Skip to content

Sky Natraj

Certificate Signed

Bokadvira, Raigarh 400702 |Promoter: Natraj Buildcon

14 Nov 2022Registered with MahaRERA
31 Dec 2026Promised completion
30 Apr 2027Revised completionPushed back 4 months
1Building
1Units registered20 booked (2000%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Mixed
Status on MahaRERA
Certificate Signed
Buildings
1
Unit types
1BHK, 2BHK, Shop1 unit in all
Address
Plot No. 5, Sector - 50, Sector - 50, DronagiriPIN 400702
Designated bank account
85
Developed in phases
No

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 18.87318, 72.96388
Sky Natraj is at latitude 18.87318, longitude 72.96388.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 4 months

Registered
14 Nov 2022
Promised
31 Dec 2026
Revised
30 Apr 2027

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5200004764914 Nov 202231 Dec 202630 Apr 2027Natraj BuildconProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Sky Natraj81

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

20 of 1 unit booked (2000%), as the promoter reported to MahaRERA

1BHK · 0 units2BHK · 0 unitsShop · 1 unit
TypeCarpet areaUnitsBooked
1BHK29.59 sq m · 319 sq ft02
1BHK29.64 sq m · 319 sq ft02
1BHK29.95 sq m · 322 sq ft01
1BHK30 sq m · 323 sq ft01
2BHK50.73 sq m · 546 sq ft010
Shop32.26 sq m · 347 sq ft10
Shop34.17 sq m · 368 sq ft02
Shop35.37 sq m · 381 sq ft02

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

2 documents held by Deedo, 134 filings listed on MahaRERA's project page

Extension certificate

Registration certificate

Finance

  • PAN CardNatraj Buildcon Pancard.pdf · uploaded 14 Oct 2022Source

Legal

  • Legal Title reportTitle Scan Copy - Natraj Buildcon_compressed.pdf · uploaded 14 Oct 2022Source
  • Declaration Form BForm B Promoter Sky Natraj .pdf · uploaded 14 Oct 2022Source

Migrated

  • 1 PAN CardNatraj Buildcon Pancard.pdf · uploaded 14 Oct 2022Source
  • 1 Copy of the legal title reportTitle Scan Copy - Natraj Buildcon_compressed.pdf · uploaded 14 Oct 2022Source
  • 1 a Details of encumbrances concerned to FinanceEncumbrance Finance -Sky Natraj.pdf · uploaded 14 Oct 2022Source
Show all 136 documentsShow fewer documents

Migrated

  • 1 b Details of encumbrances concerned to LegalEncumbrance Legal -Sky Natraj.pdf · uploaded 14 Oct 2022Source
  • 1 Copy of Layout Approval (in case of layout)CC DRG.pdf · uploaded 14 Oct 2022Source
  • 1 Building Plan Approval / NA Order for plotted developmentCC DRG.pdf · uploaded 14 Oct 2022Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC (2).pdf · uploaded 14 Oct 2022Source
  • 1 Declaration about Commencement CertificateFormat D -Sk Natraj.pdf · uploaded 14 Oct 2022Source
  • 1 Declaration in FORM BForm B Promoter Sky Natraj .pdf · uploaded 14 Oct 2022Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)New Format Form 3 -Sky Natraj.pdf · uploaded 14 Oct 2022Source
  • 1 Proforma of Agreement for saleAFS_Natraj Buildcon_14102022.pdf · uploaded 14 Oct 2022Source
  • 1 Proforma of Allotment letterAFS_Natraj Buildcon_14102022.pdf · uploaded 14 Oct 2022Source
  • 2 Proforma of Allotment letterALLOTMENT_12102022.pdf · uploaded 14 Oct 2022Source
  • 2 Proforma of Agreement for saleALLOTMENT_12102022.pdf · uploaded 14 Oct 2022Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A -Sky Natraj.pdf · uploaded 14 Oct 2022Source
  • 1 Deviation Report with respect to Allotment letterDeviation Allotment -Sky Natraj.pdf · uploaded 14 Oct 2022Source
  • 1 Deviation Report with respect to model copy of AgreementDeviation Agreeement -Sky Natraj.pdf · uploaded 14 Oct 2022Source
  • 1 CERSAI detailsCERSAI_Search_Report_200249731504_For_Asset_Based_Search_15_10_2022_12_05_58_185.pdf · uploaded 15 Oct 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)5-50-DRONAGIRI (2023 MARCH).pdf · uploaded 29 Apr 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)5-50-DRONAGIRI (2023 MARCH).pdf · uploaded 12 Jun 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2_compressed.pdf · uploaded 12 Jun 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Sept 23.pdf · uploaded 31 Oct 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Sky Natraj Form 2.pdf · uploaded 31 Oct 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A 2022-23.pdf · uploaded 31 Oct 2023Source
  • 1 Disclosure of sold/ booked inventoryInvetory Disc 2022-23.pdf · uploaded 31 Oct 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 _AUDIT_Natraj_22-23.pdf · uploaded 31 Oct 2023Source
  • 2 Commencement Certificates / NA Order for plotted development5-50-PCC.pdf · uploaded 18 Jan 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)SkyNatraj Form 1 18-124.pdf · uploaded 18 Jan 2024Source
  • 2 Disclosure of sold/ booked inventorySkyNatraj_inv-disc_Dec23.pdf · uploaded 18 Jan 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 SkyNatraj 19-1-24.pdf · uploaded 25 Jan 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 SkyNatraj 20-1-24.pdf · uploaded 25 Jan 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)5-50-DRONAGIRI RERA (2024 MARCH).pdf · uploaded 19 Apr 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)NB Form 2 17-4-24.pdf · uploaded 19 Apr 2024Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)NB Form 2A 23-24.pdf · uploaded 19 Apr 2024Source
  • 3 Disclosure of sold/ booked inventoryNB Inventory 17-4-24.pdf · uploaded 19 Apr 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23).pdf · uploaded 4 May 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Sky Natraj 20-4-24.pdf · uploaded 4 May 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)NB Form1 Jun23.pdf · uploaded 27 Jan 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)NB Form1 Jun24.pdf · uploaded 27 Jan 2025Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)NB Form1 Sep24.pdf · uploaded 27 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)NB Form3 Jun23.pdf · uploaded 27 Jan 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)NB Form3 Jun24.pdf · uploaded 27 Jan 2025Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)NB Form3 Mar23.pdf · uploaded 27 Jan 2025Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)NB Form3 Sep23.pdf · uploaded 27 Jan 2025Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)NB Form3 Sep24.pdf · uploaded 27 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)NB Form 2 Jun23.pdf · uploaded 27 Jan 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)NB Form 2 Jun24.pdf · uploaded 27 Jan 2025Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)NB Form 2 Sep24.pdf · uploaded 27 Jan 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)NB Form 5 23-24.pdf · uploaded 27 Jan 2025Source
  • 1 Other – TechnicalNB Consent.pdf · uploaded 18 Feb 2025Source
  • Withdrawal Update Form 15-50-DRONAGIRI RERA (2025 JUNE).pdf · uploaded 16 Feb 2026Source
  • Withdrawal Update Form 15-50-DRONAGIRI RERA (2025 SEPTEMBER).pdf · uploaded 16 Feb 2026Source
  • Withdrawal Update Form 15-50-DRONAGIRI RERA (2025 DECEMBER).pdf · uploaded 16 Feb 2026Source
  • Withdrawal Update Form 2dad0c0e1-cac2-4045-82ff-c57875bec4ed.pdf · uploaded 16 Feb 2026Source
  • Withdrawal Update Form 2NB Form 2 Sep25.pdf · uploaded 16 Feb 2026Source
  • Withdrawal Update Form 2NB Form 2 Dec25.pdf · uploaded 16 Feb 2026Source
  • Withdrawal Update Form 3b358b664-22a9-42ff-a35d-1da4b1364845.pdf · uploaded 16 Feb 2026Source
  • Withdrawal Update Form 3b358b664-22a9-42ff-a35d-1da4b1364845.pdf · uploaded 16 Feb 2026Source
  • Withdrawal Update Form 3NB f3 Dec25.pdf · uploaded 16 Feb 2026Source
  • Form 1NB Form 1 Dec22.pdf · uploaded 9 Mar 2026Source
  • Form 2NB Form 2 Dec22.pdf · uploaded 9 Mar 2026Source
  • Form 3NB Form 3 Dec22.pdf · uploaded 9 Mar 2026Source
  • Disclosure of Sold and Booked InventoryNB Inv Dec22.pdf · uploaded 9 Mar 2026Source
  • Form 1NB Form 1 Mar23.pdf · uploaded 9 Mar 2026Source
  • Form 2NB Form 2 Mar23.pdf · uploaded 9 Mar 2026Source
  • Form 3NB Form 3 Mar23.pdf · uploaded 9 Mar 2026Source
  • Disclosure of Sold and Booked InventoryNB Inv Mar23.pdf · uploaded 9 Mar 2026Source
  • Form 1NB form 1 Jun23.pdf · uploaded 9 Mar 2026Source
  • Form 2NB Form 2 Jun23.pdf · uploaded 9 Mar 2026Source
  • Form 3NB form 3 Jun23.pdf · uploaded 9 Mar 2026Source
  • Disclosure of Sold and Booked InventoryNB Inv Jun23.pdf · uploaded 9 Mar 2026Source
  • Form 1NB Form 1 Sep23.pdf · uploaded 9 Mar 2026Source
  • Form 2NB Form 2 Sep23.pdf · uploaded 9 Mar 2026Source
  • Form 3NB Form 3 Sep23.pdf · uploaded 9 Mar 2026Source
  • Disclosure of Sold and Booked InventoryNB Inv Sep23.pdf · uploaded 9 Mar 2026Source
  • Form 1NB Form 1 Dec23.pdf · uploaded 9 Mar 2026Source
  • Form 2NB Form 2 Dec23.pdf · uploaded 9 Mar 2026Source
  • Form 3NB Form 3 Dec23.pdf · uploaded 9 Mar 2026Source
  • Disclosure of Sold and Booked InventoryNB Inv Dec 23.pdf · uploaded 9 Mar 2026Source
  • Form 1NB Form 1 Mar 24.pdf · uploaded 9 Mar 2026Source
  • Form 2NB Form 2 Mar24.pdf · uploaded 9 Mar 2026Source
  • Form 3NB Form 3 Mar24.pdf · uploaded 9 Mar 2026Source
  • Disclosure of Sold and Booked InventoryNB Inv Mar24.pdf · uploaded 9 Mar 2026Source
  • Form 1NB Form 1 Jun24.pdf · uploaded 9 Mar 2026Source
  • Form 2NB Form 2 Jun24.pdf · uploaded 9 Mar 2026Source
  • Form 3NB Form 3 Jun24.pdf · uploaded 9 Mar 2026Source
  • Disclosure of Sold and Booked InventoryNB Inv Jun24.pdf · uploaded 9 Mar 2026Source
  • Form 15-50-DRONAGIRI RERA (2024 DECEMBER ) (1).pdf · uploaded 9 Mar 2026Source
  • Form 2NB Form 2 Dec24.pdf · uploaded 9 Mar 2026Source
  • Form 3NB Form 3 Dec24.pdf · uploaded 9 Mar 2026Source
  • Disclosure of Sold and Booked InventoryNB Inv Dec24.pdf · uploaded 9 Mar 2026Source
  • Form 15-50-DRONAGIRI RERA (2025 MARCH) (1).pdf · uploaded 9 Mar 2026Source
  • Form 2NB Form 2 Mar25.pdf · uploaded 9 Mar 2026Source
  • Form 3NB Form 3 Mar25.pdf · uploaded 9 Mar 2026Source
  • Disclosure of Sold and Booked InventoryNB Inv Mar25.pdf · uploaded 9 Mar 2026Source
  • Withdrawal Update Form 1NB Form 1 Jun24.pdf · uploaded 9 Mar 2026Source
  • Withdrawal Update Form 1NB Form 1 Sep 24.pdf · uploaded 9 Mar 2026Source
  • Withdrawal Update Form 2NB Form 2 Jun24.pdf · uploaded 9 Mar 2026Source
  • Withdrawal Update Form 2NB Form 2 Sep24.pdf · uploaded 9 Mar 2026Source
  • Withdrawal Update Form 3NB Form 3 Jun24.pdf · uploaded 9 Mar 2026Source
  • Withdrawal Update Form 3NB Form 3 Sep24.pdf · uploaded 9 Mar 2026Source
  • Form 2A (FY 2022-2023)NB Form 2 Mar23.pdf · uploaded 9 Mar 2026Source
  • Form 2A (FY 2023-2024)NB Form 2A 23-24.pdf · uploaded 9 Mar 2026Source
  • Form 2A (FY 2024-2025)NB Form 2A 24-25.pdf · uploaded 9 Mar 2026Source
  • Form 5 (FY 2022-2023)NB Form 5 22-23.pdf · uploaded 9 Mar 2026Source
  • Form 5 (FY 2023-2024)NB Form 5 23-24.pdf · uploaded 9 Mar 2026Source
  • Form 5 (FY 2024-2025)NB Form 5 24-25.pdf · uploaded 9 Mar 2026Source
  • Withdrawal Update Form 1NB Form 1 Sep 24.pdf · uploaded 18 Mar 2026Source
  • Withdrawal Update Form 2NB Form 2 Sep24.pdf · uploaded 18 Mar 2026Source
  • Withdrawal Update Form 3NB Form 3 Sep24.pdf · uploaded 18 Mar 2026Source
  • Form 2A (FY 2025-2026)NB Form2A Mar26.pdf · uploaded 2 Apr 2026Source
  • Withdrawal Update Form 1NB Form1 Mar26.pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 2NB Form2 Mar26.pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 3NB Form 3 Mar26.pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 1NB Form1 Jun26.pdf · uploaded 16 Jul 2026Source
  • Withdrawal Update Form 2NB Form 2 Jun26.pdf · uploaded 16 Jul 2026Source
  • Withdrawal Update Form 3NB Form3 Jun26.pdf · uploaded 16 Jul 2026Source
  • Form 5 (FY 2025-2026)NB Form5 25-26.pdf · uploaded 25 Sep 2026Source

Technical

  • DocumentCC DRG.pdf · uploaded 14 Oct 2022Source
  • DocumentCC DRG.pdf · uploaded 14 Oct 2022Source
  • Other – TechnicalNB Consent.pdf · uploaded 18 Feb 2025Source
  • Document5-CC Revised Plan.pdf · uploaded 20 Mar 2026Source
  • DocumentNB AnnextureA.pdf · uploaded 20 Mar 2026Source

Technical (Architect)

  • DocumentNB Form1 Jun23.pdf · uploaded 27 Jan 2025Source
  • DocumentNB Form1 Jun24.pdf · uploaded 27 Jan 2025Source
  • DocumentNB Form1 Sep24.pdf · uploaded 27 Jan 2025Source
  • DocumentNB Form1 Jun26.pdf · uploaded 16 Jul 2026Source

Technical (Engineer)

  • DocumentNB Form 2 Jun23.pdf · uploaded 27 Jan 2025Source
  • DocumentNB Form 2 Jun24.pdf · uploaded 27 Jan 2025Source
  • DocumentNB Form 2 Sep24.pdf · uploaded 27 Jan 2025Source
  • DocumentNB Form 2 Jun26.pdf · uploaded 16 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Bokadvira, Uran taluka

Survey, CTS, gat or plot numbers

Plot No. 5Sector - 50

Boundaries

North
3 M Pathway
South
Plot No -4
East
22 Mtr Wide Road
West
Plot No -6 and 7

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAtul Patel Architects—
Chartered accountantCA Rutuja Narsingh and Associates—
EngineerS R Consultant—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology