan Properties Infrastructure Company_ARYAN RESIDENCY_JUNE 2024.pdf · uploaded 19 Feb 2025Source
  • Document2 FORM 2_Aryan Properties Infrastructure Company_ARYAN RESIDENCY_SEP 2024.pdf · uploaded 19 Feb 2025Source
  • Document2FORM 2_Aryan Properties Infrastructure Company_ARYAN RESIDENCY_DEC 2024.pdf · uploaded 19 Feb 2025Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Chouk Manivali, Khalapur taluka

Survey, CTS, gat or plot numbers

50/6A

Boundaries

North
Tupgaon Bondry
South
Chouk Nala
East
Sunita Malusare
West
Vasant Malusare

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectRajan Vasudeo Mane—
Chartered accountantRajesh Mahadeo Shinde—
EngineerAditi Adesh Lokhande—
OtherAishwarya Construction—

Source: MahaRERA project page. Contact details are not shown.

Data through12 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology