Balaji Icon
Certificate SignedChanje, Raigarh 400702 |Promoter: Shree Balaji Developers
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Buildings
- 1
- Unit types
- A Wing Rehab 1BHK, A Wing Rehab 2BHK, A Wing Rehab 3BHK, A Wing Rehab Shop, A Wing Sale 1BHK, A Wing Sale 1RK, A Wing Sale 2BHK, A Wing Sale 3BHK, A Wing Sale Office, A Wing Sale Shop, B Wing Rehab 1BHK, B Wing Rehab 2BHK, B Wing Rehab Shop, B Wing Sale 1BHK, B Wing Sale 2BHK, B Wing Sale Office, B Wing Sale Shop, B Wing Sale Tenant186 units in all
- Address
- Survey No- 79/2 (Old Survey No-79/A/2), 81/2, Survey No- 79/A/2, 81/2, ChanjePIN 400702
- Designated bank account
- 35
- Developed in phases
- No
Location
Coordinates as published by MahaRERA
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 4 months
- Registered
- 31 Jul 2024
- Promised
- 20 Mar 2029
- Revised
- 20 Jul 2029
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52000077225 | 31 Jul 2024 | 20 Mar 2029 | 20 Jul 2029 | Shree Balaji Developers | Project page |
1 building
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| BALAJI ICON- A Wing and B Wing | 10 | 186 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
9 of 186 units booked (5%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| A Wing Rehab 1BHK | 39.48 sq m · 425 sq ft | 3 | 0 |
| A Wing Rehab 1BHK | 41.42 sq m · 446 sq ft | 3 | 0 |
| A Wing Rehab 2BHK | 50.17 sq m · 540 sq ft | 4 | 0 |
| A Wing Rehab 2BHK | 51.32 sq m · 552 sq ft | 2 | 0 |
| A Wing Rehab 2BHK | 51.52 sq m · 555 sq ft | 4 | 0 |
| A Wing Rehab 2BHK | 51.77 sq m · 557 sq ft | 3 | 0 |
| A Wing Rehab 2BHK | 52.91 sq m · 570 sq ft | 1 | 0 |
| A Wing Rehab 3BHK | 66.17 sq m · 712 sq ft | 1 | 0 |
Show all 99 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| A Wing Rehab Shop | 10.23 sq m · 110 sq ft | 1 | 0 |
| A Wing Rehab Shop | 11.38 sq m · 122 sq ft | 1 | 0 |
| A Wing Rehab Shop | 14.5 sq m · 156 sq ft | 1 | 0 |
| A Wing Rehab Shop | 15.39 sq m · 166 sq ft | 1 | 0 |
| A Wing Rehab Shop | 15.54 sq m · 167 sq ft | 1 | 0 |
| A Wing Rehab Shop | 15.65 sq m · 168 sq ft | 1 | 0 |
| A Wing Rehab Shop | 15.82 sq m · 170 sq ft | 1 | 0 |
| A Wing Rehab Shop | 16.02 sq m · 172 sq ft | 1 | 0 |
| A Wing Rehab Shop | 16.6 sq m · 179 sq ft | 1 | 0 |
| A Wing Rehab Shop | 17.41 sq m · 187 sq ft | 1 | 0 |
| A Wing Rehab Shop | 19.48 sq m · 210 sq ft | 1 | 0 |
| A Wing Rehab Shop | 20.16 sq m · 217 sq ft | 1 | 0 |
| A Wing Rehab Shop | 20.36 sq m · 219 sq ft | 1 | 0 |
| A Wing Rehab Shop | 21.78 sq m · 234 sq ft | 1 | 0 |
| A Wing Rehab Shop | 22.04 sq m · 237 sq ft | 1 | 0 |
| A Wing Sale 1BHK | 39.48 sq m · 425 sq ft | 4 | 0 |
| A Wing Sale 1BHK | 41.42 sq m · 446 sq ft | 4 | 0 |
| A Wing Sale 1BHK | 41.59 sq m · 448 sq ft | 2 | 0 |
| A Wing Sale 1BHK | 42.77 sq m · 460 sq ft | 1 | 0 |
| A Wing Sale 1RK | 19.27 sq m · 207 sq ft | 1 | 0 |
| A Wing Sale 2BHK | 50.17 sq m · 540 sq ft | 3 | 0 |
| A Wing Sale 2BHK | 51.32 sq m · 552 sq ft | 4 | 0 |
| A Wing Sale 2BHK | 51.52 sq m · 555 sq ft | 10 | 1 |
| A Wing Sale 2BHK | 51.77 sq m · 557 sq ft | 2 | 1 |
| A Wing Sale 2BHK | 52.91 sq m · 570 sq ft | 1 | 0 |
| A Wing Sale 2BHK | 57.65 sq m · 621 sq ft | 1 | 0 |
| A Wing Sale 3BHK | 66.19 sq m · 712 sq ft | 4 | 0 |
| A Wing Sale 3BHK | 66.93 sq m · 720 sq ft | 1 | 0 |
| A Wing Sale Office | 22.81 sq m · 246 sq ft | 1 | 0 |
| A Wing Sale Office | 23.38 sq m · 252 sq ft | 1 | 0 |
| A Wing Sale Office | 26.42 sq m · 284 sq ft | 1 | 0 |
| A Wing Sale Office | 29.59 sq m · 319 sq ft | 1 | 0 |
| A Wing Sale Office | 31.11 sq m · 335 sq ft | 1 | 0 |
| A Wing Sale Office | 31.89 sq m · 343 sq ft | 1 | 0 |
| A Wing Sale Office | 32.82 sq m · 353 sq ft | 1 | 0 |
| A Wing Sale Office | 36.32 sq m · 391 sq ft | 1 | 0 |
| A Wing Sale Office | 37.13 sq m · 400 sq ft | 1 | 0 |
| A Wing Sale Office | 37.46 sq m · 403 sq ft | 1 | 0 |
| A Wing Sale Office | 37.57 sq m · 404 sq ft | 1 | 0 |
| A Wing Sale Office | 37.72 sq m · 406 sq ft | 1 | 0 |
| A Wing Sale Office | 39.07 sq m · 421 sq ft | 1 | 0 |
| A Wing Sale Office | 39.25 sq m · 422 sq ft | 1 | 0 |
| A Wing Sale Office | 49.39 sq m · 532 sq ft | 1 | 0 |
| A Wing Sale Office | 49.87 sq m · 537 sq ft | 1 | 0 |
| A Wing Sale Shop | 11.54 sq m · 124 sq ft | 1 | 1 |
| A Wing Sale Shop | 12.73 sq m · 137 sq ft | 1 | 1 |
| A Wing Sale Shop | 12.76 sq m · 137 sq ft | 1 | 0 |
| A Wing Sale Shop | 13.38 sq m · 144 sq ft | 1 | 1 |
| A Wing Sale Shop | 13.89 sq m · 150 sq ft | 1 | 1 |
| A Wing Sale Shop | 14.34 sq m · 154 sq ft | 1 | 0 |
| A Wing Sale Shop | 17.82 sq m · 192 sq ft | 1 | 1 |
| A Wing Sale Shop | 19.08 sq m · 205 sq ft | 1 | 0 |
| A Wing Sale Shop | 19.29 sq m · 208 sq ft | 1 | 0 |
| A Wing Sale Shop | 23.02 sq m · 248 sq ft | 1 | 1 |
| A Wing Sale Shop | 27.13 sq m · 292 sq ft | 1 | 0 |
| B Wing Rehab 1BHK | 34.58 sq m · 372 sq ft | 1 | 0 |
| B Wing Rehab 1BHK | 34.75 sq m · 374 sq ft | 9 | 0 |
| B Wing Rehab 1BHK | 35.94 sq m · 387 sq ft | 1 | 0 |
| B Wing Rehab 1BHK | 35.95 sq m · 387 sq ft | 5 | 0 |
| B Wing Rehab 1BHK | 35.96 sq m · 387 sq ft | 2 | 0 |
| B Wing Rehab 1BHK | 35.97 sq m · 387 sq ft | 4 | 0 |
| B Wing Rehab 1BHK | 36.02 sq m · 388 sq ft | 1 | 0 |
| B Wing Rehab 2BHK | 47.52 sq m · 512 sq ft | 3 | 0 |
| B Wing Rehab 2BHK | 47.54 sq m · 512 sq ft | 13 | 0 |
| B Wing Rehab 2BHK | 47.55 sq m · 512 sq ft | 10 | 0 |
| B Wing Rehab 2BHK | 47.56 sq m · 512 sq ft | 5 | 0 |
| B Wing Rehab Shop | 10.67 sq m · 115 sq ft | 1 | 0 |
| B Wing Sale 1BHK | 34.55 sq m · 372 sq ft | 1 | 0 |
| B Wing Sale 1BHK | 34.75 sq m · 374 sq ft | 5 | 0 |
| B Wing Sale 1BHK | 35.95 sq m · 387 sq ft | 2 | 0 |
| B Wing Sale 1BHK | 35.96 sq m · 387 sq ft | 1 | 0 |
| B Wing Sale 1BHK | 35.97 sq m · 387 sq ft | 2 | 0 |
| B Wing Sale 1BHK | 37.22 sq m · 401 sq ft | 1 | 0 |
| B Wing Sale 1BHK | 40.54 sq m · 436 sq ft | 1 | 0 |
| B Wing Sale 2BHK | 47.54 sq m · 512 sq ft | 1 | 0 |
| B Wing Sale 2BHK | 47.56 sq m · 512 sq ft | 1 | 0 |
| B Wing Sale Office | 13.75 sq m · 148 sq ft | 1 | 0 |
| B Wing Sale Office | 16.53 sq m · 178 sq ft | 1 | 0 |
| B Wing Sale Office | 22.2 sq m · 239 sq ft | 1 | 0 |
| B Wing Sale Office | 24.08 sq m · 259 sq ft | 1 | 0 |
| B Wing Sale Office | 29 sq m · 312 sq ft | 1 | 0 |
| B Wing Sale Shop | 7.34 sq m · 79 sq ft | 1 | 0 |
| B Wing Sale Shop | 13.76 sq m · 148 sq ft | 1 | 0 |
| B Wing Sale Shop | 16.35 sq m · 176 sq ft | 1 | 0 |
| B Wing Sale Shop | 16.56 sq m · 178 sq ft | 1 | 0 |
| B Wing Sale Shop | 18.21 sq m · 196 sq ft | 1 | 0 |
| B Wing Sale Shop | 18.77 sq m · 202 sq ft | 1 | 0 |
| B Wing Sale Shop | 22.2 sq m · 239 sq ft | 1 | 0 |
| B Wing Sale Shop | 24.38 sq m · 262 sq ft | 1 | 0 |
| B Wing Sale Shop | 28.23 sq m · 304 sq ft | 1 | 0 |
| B Wing Sale Tenant | 8.06 sq m · 87 sq ft | 1 | 1 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
1 document held by Deedo, 113 filings listed on MahaRERA's project page
Finance
Legal
Show all 114 documentsShow fewer documents
Migrated
- 1 Building Plan Approval / NA Order for plotted developmentPlan2_11zon.pdf · uploaded 16 Jul 2024Source
- 2 Building Plan Approval / NA Order for plotted development2 Building Plan Approval _ NA Order for plotted development_11zon.pdf · uploaded 16 Jul 2024Source
- 3 Building Plan Approval / NA Order for plotted developmentPlan4_11zon.pdf · uploaded 16 Jul 2024Source
- 4 Building Plan Approval / NA Order for plotted developmentPlan5_11zon.pdf · uploaded 16 Jul 2024Source
- 5 Building Plan Approval / NA Order for plotted developmentPlan 6_11zon.pdf · uploaded 16 Jul 2024Source
- 6 Building Plan Approval / NA Order for plotted developmentPlan7_11zon.pdf · uploaded 16 Jul 2024Source
- 7 Building Plan Approval / NA Order for plotted developmentPlan8_11zon.pdf · uploaded 16 Jul 2024Source
- 8 Building Plan Approval / NA Order for plotted developmentPlan9_11zon.pdf · uploaded 16 Jul 2024Source
- 9 Building Plan Approval / NA Order for plotted developmentPlan10_11zon.pdf · uploaded 16 Jul 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentRevised Commencement certificate.pdf · uploaded 16 Jul 2024Source
- 1 a Details of encumbrances concerned to FinanceEncumbrance letter- Finance.pdf · uploaded 17 Jul 2024Source
- 2 a Details of encumbrances concerned to FinanceEncumbrance letter- legal.pdf · uploaded 17 Jul 2024Source
- 1 b Details of encumbrances concerned to LegalEncumbrance letter- Finance.pdf · uploaded 17 Jul 2024Source
- 2 b Details of encumbrances concerned to LegalEncumbrance letter- legal.pdf · uploaded 17 Jul 2024Source
- 1 CERSAI detailsDeclaration of Cersai.pdf · uploaded 17 Jul 2024Source
- 1 Disclosure for secured/unsecured finance availed for the projectDisclosure of Secured or Unsecured.pdf · uploaded 17 Jul 2024Source
- 1 Disclosure of Interest in Other Real Estate Organizationsoutput.pdf · uploaded 17 Jul 2024Source
- 1 Other – FinanceDeclaration of Society.pdf · uploaded 17 Jul 2024Source
- 1 Other – Technical1 Other – Technical (1).pdf · uploaded 17 Jul 2024Source
- 2 Other – TechnicalDeclaration of Society.pdf · uploaded 17 Jul 2024Source
- 10 Building Plan Approval / NA Order for plotted developmentPlan 11_11zon.pdf · uploaded 18 Jul 2024Source
- 1 Declaration in FORM BForm B (Promoter).pdf · uploaded 18 Jul 2024Source
- 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Format B.pdf · uploaded 18 Jul 2024Source
- 1 Copy of the legal title reportFinal title report.pdf · uploaded 19 Jul 2024Source
- 11 Building Plan Approval / NA Order for plotted development11 Building Plan Approval _ NA Order for plotted development.pdf · uploaded 19 Jul 2024Source
- 1 Declaration about Commencement Certificate1 Declaration about Commencement Certificate (1).pdf · uploaded 19 Jul 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Architct Certificate.pdf · uploaded 19 Jul 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)output (1).pdf · uploaded 19 Jul 2024Source
- 1 Proforma of Agreement for saleAFS.pdf · uploaded 19 Jul 2024Source
- 1 Proforma of Allotment letterAL.pdf · uploaded 19 Jul 2024Source
- 1 Declaration about all RERA Designated Bank Accounts (Format A)Format A.pdf · uploaded 19 Jul 2024Source
- 1 Deviation Report with respect to Allotment letterdeviation report allotment letter.pdf · uploaded 19 Jul 2024Source
- 1 Deviation Report with respect to model copy of Agreementdeviation report agreement for sale.pdf · uploaded 19 Jul 2024Source
- 2 Other – Financeoutput.pdf · uploaded 19 Jul 2024Source
- 3 Other – TechnicalDeclaration on Units.pdf · uploaded 19 Jul 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Engineer Certificate.pdf · uploaded 20 Jul 2024Source
- 2 Commencement Certificates / NA Order for plotted developmentBalaji Icon- CC Verification mail.pdf · uploaded 25 Jul 2024Source
- 4 Other – TechnicalBalaji Icon- CC Verification mail.pdf · uploaded 25 Jul 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Balaji Icon as on Sep 2024.pdf · uploaded 20 Oct 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentBalaji Icon - CC.pdf · uploaded 4 Nov 2024Source
- 1 Copy of Layout Approval (in case of layout)1.pdf · uploaded 7 Nov 2024Source
- 1 Building Plan Approval / NA Order for plotted development2.pdf · uploaded 7 Nov 2024Source
- 2 Building Plan Approval / NA Order for plotted development3.pdf · uploaded 7 Nov 2024Source
- 3 Building Plan Approval / NA Order for plotted development4.pdf · uploaded 7 Nov 2024Source
- 4 Building Plan Approval / NA Order for plotted development5-8.pdf · uploaded 7 Nov 2024Source
- 5 Building Plan Approval / NA Order for plotted development9-11.pdf · uploaded 7 Nov 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Balaji Icon as on Sep 2024.pdf · uploaded 8 Nov 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Balaji Icon as on Sep 2024.pdf · uploaded 8 Nov 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Balaji Icon as on December 2024.pdf · uploaded 3 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Balaji Icon as on Dec 2024.pdf · uploaded 25 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Balaji Icon as on Dec 2024.pdf · uploaded 25 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Balaji Icon as on March 2025.pdf · uploaded 9 Apr 2025Source
- Form 1Form 1 - Balaji Icon as on March 2025.pdf · uploaded 3 Sep 2025Source
- Form 2Form 2 - Balaji Icon as on March 2025.pdf · uploaded 3 Sep 2025Source
- Form 3Form 3 - Balaji Icon as on March 2025.pdf · uploaded 3 Sep 2025Source
- Disclosure of Sold and Booked InventoryCircular 29 - Balaji Icon as on March 2025.pdf · uploaded 3 Sep 2025Source
- Form 1Form 1 - Balaji Icon as on Sept 2025.pdf · uploaded 26 Feb 2026Source
- Form 2Form 2 - Balaji Icon as on Sept 2025.pdf · uploaded 26 Feb 2026Source
- Form 3Form 3 - Balaji Icon as on Sept 2025.pdf · uploaded 26 Feb 2026Source
- Disclosure of Sold and Booked InventoryCircular 29 - Balaji Icon as on Sep 2025.pdf · uploaded 26 Feb 2026Source
- Form 1Form 1 - Balaji Icon as on Dec 2025.pdf · uploaded 26 Feb 2026Source
- Form 2Form 2 - Balaji Icon as on Dec 2025.pdf · uploaded 26 Feb 2026Source
- Form 3Form 3 - Balaji Icon as on Dec 2025.pdf · uploaded 26 Feb 2026Source
- Disclosure of Sold and Booked InventoryCircular 29 - Balaji Icon as on Dec 2025.pdf · uploaded 26 Feb 2026Source
- Form 5 (FY 2024-2025)Balaji Icon-Form 5-FY 2024-25.pdf · uploaded 26 Feb 2026Source
- Form 1Form 1 - Balaji Icon as on June 2025.pdf · uploaded 2 Mar 2026Source
- Form 2Form 2 - Balaji Icon as on June 2025.pdf · uploaded 2 Mar 2026Source
- Form 3Form 3 - Balaji Icon as on June 2025.pdf · uploaded 2 Mar 2026Source
- Disclosure of Sold and Booked InventoryCircular 29 - Balaji Icon as on June 2025.pdf · uploaded 2 Mar 2026Source
- Form 1Form 1 - Balaji Icon as on March 2026.pdf · uploaded 11 May 2026Source
- Form 2Form 2 - Balaji Icon as on March 2026.pdf · uploaded 11 May 2026Source
- Form 3Form 3 - Balaji Icon as on March 2026.pdf · uploaded 11 May 2026Source
- Disclosure of Sold and Booked InventoryCircular 29 - Balaji Icon as on March 2026.pdf · uploaded 11 May 2026Source
- Form 1Form 1 - Balaji Icon as on June 2026.pdf · uploaded 31 Jul 2026Source
- Form 2Form 2 - Balaji Icon as on June 2026.pdf · uploaded 31 Jul 2026Source
- Form 3Form 3 - Balaji Icon as on June 2026.pdf · uploaded 31 Jul 2026Source
- Disclosure of Sold and Booked InventoryCircular 29 - Balaji Icon as on June 2026.pdf · uploaded 31 Jul 2026Source
Technical
- DocumentPlan1_11zon.pdf · uploaded 16 Jul 2024Source
- DocumentPlan2_11zon.pdf · uploaded 16 Jul 2024Source
- Document2 Building Plan Approval _ NA Order for plotted development_11zon.pdf · uploaded 16 Jul 2024Source
- DocumentPlan4_11zon.pdf · uploaded 16 Jul 2024Source
- DocumentPlan5_11zon.pdf · uploaded 16 Jul 2024Source
- DocumentPlan 6_11zon.pdf · uploaded 16 Jul 2024Source
- DocumentPlan7_11zon.pdf · uploaded 16 Jul 2024Source
- DocumentPlan8_11zon.pdf · uploaded 16 Jul 2024Source
- DocumentPlan9_11zon.pdf · uploaded 16 Jul 2024Source
- DocumentPlan10_11zon.pdf · uploaded 16 Jul 2024Source
- Other – Technical1 Other – Technical (1).pdf · uploaded 17 Jul 2024Source
- Other – TechnicalDeclaration of Society.pdf · uploaded 17 Jul 2024Source
- DocumentPlan 11_11zon.pdf · uploaded 18 Jul 2024Source
- Document11 Building Plan Approval _ NA Order for plotted development.pdf · uploaded 19 Jul 2024Source
- Other – TechnicalDeclaration on Units.pdf · uploaded 19 Jul 2024Source
- Other – TechnicalBalaji Icon- CC Verification mail.pdf · uploaded 25 Jul 2024Source
- Document1.pdf · uploaded 7 Nov 2024Source
- Document2.pdf · uploaded 7 Nov 2024Source
- Document3.pdf · uploaded 7 Nov 2024Source
- Document4.pdf · uploaded 7 Nov 2024Source
- Document5-8.pdf · uploaded 7 Nov 2024Source
- Document9-11.pdf · uploaded 7 Nov 2024Source
Technical (Architect)
- DocumentForm 1- Architct Certificate.pdf · uploaded 19 Jul 2024Source
- DocumentForm 1 - Balaji Icon as on Sep 2024.pdf · uploaded 20 Oct 2024Source
- DocumentForm 1- Balaji Icon as on December 2024.pdf · uploaded 3 Jan 2025Source
- DocumentForm 1 - Balaji Icon as on March 2025.pdf · uploaded 9 Apr 2025Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Chanje, Uran taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Uran Kamtha Road
- South
- Bounded by Survey No-74 and Survey No-79 2
- East
- Boundaries of Santosh Apartment
- West
- Bounded by Survey No-79
Source: registration certificates and MahaRERA's project page, as stated there.